Residential Building Permit in Draper, Utah
Required for new residential construction, additions, and structural alterations in Draper.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Complete construction drawings to scale (floor plans, elevations, sections, structural details). Most Utah jurisdictions now require a single PDF set uploaded through their online permit portal.
- Req
Site Plan
Property survey showing setbacks and footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
- Opt
Geotechnical Report
Soils report for hillside properties or areas with known geologic hazards
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | 100% of UBC Schedule (valuation-based): $23.50 (up to $500); $23.50 + $3.05/each $100 over $500 (to $2,000); $69.25 + $14/each $1,000 over $2,000 (to $25,000); $391.75 + $10.10/each $1,000 over $25,000 (to $50,000); $643.75 + $7/each $1,000 over $50,000 (to $100,000); $993.75 + $5.60/each $1,000 over $100,000 (to $500,000); $3,233.75 + $4.75/each $1,000 over $500,000 (to $1,000,000); $5,608.75 + $3.65/each $1,000 over $1,000,000 | — |
| Plan Review | 100% of UBC Schedule | — |
| Reinspection Fee | $85 per inspection | — |
| After-Hours Inspection | $85/hour (2 hour minimum) | — |
| State Surcharge | 1% of permit fee | — |
Review timeline
~10–21 business days
Typical estimate — confirm current times with the Draper building department
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- Draper processes permits through their Online Services Portal — submit digitally for faster turnaround.
- Hillside properties in Draper may require a geotechnical report and additional engineering review.
- Schedule inspections at least 24 hours in advance.
Frequently asked questions
- How much does a residential building permit cost in Draper?
- Draper City building permit fees follow the standard UBC (Uniform Building Code) Schedule: $23.50 (up to $500 valuation), scaling to $5,608.75 + $3.65/each $1,000 over $1M. Plan review is also 100% of UBC Schedule. Reinspection fee is $85. State surcharge of 1% applies. (Resolution 25-52, Oct 2025)
- How long does permit review take in Draper?
- Draper does not publish a fixed plan-review turnaround. Across Utah jurisdictions, residential plan review typically runs about 2-4 weeks, but times vary with project scope and department workload — confirm current timelines with the Draper building department before you submit.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Draper City Building Division — official building department
- Draper City Consolidated Fee Schedule (Res. 25-52)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Draper
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.