Basement Finish Permit — Draper, Utah · Requirements sheet
Verified 2026-07-13 · Source: https://www.draperutah.gov/business-development/building-and-renovating/building-permits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Basement Finish Permit in Draper, Utah
Required for finishing or remodeling an unfinished basement in Draper. Draper publishes a specific Basements submittal checklist. Processed as a Remodel/Alteration permit; fees are ICC valuation-based.
Verified 2026-07-13 · Source
When you need this permit
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window per IRC)
- Adding a bathroom (requires separate plumbing permit)
- Electrical wiring for new rooms (requires separate electrical permit)
- Any structural modifications
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing
Wall framing, fire blocking, egress window wells and openings verified
- 2
MEP Rough-In
Electrical, plumbing, and HVAC rough-ins before walls closed
- 3
Insulation
Insulation on exterior walls, vapor barrier placement
- 4
Final
Drywall, fixtures, smoke/CO detectors, and all finishes complete
See the full Draper inspection guide — scheduling & re-inspection fees →
Tips
- Draper publishes a Basements submittal checklist (basement-2023.pdf) — download from the Building Permits page before applying.
- Every basement bedroom requires an egress window — 5.7 sq ft minimum opening, sill no higher than 44 inches above the floor.
- The furnace/water heater room needs combustion air — do not fully enclose it without an adequate air supply.
- Smoke detectors are required in every bedroom, outside sleeping areas, and on every level per the adopted IRC.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Draper
Basement Finish Permit in other cities
Compare basement finish permit fees across Utah →
Look up this fee in a different city →