EV Charger / EVSE Permit in Farmington, Utah
Farmington City does not publish a separate EV-charger/EVSE permit or fee. The city's Consolidated Fee Schedule (adopted 2026-05-19), Section C ('Building Permit Application & Related Fees'), prices building-permit work via Table No. 1-A, a valuation-based schedule derived from the 1997 Uniform Building Code, with no distinct Electrical, Mechanical, or Plumbing sub-fee and no EV-specific line item found. EV charger installation is therefore handled as standard electrical work under this same valuation-based Building Permit; no EV-specific dollar figure is asserted here.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Farmington
- Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
- Building permit application submitted to the Farmington City Building Department
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Field inspection of the EV charger circuit and installation, scheduled through the Farmington City Building Department, (801) 451-2383.
See the full Farmington inspection guide — scheduling & re-inspection fees →
Tips
- Farmington has no separate EV-charger permit or fee category — the Consolidated Fee Schedule prices all building-permit work, including electrical, on the 1997 UBC-derived Table No. 1-A valuation table.
- The schedule's minimum permit fee is $55.00 for one inspection, plus a 0.55 (1%) State fee, per the Building Permit Application & Related Fees section's own note.
- All residential building permits, including electrical-only work like an EV charger install, are also charged a Plan Check Fee of 40% of the Building Permit Fee.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Farmington
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Farmington project checklist
Describe your project once and get every permit, document, and fee it triggers in Farmington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →