Deck Permit in Herriman, Utah

Required for new deck construction, replacement, or structural modifications to existing decks in Herriman.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Deck Permit$139
Covered Deck Permit$222

Review timeline

~514 business days

Typical estimate — confirm current times with the Herriman building department

Inspection process

  1. 1

    Footings

    Verify footing depth (below frost line), diameter, and rebar before concrete pour

  2. 2

    Framing

    Posts, beams, joists, ledger connection, and hardware

  3. 3

    Final

    Decking, stairs, guards, and railings complete — 36-inch guard height required

Tips

Frequently asked questions

Do I need a permit to build a deck in Herriman?
Yes, in most cases. Herriman requires a permit for decks over 200 square feet, decks more than 30 inches above grade, and any deck attached to the house. Small ground-level platforms may be exempt.
How deep do deck footings need to be in Herriman?
Deck footings in Herriman must extend below the frost line, which is typically 30 inches in the Utah Wasatch Front area. Your specific area may vary — check with Herriman building department.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Herriman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Herriman

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.