Deck Permit in Lehi, Utah

Required for new deck construction or structural modification of existing decks in Lehi. Permit fees are valuation-based per the Lehi City building permit fee schedule — Lehi does not publish a separate flat-fee table for deck permits.

Verified 2026-07-13 · Source

When you need this permit

  • New deck construction attached to the house (ledger connection per IRC R507.2)
  • Decks more than 30 inches above grade
  • Structural modifications to existing decks
  • New deck over 200 sq ft (confirm threshold with Lehi — small ground-level platforms may be exempt)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Deck Permit FeeAssessed on project valuation per Lehi City's building permit fee schedule, cited: Lehi City FY 2026 Fee Schedule (approved), Building Inspections section — confirmed by direct review of the full published fee schedule that no separate flat-fee deck table exists; deck permits use the standard valuation-based building permit fee schedule. Plan review: 40% (residential). State surcharge: 1%. Reinspection fee: $100.
Valuation-based per Lehi City building permit fee schedule

Review timeline

Plan reviewTypical estimate — confirm current times with the Lehi building department
~5–14 business days

How long did your Deck Permit permit actually take in Lehi?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Verify footing depth (below 30-inch frost line), diameter, and rebar before concrete pour

  2. 2

    Framing

    Posts, beams, joists, ledger connection, and hardware

  3. 3

    Final

    Decking, stairs, guards, and railings complete — 36-inch guard height required at 30 inches above grade per IRC

See the full Lehi inspection guide — scheduling & re-inspection fees →

Tips

  • Footings in Lehi must extend below the frost line — minimum 30 inches per Lehi's published Design Criteria (Lehi City Building and Inspections page).
  • Deck guards are required when the deck surface is 30 inches or more above grade per the 2021 IRC.
  • Ledger boards must be positively attached with lag screws or through-bolts — nails are not allowed per IRC R507.2.
  • Schedule inspections at least 24 hours in advance by calling (385) 201-1035.

Frequently asked questions

Yes, in most cases. Lehi requires a permit for decks over 200 square feet, decks more than 30 inches above grade, and any deck attached to the house. Small ground-level platforms may be exempt — confirm with Lehi Building and Inspections at (385) 201-1035.

In Lehi, the published Deck Permit Fee is: Valuation-based per Lehi City building permit fee schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a deck permit in Lehi typically runs 5–14 business days. This is an estimate, not a published figure — confirm current review times with Lehi City Building and Inspections at (385) 201-1035.

You'll need: Building Permit Application; Deck Plans; Site Plan; Ledger Detail. See the required-documents checklist on this page for details on each.

Lehi requires 3 inspection(s) for a deck permit, in order: Footings, Framing, Final. Schedule each through Lehi City Building and Inspections ((385) 201-1035).

Apply through Lehi City Building and Inspections at 153 N 100 E, Lehi, UT 84043. Phone: (385) 201-1035, email: building@lehi-ut.gov. Office hours: Mon–Thu 8 a.m.–5 p.m. (office); phone hours Mon–Thu 7:30 a.m.–5 p.m., Fri 8 a.m.–3:30 p.m. — call (385) 201-1035 to confirm. Official information: https://www.lehi-ut.gov/departments/building-and-inspections/.

Lehi, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page still lists 'Current Codes: 2021 I Codes' — the city's page has not been updated to reflect the 2024 editions that took effect statewide on 2026-07-01.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page lists '2020 NEC' — this is stale independent of the 7/1/2026 code cycle; the 2023 NEC has governed statewide since its own adoption (predating this fix and not caused by it).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; ICC/ANSI A117.1-2017 (Accessible and Usable Buildings and Facilities) — Lehi City Building and Inspections page; NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Lehi's own page (lehi-ut.gov/departments/building-and-inspections/) was checked live on 2026-07-16 and still reads 'Current Codes: 2021 I Codes' / '2020 NEC' — it reflects neither the 2024 code cycle nor the separately longer-standing 2023 NEC.. Local amendments apply — see the Lehi overview page for the full list.

Deck footings in Lehi must extend below the frost line — minimum 30 inches per Lehi City's published Design Criteria (Frost Line Depth: Minimum 30 inches, per Lehi City Building and Inspections page).

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.