EV Charger / EVSE Permit — Fruit Heights, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.fruitheights.gov/251/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Fruit Heights, Utah
Fruit Heights does not publish a separate EV-charger/EVSE permit or fee. Installing an EV charger is electrical work and is processed under the city's general Electrical Permit — the same permit used for solar panel (PV) installations per the city's official Building Permits FAQ. No dedicated flat electrical-permit fee is published on the official Building Fee Schedule (verified directly 2026-07-19); the general valuation-based Building Permit Fee framework applies instead. EV chargers fall under this general Electrical Permit with no EV-specific line item or process published.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Fruit Heights
- Electrical work regulated by the adopted 2017 NEC
- Building Permit Application submitted online via the CivicReview portal (app.civicreview.com), the same portal used for other building-permit types
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Scheduled via (801) 546-0861 ext. 2 per the official Building Permits page.
See the full Fruit Heights inspection guide — scheduling & re-inspection fees →
Tips
- Fruit Heights has no separate EV-charger permit or fee line item — file the installation as a general Electrical Permit through the CivicReview portal.
- Solar panel (PV) installation in Fruit Heights is also processed as an Electrical Permit, per the city's official Building Permits FAQ — the city treats several types of electrical-only work the same way.
- Because no dedicated flat electrical-permit fee is published, confirm the applicable fee with the Building Department, (801) 546-0861 ext. 2, before applying.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fruit Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Fruit Heights
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Fruit Heights project checklist
Describe your project once and get every permit, document, and fee it triggers in Fruit Heights — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →