Basement Finish Permit in Lehi, Utah
Required for finishing or remodeling an unfinished basement in Lehi, including framing, electrical, plumbing, and mechanical work. Processed as a building permit using the standard valuation-based fee schedule; finished basement space is valued at $74.74 per sq ft per the Lehi FY 2026 Fee Schedule.
Verified 2026-06-30 · Source
When you need this permit
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window per 2021 IRC)
- Adding a bathroom (plumbing work requires plumbing permit)
- Electrical wiring for new rooms
- Any structural modifications
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing
Wall framing, fire blocking, egress window openings
- 2
MEP Rough-In
Electrical, plumbing, and HVAC rough-ins before walls closed
- 3
Insulation
Insulation on exterior walls, vapor barrier placement
- 4
Final
Drywall, fixtures, smoke/CO detectors, all finishes complete
See the full Lehi inspection guide — scheduling & re-inspection fees →
Tips
- Every basement bedroom in Lehi requires an egress window — 5.7 sq ft minimum opening, sill no higher than 44 inches above the floor per the 2021 IRC.
- Window wells deeper than 44 inches require a permanently attached ladder or steps.
- Do not fully enclose the furnace/water heater room without providing adequate combustion air.
- Smoke detectors are required in every bedroom, outside sleeping areas, and on every level.
- Schedule inspections at least 24 hours in advance by calling (385) 201-1035.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lehi
Basement Finish Permit in other cities
Compare basement finish permit fees across Utah →
Look up this fee in a different city →