Electrical Permit in Herriman, Utah
Required for electrical work including panel upgrades, new circuits, rewiring, and service changes in Herriman.
Verified 2026-06-27 · Source
When you need this permit
- New electrical circuits or wiring
- Electrical panel upgrades or replacements
- Service entrance changes (100A to 200A, etc.)
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- Req
Electrical Plan
Single-line diagram showing panel schedule and circuit layout
- Req
Load Calculation
NEC Article 220 load calculation for service upgrades
- Req
Contractor License
Valid Utah electrical contractor license (DOPL)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit (Residential) | $100 | — |
| Electrical Permit (Non-Residential) | $153 | — |
| Each Additional Meter on Same Inspection | $10 | — |
| Each New or Modified Circuit | $5 | — |
Review timeline
7–10 business days
Herriman’s published plan-review target
Inspection process
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Service/Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
Tips
- All electrical work in Herriman must comply with the 2020 National Electrical Code (NEC).
- Homeowners may pull their own electrical permit but the work must still pass inspection.
- AFCI protection is required on all 15A and 20A bedroom circuits.
- GFCI protection required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
Frequently asked questions
- Do I need an electrical permit in Herriman?
- Yes. Herriman requires an electrical permit for any new wiring, circuits, panel upgrades, or service changes. Minor repairs like replacing a switch or outlet in kind do not require a permit.
- Can I do my own electrical work in Herriman?
- Utah allows homeowners to perform electrical work on their own primary residence, but you must still obtain a permit from Herriman and pass all required inspections.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Herriman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Herriman
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.