Residential Building Permit in Herriman, Utah
Required for new residential construction, additions, and structural alterations in Herriman.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Complete construction drawings to scale (floor plans, elevations, sections, structural details). Most Utah jurisdictions now require a single PDF set uploaded through their online permit portal.
- Req
Site Plan
Property survey showing setbacks and footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| SFD Permit ($2,000 or less) | $19 + $3.88 per $100 over $500 | — |
| SFD Permit ($2,001-$25,000) | $88 + $16.28 per $1,000 over $2,000 | — |
| SFD Permit ($25,001-$50,000) | $519 + $13.96 per $1,000 over $25,000 | — |
| SFD Permit ($50,001-$100,000) | $902 + $10.86 per $1,000 over $50,000 | — |
| SFD Permit ($100,001-$500,000) | $1,507 + $6.98 per $1,000 over $100,000 | — |
| SFD Permit ($500,001-$1,000,000) | $5,260 + $4.65 per $1,000 over $500,000 | — |
| SFD Permit (over $1,000,000) | $8,276 + $3.88 per $1,000 over $1,000,000 | — |
| Plan Review | 65% of building permit fee | — |
| State Surcharge | 1% of all permit fees combined | — |
Review timeline
10–15 business days
Herriman’s published plan-review target
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- Submit plans digitally through the Herriman City portal for faster review.
- Schedule inspections at least 24 hours in advance.
- Herriman enforces strict setback requirements — verify with planning before design.
Frequently asked questions
- How much does a residential building permit cost in Herriman?
- Herriman charges $0.25 per square foot plus a valuation-based fee calculated from the ICC building valuation table. Plan review is an additional 65% of the permit fee.
- How long does permit review take in Herriman?
- Herriman estimates approximately 10-15 working days for single-family dwelling plan review. Detached structures are similar; basement finishes run about 7-10 working days. Times vary by project scope and workload.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Herriman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Herriman
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.