Fire Sprinkler System Permit — Lehi, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://www.lehi-ut.gov/media/kqtbdrwr/2026-fee-schedule-approved.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Sprinkler System Permit in Lehi, Utah
Lehi City's own FY 2026 Fee Schedule publishes a dedicated 'FIRE' section (Lehi Fire Department) with a distinct fee table for Automatic Fire Sprinkler Systems, priced by sprinkler head count rather than a flat fee, plus a separate lower table for sprinkler system remodels/tenant finish work.
Verified 2026-07-20 · Source
When you need this permit
- New automatic fire sprinkler system installation, or remodel/tenant finish work to an existing system, in the city of Lehi
- Plan review fee tier determined by the number of sprinkler heads in the system
- Underground flush and final acceptance (hydrostatic/acceptance) testing required before occupancy
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Underground Flush
Required acceptance-testing step for new sprinkler system installations, per the Fee Schedule's 'Acceptance Testing' table.
- 2
Final Occupancy — Hydrostatic / Acceptance Test
Required before occupancy; billed at $80.00 per the FY 2026 Fee Schedule (or per additional hour over 2 hours for extended tests).
See the full Lehi inspection guide — scheduling & re-inspection fees →
Tips
- Lehi's sprinkler plan review fee is tiered by sprinkler head count, not a flat rate — confirm the head count with your engineer before budgeting, since the fee jumps from $125 (under 100 heads) to $275 base plus $0.50/head (300+ heads).
- A separate, lower-cost fee table applies to sprinkler system remodels or tenant finish work versus new installations (e.g., $65 vs. $125 for the smallest plan-review tier) — make sure the correct table is used when the work is to an existing system.
- An expedited 'Plan Review Rush - Sprinkler' option is available for $200.00 (FY 2026) if faster turnaround is needed, per the city's Fee Schedule.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lehi
Fire Sprinkler System Permit in other cities
Compare fire sprinkler system permit fees across Utah →
Look up this fee in a different city →