Accessory Dwelling Unit (ADU) in Draper, Utah

Required for construction of a secondary dwelling unit on a residential property in Draper, including basement apartments, detached cottages, and garage conversions. Draper has a dedicated ADU Permits page under Planning and Development. Building permit fees are ICC valuation-based.

Verified 2026-07-13 · Source

When you need this permit

  • Property eligible for ADU use per Draper zoning — verify via Draper Planning Services Portal
  • Compliance with Draper ADU regulations (size, setbacks, parking, etc.)
  • Separate entrance from the primary dwelling
  • 1-hour fire separation between units if attached or internal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit — valuation-basedAssessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Draper's ADU Permit (a planning/compliance permit required under Resolution 21-47, separate from the construction building permit) has NO published flat fee in the Consolidated Fee Schedule (searched all Building Permit and Planning fee line-items — none reference ADU); construction work to create/modify an ADU (basement finish, addition, garage conversion, detached structure) is billed as the standard valuation-based Building Permit. This is the only ADU-related fee Draper publishes. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures.
100% of the ICC Schedule
Plan ReviewDraper Consolidated Fee Schedule, Resolution 26-29, item 45
65% of the building permit fee
Re-inspection FeeDraper Consolidated Fee Schedule, Resolution 26-29, item 56
$85.00 per inspection

Review timeline

Plan reviewTypical estimate — confirm current times with the Draper building department
~14–30 business days

How long did your Accessory Dwelling Unit (ADU) permit actually take in Draper?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Footings, forms, rebar — before concrete pour

  2. 2

    Framing

    Structure, fire separation, egress windows

  3. 3

    MEP Rough-In

    Mechanical, electrical, plumbing rough-ins before walls closed

  4. 4

    Insulation

    Insulation and vapor barrier before drywall

  5. 5

    Final

    All work complete, smoke/CO detectors installed, address posted, ready for occupancy

See the full Draper inspection guide — scheduling & re-inspection fees →

Tips

  • Draper has a dedicated ADU Permits page — confirm ADU eligibility and Draper-specific regulations at draperutah.gov/business-development/planning-and-development/accessory-dwelling-units-permits/ before applying.
  • As of October 1, 2021, Draper requires a separate ADU Permit (Resolution 21-47) verifying zoning/regulatory compliance — distinct from the construction Building Permit. Draper allows one Internal ADU (I-ADU, e.g. basement apartment) or one Detached ADU (D-ADU) per single-family lot, not both; the primary dwelling must be owner-occupied, and the unit must be rented for 30+ consecutive days. Owner-builder
  • Utah state law (HB 82, 2021) requires cities to allow at least internal ADUs; Draper also allows detached ADUs on lots 12,000+ sq ft (I-ADUs generally require 6,000+ sq ft and street-width compliance — verify via Draper's interactive eligibility map).
  • Basement apartments in Draper must have egress windows in every bedroom (5.7 sq ft minimum opening).
  • Draper's Consolidated Fee Schedule does not publish a separate flat fee for the ADU (compliance) permit itself — only the construction Building Permit fee (ICC valuation-based) applies; confirm with the Planning Office at (801) 576-6399 if a distinct administrative fee is assessed at intake.

Frequently asked questions

Draper requires an accessory dwelling unit (adu) permit for: Property eligible for ADU use per Draper zoning — verify via Draper Planning Services Portal; Compliance with Draper ADU regulations (size, setbacks, parking, etc.); Separate entrance from the primary dwelling; 1-hour fire separation between units if attached or internal. If your project isn't listed, confirm with Draper City Building Division at (801) 576-6399 before starting work.

Draper ADU permit fees are valuation-based at 100% of the ICC Building Valuation Schedule, plus plan review at 65% of the permit fee, per Resolution 26-29. Contact the Building Division for an estimate.

Plan review for an accessory dwelling unit (adu) permit in Draper typically runs 14–30 business days. This is an estimate, not a published figure — confirm current review times with Draper City Building Division at (801) 576-6399.

You'll need: Building Permit Application; Construction Plans; Site Plan; Geotechnical Engineering Report. See the required-documents checklist on this page for details on each.

Draper requires 5 inspection(s) for an accessory dwelling unit (adu) permit, in order: Foundation, Framing, MEP Rough-In, Insulation, Final. Schedule each through Draper City Building Division ((801) 576-6399).

Apply through Draper City Building Division at 1020 E. Pioneer Rd., Draper, UT 84020. Phone: (801) 576-6399, email: building@draperutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.draperutah.gov/business-development/building-and-renovating/.

Draper, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected by this revision and remain in force..

Most likely yes — Utah state law (HB 82) requires cities to allow internal ADUs. Draper may also allow detached ADUs depending on zoning. Check the Draper ADU Permits page or contact the Planning Office at (801) 576-6399.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.