Plumbing Permit in Lehi, Utah

Required for plumbing installations, alterations, and repairs in Lehi including water heaters, fixture additions, and gas line work. Governed by the 2024 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103, effective 2026-07-01 (superseded the 2021 edition). Lehi's fee schedule does not publish a separate flat-fee table for plumbing permits; all permits use the standard valuation-based building permit fee schedule.

Verified 2026-07-01 · Source

When you need this permit

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit FeeAssessed on project valuation per Lehi City's building permit fee schedule, cited: Lehi City FY 2026 Fee Schedule (approved), Building Inspections section — confirmed by direct review of the full published fee schedule that no separate flat-fee plumbing table exists; plumbing permits are priced under the same valuation-based schedule as other permit types. Reinspection fee: $100.
Valuation-based per Lehi City building permit fee schedule

Review timeline

Plan reviewTypical estimate — confirm current times with the Lehi building department
~3–10 business days

How long did your Plumbing Permit permit actually take in Lehi?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground / Slab

    Before concrete pour — verify pipe slope, materials, and cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed — pressure test required

  3. 3

    Final

    All fixtures connected, water flowing, no leaks, proper venting verified

See the full Lehi inspection guide — scheduling & re-inspection fees →

Tips

  • Water heater replacements in Lehi require a permit even for like-for-like swaps.
  • Lehi follows the 2024 IPC, effective July 1, 2026 (superseded the 2021 edition).
  • Gas line work requires a gas piping diagram; a Gas Pipe Diagram Example is available on the Lehi Building Permit Submittal Portal.
  • Schedule inspections at least 24 hours in advance by calling (385) 201-1035. Inspections will not be scheduled by voicemail, email, or online.
  • Utah allows homeowners to perform plumbing work on their own primary residence, but a permit and inspections are still required.

Frequently asked questions

Yes. Lehi requires a plumbing permit for all water heater installations and replacements, including like-for-like swaps. A licensed plumber or the homeowner (owner-occupied only) can pull the permit. Submit via the Lehi Building Permit Submittal Portal.

Lehi does not publish a separate flat-fee plumbing permit table. Plumbing permit fees are valuation-based per the Lehi City FY 2026 Fee Schedule. Contact Lehi Building and Inspections at (385) 201-1035 for a project-specific estimate.

Plan review for a plumbing permit in Lehi typically runs 3–10 business days. This is an estimate, not a published figure — confirm current review times with Lehi City Building and Inspections at (385) 201-1035.

You'll need: Building Permit Application. Depending on your project, Lehi may also ask for: Gas Piping Diagram; Contractor License. See the required-documents checklist on this page for details on each.

Lehi requires 3 inspection(s) for a plumbing permit, in order: Underground / Slab, Rough-In, Final. Schedule each through Lehi City Building and Inspections ((385) 201-1035).

Apply through Lehi City Building and Inspections at 153 N 100 E, Lehi, UT 84043. Phone: (385) 201-1035, email: building@lehi-ut.gov. Office hours: Mon–Thu 8 a.m.–5 p.m. (office); phone hours Mon–Thu 7:30 a.m.–5 p.m., Fri 8 a.m.–3:30 p.m. — call (385) 201-1035 to confirm. Official information: https://www.lehi-ut.gov/departments/building-and-inspections/.

Lehi, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page still lists 'Current Codes: 2021 I Codes' — the city's page has not been updated to reflect the 2024 editions that took effect statewide on 2026-07-01.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page lists '2020 NEC' — this is stale independent of the 7/1/2026 code cycle; the 2023 NEC has governed statewide since its own adoption (predating this fix and not caused by it).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; ICC/ANSI A117.1-2017 (Accessible and Usable Buildings and Facilities) — Lehi City Building and Inspections page; NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Lehi's own page (lehi-ut.gov/departments/building-and-inspections/) was checked live on 2026-07-16 and still reads 'Current Codes: 2021 I Codes' / '2020 NEC' — it reflects neither the 2024 code cycle nor the separately longer-standing 2023 NEC.. Local amendments apply — see the Lehi overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.