Fire Alarm System Permit in Lehi, Utah

Lehi City's FY 2026 Fee Schedule publishes a distinct fee table for Fire Alarm Systems within its 'FIRE' section, priced separately from the Automatic Fire Sprinkler Systems table and split by new system, remodel, and additional-floor scope.

Verified 2026-07-20 · Source

When you need this permit

  • New fire alarm system installation, remodel of an existing system, or addition of floors to an existing monitored system, in the city of Lehi
  • Plan review submitted to Lehi Fire Department identifying the scope (new system vs. remodel vs. additional floors)
  • Acceptance test required before final sign-off

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Review — New SystemLehi City FY 2026 Fee Schedule (approved), 'FIRE' section, 'Fire Alarm Systems > Plan Review' table, FY 2026 approved column.
$115.00
Plan Review — RemodelLehi City FY 2026 Fee Schedule (approved), same table.
$65.00
Plan Review — Additional FloorsLehi City FY 2026 Fee Schedule (approved), same table.
$60.00
Acceptance (per hour over 2 hours)Lehi City FY 2026 Fee Schedule (approved), 'Fire Alarm Systems' table (up from $60.00 in FY 2024).
$80.00
Plan Review Rush — AlarmLehi City FY 2026 Fee Schedule (approved), 'FIRE' section, general fee list.
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your Fire Alarm System Permit permit actually take in Lehi?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Acceptance Test

    Billed at $80.00 per hour over the first 2 hours, per the FY 2026 Fee Schedule's Fire Alarm Systems table.

See the full Lehi inspection guide — scheduling & re-inspection fees →

Tips

  • Lehi prices fire alarm plan review by scope, not head/device count: $115.00 for a new system, $65.00 for a remodel, and $60.00 for adding floors to an existing system.
  • An expedited 'Plan Review Rush - Alarm' option is available for $100.00 (FY 2026) if faster turnaround is needed.
  • Commercial cooking hood suppression systems are priced separately under the 'Commercial Hood Systems' line ($115.00 plan review per hood) — not part of this fire alarm entry.

Frequently asked questions

Lehi requires a fire alarm system permit for: New fire alarm system installation, remodel of an existing system, or addition of floors to an existing monitored system, in the city of Lehi; Plan review submitted to Lehi Fire Department identifying the scope (new system vs. remodel vs. additional floors); Acceptance test required before final sign-off. If your project isn't listed, confirm with Lehi City Building and Inspections at (385) 201-1035 before starting work.

Per Lehi City's FY 2026 Fee Schedule, plan review for a new fire alarm system is $115.00, a remodel is $65.00, and adding floors to an existing system is $60.00. Acceptance testing beyond the first 2 hours is billed at $80.00 per additional hour.

Lehi does not publish a plan-review timeline for this permit. Contact Lehi City Building and Inspections at (385) 201-1035 for current turnaround.

You'll need: Fire Alarm Plan Review Submittal. See the required-documents checklist on this page for details on each.

Lehi requires 1 inspection(s) for a fire alarm system permit, in order: Acceptance Test. Schedule each through Lehi City Building and Inspections ((385) 201-1035).

Apply through Lehi City Building and Inspections at 153 N 100 E, Lehi, UT 84043. Phone: (385) 201-1035, email: building@lehi-ut.gov. Office hours: Mon–Thu 8 a.m.–5 p.m. (office); phone hours Mon–Thu 7:30 a.m.–5 p.m., Fri 8 a.m.–3:30 p.m. — call (385) 201-1035 to confirm. Official information: https://www.lehi-ut.gov/departments/building-and-inspections/.

Lehi, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page still lists 'Current Codes: 2021 I Codes' — the city's page has not been updated to reflect the 2024 editions that took effect statewide on 2026-07-01.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page lists '2020 NEC' — this is stale independent of the 7/1/2026 code cycle; the 2023 NEC has governed statewide since its own adoption (predating this fix and not caused by it).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; ICC/ANSI A117.1-2017 (Accessible and Usable Buildings and Facilities) — Lehi City Building and Inspections page; NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Lehi's own page (lehi-ut.gov/departments/building-and-inspections/) was checked live on 2026-07-16 and still reads 'Current Codes: 2021 I Codes' / '2020 NEC' — it reflects neither the 2024 code cycle nor the separately longer-standing 2023 NEC.. Local amendments apply — see the Lehi overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.