Demolition Permit in Lehi, Utah

Required for partial or complete demolition of structures in Lehi, including utility disconnection coordination and any required asbestos surveys. Permit fees are valuation-based per the Lehi City building permit fee schedule.

Verified 2026-07-01 · Source

When you need this permit

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Demolition of structures with potential asbestos or lead paint (pre-1985 construction)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit FeeAssessed on project valuation per Lehi City's building permit fee schedule, cited: Lehi City FY 2026 Fee Schedule (approved), Building Inspections section — confirmed by direct review of the full published fee schedule that no separate flat fee for demolition is published; demolition permits use the standard valuation-based building permit fee schedule. Reinspection fee: $100.
Valuation-based per Lehi City building permit fee schedule

Review timeline

Plan reviewTypical estimate — confirm current times with the Lehi building department
~3–14 business days

How long did your Demolition Permit permit actually take in Lehi?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Demolition

    Verify utility disconnects are complete and any required asbestos clearance is obtained before work begins

  2. 2

    Final / Site Clear

    Site cleared, foundation removed or capped, erosion control in place

See the full Lehi inspection guide — scheduling & re-inspection fees →

Tips

  • Utilities must be formally disconnected by the respective utility companies before demolition begins — Lehi will verify.
  • Structures built before approximately 1985 require a NESHAP asbestos inspection before a demolition permit is issued — coordinate with Utah DEQ.
  • Demolition debris must go to an approved landfill.
  • Schedule inspections at least 24 hours in advance by calling (385) 201-1035.

Frequently asked questions

Yes. Lehi requires a demolition permit for all complete and partial structural demolitions. The fee is valuation-based per the Lehi City FY 2026 Fee Schedule. Utility disconnections and any required asbestos surveys must be completed before the permit is issued.

In Lehi, the published Demolition Permit Fee is: Valuation-based per Lehi City building permit fee schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a demolition permit in Lehi typically runs 3–14 business days. This is an estimate, not a published figure — confirm current review times with Lehi City Building and Inspections at (385) 201-1035.

You'll need: Building Permit Application (Demolition); Asbestos Survey; Utility Disconnect Confirmation. See the required-documents checklist on this page for details on each.

Lehi requires 2 inspection(s) for a demolition permit, in order: Pre-Demolition, Final / Site Clear. Schedule each through Lehi City Building and Inspections ((385) 201-1035).

Apply through Lehi City Building and Inspections at 153 N 100 E, Lehi, UT 84043. Phone: (385) 201-1035, email: building@lehi-ut.gov. Office hours: Mon–Thu 8 a.m.–5 p.m. (office); phone hours Mon–Thu 7:30 a.m.–5 p.m., Fri 8 a.m.–3:30 p.m. — call (385) 201-1035 to confirm. Official information: https://www.lehi-ut.gov/departments/building-and-inspections/.

Lehi, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page still lists 'Current Codes: 2021 I Codes' — the city's page has not been updated to reflect the 2024 editions that took effect statewide on 2026-07-01.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. NOTE (verified 2026-07-16): Lehi's own Building and Inspections page lists '2020 NEC' — this is stale independent of the 7/1/2026 code cycle; the 2023 NEC has governed statewide since its own adoption (predating this fix and not caused by it).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; ICC/ANSI A117.1-2017 (Accessible and Usable Buildings and Facilities) — Lehi City Building and Inspections page; NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Lehi's own page (lehi-ut.gov/departments/building-and-inspections/) was checked live on 2026-07-16 and still reads 'Current Codes: 2021 I Codes' / '2020 NEC' — it reflects neither the 2024 code cycle nor the separately longer-standing 2023 NEC.. Local amendments apply — see the Lehi overview page for the full list.

Yes, for structures built before approximately 1985. Federal NESHAP regulations require an asbestos inspection before demolition, and Lehi enforces this as part of the permit process.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.