Electrical Permit in Draper, Utah
Required for electrical work in Draper including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Draper charges a flat $150 electrical permit fee. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the city's Consolidated Fee Schedule (Resolution 26-29) publishes no separate EV-charger-installation permit fee — the schedule's only distinct 'Electric Vehicle Charging Station' line item (Res 20-31, items 277-279) is an unrelated per-kilowatt-hour usage fee for charging at Draper's own public Level 2 charging stations, not an installation permit.
Verified 2026-07-13 · Source
When you need this permit
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
See the full Draper inspection guide — scheduling & re-inspection fees →
Tips
- All electrical work in Draper must comply with the 2023 National Electrical Code (NEC), adopted statewide by Utah Code § 15A-2-103(1)(g).
- Utah law allows homeowners to perform electrical work on their own primary residence, but a Draper permit and all required inspections are still mandatory.
- AFCI protection is required on all 15A and 20A bedroom circuits under the 2023 NEC.
- GFCI protection is required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
- Installing a home EV charger (EVSE) uses this same flat $150 Electrical Permit — Draper does not publish a separate EV-charger installation permit or fee; don't confuse this with the city's unrelated per-kWh usage fee for its own public charging stations.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Draper
Electrical Permit in other cities
Compare electrical permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Draper project checklist
Describe your project once and get every permit, document, and fee it triggers in Draper — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →