Skip to main content
PermitBase

Commercial Building Permit in Lehi, Utah

Required for new commercial building construction in Lehi, including new shell/ground-up commercial structures. Governed by the 2024 International Building Code (IBC) as adopted by Utah Code § 15A-2-103, effective 2026-07-01. Uses the same valuation-based building permit fee table as residential (90% of the ICC Building Valuation Data), but plan review is billed at the Non-Residential rate of 65% of the permit fee (versus 40% for residential), plus a 1% state surcharge. Major commercial/industrial projects requiring third-party plan review are billed at third-party charges plus 10%.

Verified 2026-07-19 · Source

When you need this permit

  • New commercial building construction (new shell or ground-up commercial structure)
  • One complete set of digital plans at time of permit submittal
  • Code analysis sheet documenting finished/unfinished square feet, correct address, parcel number, construction type, occupancy type, and sprinkler status
  • One structural packet, digital, in a separate PDF
  • Energy envelope compliance: interior and exterior lighting and mechanical compliance checks, signed and dated
  • Geo tech report
  • Complete Building Permit Application with all contractor information, license number, and signature

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 7 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation-based (same schedule as residential)Lehi City FY 2026 Fee Schedule (approved), Building Inspections section: 'Building Permits (valuation based on 90% of the ICC Building Valuation Data - AUGUST 2024)' — this applies to all building permits, including commercial. No separate commercial per-square-foot valuation table is published; the fee schedule's own 'Building Valuation Calculator' sub-table (Main Floor $149.47/sq ft, etc.) is labeled for Single-Family Residential construction types only.
Valuation-based per Lehi City building permit fee schedule (90% of ICC Building Valuation Data, August 2024)
Plan Review Fee — Non-Residential (Commercial)Lehi City FY 2026 Fee Schedule (approved), Building Inspections section, 'Plan Review' subsection: 'Non-Residential (as % of permit fee) 65%' (compare Residential at 40%).
65% of the building permit fee
Third-Party Plan Review — Major Commercial/IndustrialLehi City FY 2026 Fee Schedule (approved), Building Inspections section: 'Third-Party Plan Review (major commercial/industrial)' — FY 2026 column reads 'Third Party Charges plus 10%'.
Third Party Charges plus 10%
State SurchargeLehi City FY 2026 Fee Schedule (approved), Building Inspections section: '+ State charge (as % of permit fee) 1%' — same rate line applies to both residential and non-residential permit fees.
1% of the building permit fee
Reinspection FeeLehi City FY 2026 Fee Schedule (approved), Building Inspections section — flat reinspection fee applies citywide to all permit types when a project is not ready for a scheduled inspection.
$100

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Lehi?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour — verify forms, rebar, footings, and anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation and wall closure

  3. 3

    MEP Rough-In

    Mechanical, electrical, and plumbing rough-ins before walls closed

  4. 4

    Final

    All work complete, energy envelope and life-safety systems verified, ready for occupancy

See the full Lehi inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial building permit plan review in Lehi is billed at 65% of the permit fee (non-residential rate), versus 40% for residential.
  • Major commercial or industrial projects may require third-party plan review, billed at third-party review charges plus 10%, per the FY 2026 Fee Schedule.
  • All commercial permit applications — including compliance checks, structural, and geo tech reports — must be submitted electronically through the Lehi City Building Permit Submittal Portal (lehibuilding.portal.iworq.net).
  • A corrected digital plan set must be submitted following plan review before the permit is issued for construction.
  • Schedule inspections at least 24 hours in advance by calling (385) 201-1035.

Frequently asked questions

Lehi requires a commercial building permit for: New commercial building construction (new shell or ground-up commercial structure); One complete set of digital plans at time of permit submittal; Code analysis sheet documenting finished/unfinished square feet, correct address, parcel number, construction type, occupancy type, and sprinkler status; One structural packet, digital, in a separate PDF; Energy envelope compliance: interior and exterior lighting and mechanical compliance checks, signed and dated; Geo tech report; Complete Building Permit Application with all contractor information, license number, and signature. If your project isn't listed, confirm with Lehi City Building and Inspections at (385) 201-1035 before starting work.

Commercial building permits in Lehi use the same valuation-based fee table as residential permits (based on 90% of the ICC Building Valuation Data), but plan review is charged at 65% of the permit fee for non-residential projects instead of the 40% residential rate, plus a 1% state surcharge. Major commercial or industrial projects requiring third-party plan review are billed at third-party charges plus 10%. Fees per the Lehi City FY 2026 Fee Schedule (approved).

Lehi does not publish a plan-review timeline for this permit. Contact Lehi City Building and Inspections at (385) 201-1035 for current turnaround.

You'll need: Building Permit Application; Digital Plan Set (initial); Digital Plan Set (corrected); Code Analysis Sheet; Structural Packet; Energy Envelope Compliance Documentation; Geo Tech Report. See the required-documents checklist on this page for details on each.

Lehi requires 4 inspection(s) for a commercial building permit, in order: Foundation, Framing, MEP Rough-In, Final. Schedule each through Lehi City Building and Inspections ((385) 201-1035).

Apply through Lehi City Building and Inspections at 153 N 100 E, Lehi, UT 84043. Phone: (385) 201-1035, email: building@lehi-ut.gov. Office hours: Mon–Thu 8 a.m.–5 p.m. (office); phone hours Mon–Thu 7:30 a.m.–5 p.m., Fri 8 a.m.–3:30 p.m. — call (385) 201-1035 to confirm. Official information: https://www.lehi-ut.gov/departments/building-and-inspections/.

Lehi, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page still lists 'Current Codes: 2021 I Codes' — the city's page has not been updated to reflect the 2024 editions that took effect statewide on 2026-07-01.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page lists '2020 NEC' — this is stale independent of the 7/1/2026 code cycle; the 2023 NEC has governed statewide since its own adoption (predating this fix and not caused by it).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; ICC/ANSI A117.1-2017 (Accessible and Usable Buildings and Facilities) — Lehi City Building and Inspections page; NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Lehi's own page (lehi-ut.gov/departments/building-and-inspections/) was checked live on 2026-07-16 and still reads 'Current Codes: 2021 I Codes' / '2020 NEC' — it reflects neither the 2024 code cycle nor the separately longer-standing 2023 NEC.. Local amendments apply — see the Lehi overview page for the full list.

No. Lehi's FY 2026 Fee Schedule publishes per-square-foot valuation rates only for single-family residential construction (Main Floor and Second Floor at $149.47 per sq ft, Finished Basement at $74.74 per sq ft). No commercial-specific per-square-foot valuation table is published; commercial project valuation is calculated from the full ICC Building Valuation Data tables by occupancy and construction type, on the same 90% basis stated for all building permits.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Lehi.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.