Skip to main content
PermitBase

Electrical Permit in Fruit Heights, Utah

Required for electrical work in Fruit Heights, including new circuits, service changes, and (per the city's official FAQ) solar panel installations. No dedicated flat electrical-permit fee is published on the official Building Fee Schedule; the general valuation-based Building Permit Fee framework applies. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the city's official Building Fee Schedule (PDF verified directly 2026-07-19) publishes no separate EV-specific line item or process.

Reviewed 2026-07-08 · Source

When you need this permit

  • New electrical circuits, wiring installations, or service upgrades regulated by the adopted 2017 NEC
  • Solar panel (PV) installations require an Electrical Permit per the city's official Building Permits FAQ

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Fruit Heights?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough / Final Electrical

    Scheduled via (801) 546-0861 ext. 2 per the official Building Permits page.

See the full Fruit Heights inspection guide — scheduling & re-inspection fees →

Tips

  • Solar panel (PV) installation in Fruit Heights is processed as an Electrical Permit, per the city's official Building Permits FAQ — there is no separate 'solar permit' type.
  • Micro-inverter and string-inverter PV systems each have their own official plan-review checklists posted on the Building Permits page.
  • Installing an EV charger (EVSE) also uses this same Electrical Permit — Fruit Heights does not publish a separate EV-charger permit or fee line item.

Frequently asked questions

An Electrical Permit, applied for through the same CivicReview building-permit application portal used for other permit types, per the city's official Building Permits page.

Fruit Heights does not publish a plan-review timeline for this permit. Contact Fruit Heights City Building Department at (801) 546-0861 ext. 2 for current turnaround.

You'll need: Building Permit Application (CivicReview portal). See the required-documents checklist on this page for details on each.

Fruit Heights requires 1 inspection(s) for an electrical permit, in order: Rough / Final Electrical. Schedule each through Fruit Heights City Building Department ((801) 546-0861 ext. 2).

Apply through Fruit Heights City Building Department at 910 S Mountain Road, Fruit Heights, UT 84037. Phone: (801) 546-0861 ext. 2, email: ckunkel@fruitheights.gov. Office hours: Not published on the city's Building or Contact Us pages as of 2026-07-08; general city hall contact is (801) 546-0861.. Official information: https://www.fruitheights.gov/112/Building.

Fruit Heights, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide-mandatory edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026, binding on Fruit Heights as a Utah municipality per § 15A-1-204. Fruit Heights City's own official Building Permits page 'Design Criteria' section (fruitheights.gov/251/Building-Permits) still lists '2018 International Building Code' as of a live re-check on 2026-07-16 — a genuine lag on the city's own page; the statewide statute governs regardless.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Fruit Heights' Design Criteria page lists '2015 International Residential Code' as of 2026-07-16 — a pre-existing lag on the city's page (predates and is unrelated to the 2026 flip), also superseded by the statewide-mandatory 2021 edition.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026. Fruit Heights' Design Criteria page lists '2018 Mechanical... Code' as of 2026-07-16 — a lag on the city's own page.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026. Fruit Heights' Design Criteria page lists '2018... Plumbing... Code' as of 2026-07-16 — a lag on the city's own page.; 2024 International Energy Conservation Code (IECC) — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. Fruit Heights' Design Criteria page lists '2018... Energy Code' as of 2026-07-16 — a lag on the city's own page.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update. Fruit Heights' Design Criteria page lists '2017 Electrical Code' as of 2026-07-16 — a pre-existing lag on the city's page (the statewide NEC cycle has advanced 2017→2020→2023 across multiple prior update cycles, predating and unrelated to the July 2026 IBC/IPC/IMC/IECC flip).; 2024 International Fuel Gas Code (IFGC), 2024 International Existing Building Code (IEBC), and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — adopted statewide per Utah Code § 15A-2-103(1)(f), (1)(i), and (1)(n) respectively; none of these titles are separately itemized on Fruit Heights' own Design Criteria page (which lists only Building, Residential, Mechanical, Plumbing, Energy, and Electrical), but all apply statewide regardless of the page's omission.; Note: the city's codified Municipal Code Title 9, Chapter 1 (Building Codes and Regulations; amlegal/city PDF, last amended 'July 2006') still references the legacy 'Uniform Building Code, current edition' and Utah Plumbing/Electrical codes by older nomenclature and has not been re-codified to reflect the state's IBC/IRC adoption cycle under Utah Code § 15A-2-103; the statewide statute is authoritative as a matter of law regardless of either the live Building Permits page's lag or Title 9 Chapter 1's older nomenclature, consistent with Title 9 Chapter 1 § 9-1-3's own provision that subsequent code editions are 'deemed adopted automatically... without further action of the city council.'. Local amendments apply — see the Fruit Heights overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fruit Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.