Residential Building Permit in Draper, Utah

Required for new residential construction, additions, and structural alterations in Draper.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit100% of UBC Schedule (valuation-based): $23.50 (up to $500); $23.50 + $3.05/each $100 over $500 (to $2,000); $69.25 + $14/each $1,000 over $2,000 (to $25,000); $391.75 + $10.10/each $1,000 over $25,000 (to $50,000); $643.75 + $7/each $1,000 over $50,000 (to $100,000); $993.75 + $5.60/each $1,000 over $100,000 (to $500,000); $3,233.75 + $4.75/each $1,000 over $500,000 (to $1,000,000); $5,608.75 + $3.65/each $1,000 over $1,000,000
Plan Review100% of UBC Schedule
Reinspection Fee$85 per inspection
After-Hours Inspection$85/hour (2 hour minimum)
State Surcharge1% of permit fee

Review timeline

~1021 business days

Typical estimate — confirm current times with the Draper building department

Inspection process

  1. 1

    Foundation

    Before concrete pour — forms, rebar, anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy

Tips

Frequently asked questions

How much does a residential building permit cost in Draper?
Draper City building permit fees follow the standard UBC (Uniform Building Code) Schedule: $23.50 (up to $500 valuation), scaling to $5,608.75 + $3.65/each $1,000 over $1M. Plan review is also 100% of UBC Schedule. Reinspection fee is $85. State surcharge of 1% applies. (Resolution 25-52, Oct 2025)
How long does permit review take in Draper?
Draper does not publish a fixed plan-review turnaround. Across Utah jurisdictions, residential plan review typically runs about 2-4 weeks, but times vary with project scope and department workload — confirm current timelines with the Draper building department before you submit.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Draper

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.