Accessory Dwelling Unit (ADU) — Lehi, Utah · Requirements sheet
Verified 2026-06-30 · Source: https://www.lehi-ut.gov/departments/building-and-inspections/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) in Lehi, Utah
Required for construction of a secondary dwelling unit on a residential property in Lehi, including internal (apartment) and detached ADUs. Planning application fee is $25 for both types; detached ADUs also trigger a $4,253 impact fee. Building permit fee is valuation-based per the standard schedule.
Verified 2026-06-30 · Source
When you need this permit
- Property must qualify under Lehi City Development Code Title 11 — confirm zoning before applying
- ADU planning application submitted to Lehi City Planning and Zoning
- Building permit submitted to Building and Inspections after planning approval
- Separate entrance from primary dwelling
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Footings, forms, rebar — before concrete pour
- 2
Framing
Structure, fire separation, egress windows
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Insulation
Insulation and vapor barrier before drywall
- 5
Final
All work complete, smoke/CO detectors, address posted, ready for occupancy
See the full Lehi inspection guide — scheduling & re-inspection fees →
Tips
- Utah HB 82 (2021) requires most cities to allow internal ADUs — confirm with Lehi Planning and Zoning whether your property qualifies and whether a detached ADU is allowed under your zone.
- Detached ADUs trigger an impact fee of $4,253 in Lehi per the FY 2026 Fee Schedule.
- The planning application fee ($25) is modest — the larger costs are the building permit (valuation-based) and the $4,253 impact fee for detached units.
- Basement apartments require egress windows in each bedroom per the 2021 IRC.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lehi
Accessory Dwelling Unit (ADU) in other cities
Compare accessory dwelling unit (adu) fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Lehi project checklist
Describe your project once and get every permit, document, and fee it triggers in Lehi — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →