Deck Permit — Herriman, Utah · Requirements sheet
Verified 2026-06-30 · Source: https://www.herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Deck Permit in Herriman, Utah
Required for new deck construction or structural modification of existing decks in Herriman. The fee schedule lists separate flat fees for open decks ($139) and covered decks ($222).
Verified 2026-06-30 · Source
When you need this permit
- New deck construction attached to or detached from the house
- Decks more than 30 inches above grade
- Structural modifications to existing decks
- Adding or replacing a deck ledger
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Footings
Verify footing depth (minimum 30 inches — Herriman frost depth), diameter, and rebar before concrete pour
- 2
Framing
Posts, beams, joists, ledger connection, and hardware
- 3
Final
Decking, stairs, guards, and railings complete — 36-inch guard height required when deck is over 30 inches above grade
See the full Herriman inspection guide — scheduling & re-inspection fees →
Tips
- Herriman charges $139 for an open deck and $222 for a covered deck per the Master Fee Schedule (effective July 1, 2026).
- Footings in Herriman must extend below the frost line — minimum 30 inches from bottom of footing to finished grade per Herriman design criteria.
- Deck guards are required when the deck surface is 30 inches or more above grade — minimum 36-inch guard height per 2021 IRC.
- Ledger boards must be positively attached with lag screws or through-bolts — nails are not allowed per 2021 IRC R507.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Herriman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Herriman's permit history is searchable by address
29,242 permits in our copy of Herriman's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Herriman has issued.
27,701 of these 29,242 permits — 94.7% — carry an issued date, and those run from 1985 to 2026. The remaining 1,541 have no date at all.
Other permits in Herriman
Deck Permit in other cities
Compare deck permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Herriman project checklist
Describe your project once and get every permit, document, and fee it triggers in Herriman — in one checklist. Free, for any city and any number of projects.
Get started →