EV Charger / EVSE Permit in Farmington, Utah

Farmington City does not publish a separate EV-charger/EVSE permit or fee. The city's Consolidated Fee Schedule (adopted 2026-05-19), Section C ('Building Permit Application & Related Fees'), prices building-permit work via Table No. 1-A, a valuation-based schedule derived from the 1997 Uniform Building Code, with no distinct Electrical, Mechanical, or Plumbing sub-fee and no EV-specific line item found. EV charger installation is therefore handled as standard electrical work under this same valuation-based Building Permit; no EV-specific dollar figure is asserted here.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Farmington
  • Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
  • Building permit application submitted to the Farmington City Building Department

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Table No. 1-A, 1997 UBC valuation table)Farmington City Consolidated Fee Schedule (adopted 2026-05-19), Table No. 1-A 'Building Permit Fees from 1997 Uniform Building Code.' No distinct EV-charger or standalone-electrical dollar figure is published; a minimum permit fee of $55.00 applies per the schedule's Miscellaneous Residential Building Permit Fees note.
Valuation-based (e.g., $23.00 minimum for $1-$500 valuation, scaling up per Table No. 1-A)
Plan Check FeeFarmington City Consolidated Fee Schedule, Section C2.
40% of building permit fee (residential)
State Inspection FeeFarmington City Consolidated Fee Schedule, Section C3.
1% of building application fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Farmington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Field inspection of the EV charger circuit and installation, scheduled through the Farmington City Building Department, (801) 451-2383.

See the full Farmington inspection guide — scheduling & re-inspection fees →

Tips

  • Farmington has no separate EV-charger permit or fee category — the Consolidated Fee Schedule prices all building-permit work, including electrical, on the 1997 UBC-derived Table No. 1-A valuation table.
  • The schedule's minimum permit fee is $55.00 for one inspection, plus a 0.55 (1%) State fee, per the Building Permit Application & Related Fees section's own note.
  • All residential building permits, including electrical-only work like an EV charger install, are also charged a Plan Check Fee of 40% of the Building Permit Fee.

Frequently asked questions

Farmington requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Farmington; Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g)); Building permit application submitted to the Farmington City Building Department. If your project isn't listed, confirm with Farmington City Building Department at (801) 451-2383 before starting work.

No. Farmington's Consolidated Fee Schedule (adopted 2026-05-19) publishes no distinct EV-charger line item — building permit fees, including electrical work, are calculated from the 1997 UBC-derived Table No. 1-A valuation table, plus a 40% Plan Check Fee and 1% State Inspection Fee.

Farmington does not publish a plan-review timeline for this permit. Contact Farmington City Building Department at (801) 451-2383 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Farmington requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Farmington City Building Department ((801) 451-2383).

Apply through Farmington City Building Department at 160 S. Main St. / P.O. Box 160, Farmington, UT 84025-0160. Phone: (801) 451-2383. Office hours: Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 12:00 PM (Residential Building Permit Application Packet, H. Gordon rev. 4.24.2020). Official information: https://farmington.utah.gov/building-department/.

Farmington, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously used in Farmington City's design criteria (Residential Building Permit Application Packet, H. Gordon, rev. 4.24.2020, which had not been updated as of 2026-07-16); 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment. Farmington City design criteria (rev. 4.24.2020) and the Reroof & Roof Repair Policy (eff. July 1, 2024) are consistent with this; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Farmington's own published materials, added here per statute; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition cited in Farmington's Reroof & Roof Repair Policy (eff. July 1, 2024), Sections 705 and 706, which had not been updated as of 2026-07-16; 2021 International Property Maintenance Code (IPMC) — cited in Reroof & Roof Repair Policy (eff. July 1, 2024), Sections 304.1, 304.7, 507; the IPMC is NOT among the codes adopted by Utah Code § 15A-2-103 (property-maintenance code, not a construction code), so no statewide edition change applies here — left as published by the City; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously used in Farmington's design criteria (rev. 4.24.2020, not updated as of 2026-07-16); 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously used in Farmington's design criteria (rev. 4.24.2020, not updated as of 2026-07-16); 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not separately itemized in Farmington's own published design-criteria packet (rev. 4.24.2020), added here per statute since the City's own materials omit it; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously used in Farmington's design criteria (rev. 4.24.2020, not updated as of 2026-07-16); 2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment. Farmington City design criteria (rev. 4.24.2020) already correctly reflects 2023; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Farmington City's own published design-criteria packet (Residential Building Permit Application Packet, rev. 4.24.2020) and Reroof & Roof Repair Policy (eff. July 1, 2024) still reference 2021 editions for IBC/IEBC and had not been updated to reflect the 7/1/2026 transition as of this re-verification; this file now states the governing statutory code (2024 editions) as current per Utah's statewide-mandatory code regime (Utah Code § 15A-1-204), with the City's un-updated 2021 references preserved above as historical/local-document context. The Utah Code § 15A-2-103 citation in the sources array below has been updated to the current in-force version link. Local amendments apply — see the Farmington overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.