Demolition Permit — Farmington, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://farmingtoncity.wpengine.com/wp-content/uploads/2023/06/Demolition-Permit-Process-for-Contractor-or-Owner.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Farmington, Utah
Required for partial or complete demolition of a structure in Farmington City. Requires Historic Preservation Commission review, utility disconnection confirmation, and coordination with Utah Division of Air Quality (asbestos) and Davis County Environmental Health before the permit is finalized.
Verified 2026-07-03 · Source
When you need this permit
- Complete or partial demolition of any structure
- Contact Utah Division of Air Quality (801) 536-4000 for required asbestos inspection
- Contact Davis County Environmental Health (801) 451-3296 for pre-demolition inspection of hazardous materials (mercury thermostats/lamps, PCB ballasts, refrigerant units, hazardous waste)
- Complete a Farmington City Historic Preservation Commission Remodel/Demolition Information Form with a minimum of 10 days' notice before demolition
- Utility disconnection coordination: Blue Stakes (for locates, 811 or 532-5000), Farmington City Public Works (801-939-9282, water disconnect from main line), Questar Gas Ask-A-Tech (324-3287, gas deactivation), Utah Power/Rocky Mountain Power (1-888-221-7070)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Demolition (Historic Preservation)
Historic Preservation Commission review of the Remodel/Demolition Information Form, at least 10 days before demolition
- 2
Pre-Demolition (Hazardous Materials)
Davis County Environmental Health inspection for mercury thermostats/lamps, PCB ballasts/transformers, refrigerant units, and other hazardous materials
- 3
Final / Site Clear
Confirms utilities disconnected and site cleared per approved demolition plan
See the full Farmington inspection guide — scheduling & re-inspection fees →
Tips
- Farmington's Historic Preservation Commission requires a minimum of 10 days' notice via the Remodel/Demolition Information Form before any demolition — factor this into project scheduling.
- Federal/state asbestos rules (40 CFR 61.145(a); Utah Admin. Code R307-801-9) apply even when there is NO asbestos found — a written Notification of Demolition must still be submitted to Utah DAQ, with a 10-working-day waiting period from the postmark or hand-delivery date before demolition may proceed.
- All utilities (gas, electric, water) must be disconnected by the respective utility company before the City will finalize a demolition permit — contact Blue Stakes, Farmington Public Works, Questar Gas, and Rocky Mountain Power directly.
- Notify the Farmington Fire Department at (801) 451-2842 of any planned demolition so they have the opportunity to conduct practice routines before the structure is torn down.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Farmington
Demolition Permit in other cities
Compare demolition permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Farmington project checklist
Describe your project once and get every permit, document, and fee it triggers in Farmington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →