Residential Building Permit in Farmington, Utah

Required for new residential construction, additions, structural alterations, conversions, and basement finishes in Farmington City, governed by the 2024 IBC / 2021 IRC design criteria (2024 IBC current per Utah Code § 15A-2-103(1)(a) effective 7/1/2026; IRC remains 2021 per § 15A-2-103(1)(b)). All permits require two engineer-stamped plan sets and three site plan copies. Farmington's Consolidated Fee Schedule (as adopted 2026-05-19) and Residential Building Permit Application Packet list electrical work as a standard component of the valuation-based building permit (the packet's submittal checklist references 'Electrical components' as part of the general plan set); no distinct EV charger/EVSE fee line item or permit category was found as of 2026-07-19.

Verified 2026-07-03 · Source

When you need this permit

  • New single-family or multi-family residential construction
  • Additions requiring structural work
  • Conversion of non-habitable space to habitable space
  • Retaining walls over four feet in height

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 9 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Review Deposit — ResidentialFarmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C1
$75.00
Building Permit Fee (1997 UBC Table No. 1-A, valuation-based)Farmington City Consolidated Fee Schedule, adopted 2026-05-19, Table No. 1-A (1997 Uniform Building Code); minimum permit fee is $55.00 for one inspection plus 0.55 state 1% fee
$1.00–$500: $23.00. $501–$2,000: $23.50 + $3.05 per additional $100. $2,001–$25,000: $69.25 + $14.00 per additional $1,000. $25,001–$50,000: $391.75 + $10.10 per additional $1,000. $50,001–$100,000: $643.75 + $7.00 per additional $1,000. $100,001–$500,000: $993.75 + $5.60 per additional $1,000. $500,001–$1,000,000: $3,233.75 + $4.75 per additional $1,000. Over $1,000,000: $5,608.75 + $3.65 per additional $1,000.
Plan Check Fee — ResidentialFarmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C2
40% of the building permit fee ($100 flat for a duplicate/same-model card-file plan)
State Inspection FeeFarmington City Consolidated Fee Schedule, adopted 2026-05-19, Section C3
1% of building application fee
Total Permit Fees (typical, subdivision lot)Residential Building Permit Application Packet (rev. 4.24.2020): includes building fee, plan check fee, state fee, water meter/connection, sewer connection, irrigation connection if applicable, transportation, police and fire facilities fees, street cleaning; storm water application fee and refundable storm water bond processed separately through Public Works. The City does not give fee estimates in advance — fees are calculated only after full plan review.
Approximately $12,000 for an average-sized home in a subdivision
Total Permit Fees (typical, non-subdivision lot)Residential Building Permit Application Packet (rev. 4.24.2020): includes all fees above plus impact fees for water, storm sewer, and parks (non-subdivision properties are not pre-assessed these impact fees at plat recordation)
Approximately $22,000
Water Impact Fee — Single Family DwellingFarmington City Consolidated Fee Schedule, adopted 2026-05-19, Water Impact Fees table
$4,263.00 per dwelling unit
Combined Impact Fees (Storm Water, Parks & Recreation, Fire Facilities, Police Capital Facilities) — Single FamilyFarmington City Consolidated Fee Schedule, adopted 2026-05-19, Impact Fees table
$10,013.73 per dwelling unit ($1,709.87 storm water + $6,616.00 parks & recreation + $915.48 fire facilities + $772.38 police capital facilities)
Transportation Impact Fee — Single FamilyFarmington City Consolidated Fee Schedule, adopted 2026-05-19, Transportation Impact Fee table (based on $509.41 cost per average daily trip x 4.72 adjusted trip rate)
$2,404.42 per dwelling unit
Second/Additional Plan Review (after redlined resubmission without corrections, or major changes)Residential Building Permit Application Packet (rev. 4.24.2020); Consolidated Fee Schedule Table No. 1-A lists the current rate as $55.55/hour
$55.00/hour (City staff) or $100.00/hour (outside consultant)

Review timeline

Plan reviewFarmington’s published plan-review target
14–28 business days

How long did your Residential Building Permit permit actually take in Farmington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Excavation complete and forms in place, before concrete pour

  2. 2

    Foundation

    Foundation walls and rebar before backfill

  3. 3

    Underground Plumbing

    Underground plumbing lines before slab pour

  4. 4

    Water and Sewer Laterals

    Water and sewer lateral connections verified against as-built drawings

  5. 5

    Temporary Power Pedestal

    If passed, the City emails clearance to Rocky Mountain Power; owner/contractor must have an account set up with the power company before power is turned on (1-888-221-7070)

  6. 6

    4-Way (Framing/Electrical/Plumbing/Mechanical Rough-In)

    Building enclosed, structural members still exposed, rough-in for heating, plumbing, and electrical work in place and visible

  7. 7

    Gas Line

    If passed, the City sends clearance to Dominion Energy

  8. 8

    Insulation

    Insulation installed, before drywall

  9. 9

    Brick Flashing

    Masonry veneer flashing inspection where applicable

  10. 10

    Permanent Power

    If passed, the City emails clearance to Rocky Mountain Power

  11. 11

    Final

    All work complete; a final inspection is required or the permit becomes non-compliant and may result in a lien against the property

  12. 12

    Final Site/Grading

    Scheduled separately with the Storm Water/Environmental Specialist, Brent White, (801) 939-9286

See the full Farmington inspection guide — scheduling & re-inspection fees →

Tips

  • Farmington City does NOT give fee estimates on permits — fees are calculated only after a full plan review is completed (Residential Building Permit Application Packet, rev. 4.24.2020).
  • Inspections require a minimum 24-hour notice via the Inspection Hotline (801) 882-8954 (hours 8:00 AM–4:00 PM Mon–Fri); the City does NOT do same-day inspections and typically books 1-2 working days out.
  • Permits become null and void if authorized work has ceased, been suspended, or gone without inspection for 180 days; the Building Official may grant written extensions of up to 180 days each for justifiable cause.
  • If the City cannot provide an inspection within 3 business days, state law (UCA 10-6-160) allows use of third-party inspectors: Syracuse Building Department (801) 825-1477 ext. 4, Kaysville Building Department (801) 544-1363, or West Haven Building Department (385) 389-2690.
  • Architectural approval is required in addition to the building permit for homes in the Farmington Ranches and Farmington Meadows subdivisions.
  • Farmington City is in Seismic Design Category D2 with 30 lb. ground snow load (40 lb. in foothill zones) and V-ult ASCE-7 Exposure B for most of the city — an engineer must evaluate site-specific exposure.
  • No distinct EV charger/EVSE fee line item was found in Farmington's Consolidated Fee Schedule (farmington.utah.gov, as adopted 2026-05-19, checked 2026-07-19) — electrical work, including a home charger circuit, is priced under the same valuation-based building permit fee.

Frequently asked questions

Farmington requires a residential building permit for: New single-family or multi-family residential construction; Additions requiring structural work; Conversion of non-habitable space to habitable space; Retaining walls over four feet in height. If your project isn't listed, confirm with Farmington City Building Department at (801) 451-2383 before starting work.

Farmington City does not provide fee estimates. The base building permit fee follows the 1997 Uniform Building Code Table No. 1-A (e.g., $69.25 + $14.00 per additional $1,000 for valuations $2,001–$25,000), plus a 40% residential plan check fee, 1% state inspection fee, and impact fees (water $4,263/unit, plus storm water/parks/fire/police impact fees totaling $10,013.73/unit for single family, plus a $2,404.42 transportation impact fee). The City states that permit fees for an average subdivision home run approximately $12,000 total; for a non-subdivision lot, approximately $22,000 (Residential Building Permit Application Packet, rev. 4.24.2020; Consolidated Fee Schedule, adopted 2026-05-19).

Farmington City's own application packet states the plan check process takes approximately 3 to 4 weeks. Multiple review cycles may be needed if redlined corrections are not fully addressed, which can extend the timeline further, and a second review fee ($55/hour City staff or $100/hour outside consultant) applies if plans are resubmitted without required changes.

You'll need: Building Permit Application; Two Complete Plan Sets, Engineer-Stamped; Three Copies of Site Plan; REScheck Compliance Certificates (2 copies); Structural Calculations from an Engineer (2 copies); Heating Plan & Calculations Manual D & J (2 copies); Natural Gas Piping Compliance Form (2 copies); Excavation Permit (Public Works); $75 Plan Check Deposit. Depending on your project, Farmington may also ask for: Soils/Geotech Report. See the required-documents checklist on this page for details on each.

Farmington requires 12 inspection(s) for a residential building permit, in order: Footings, Foundation, Underground Plumbing, Water and Sewer Laterals, Temporary Power Pedestal, 4-Way (Framing/Electrical/Plumbing/Mechanical Rough-In), Gas Line, Insulation, Brick Flashing, Permanent Power, Final, Final Site/Grading. Schedule each through Farmington City Building Department ((801) 451-2383).

Apply through Farmington City Building Department at 160 S. Main St. / P.O. Box 160, Farmington, UT 84025-0160. Phone: (801) 451-2383. Office hours: Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 12:00 PM (Residential Building Permit Application Packet, H. Gordon rev. 4.24.2020). Official information: https://farmington.utah.gov/building-department/.

Farmington, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously used in Farmington City's design criteria (Residential Building Permit Application Packet, H. Gordon, rev. 4.24.2020, which had not been updated as of 2026-07-16); 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment. Farmington City design criteria (rev. 4.24.2020) and the Reroof & Roof Repair Policy (eff. July 1, 2024) are consistent with this; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Farmington's own published materials, added here per statute; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition cited in Farmington's Reroof & Roof Repair Policy (eff. July 1, 2024), Sections 705 and 706, which had not been updated as of 2026-07-16; 2021 International Property Maintenance Code (IPMC) — cited in Reroof & Roof Repair Policy (eff. July 1, 2024), Sections 304.1, 304.7, 507; the IPMC is NOT among the codes adopted by Utah Code § 15A-2-103 (property-maintenance code, not a construction code), so no statewide edition change applies here — left as published by the City; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously used in Farmington's design criteria (rev. 4.24.2020, not updated as of 2026-07-16); 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously used in Farmington's design criteria (rev. 4.24.2020, not updated as of 2026-07-16); 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not separately itemized in Farmington's own published design-criteria packet (rev. 4.24.2020), added here per statute since the City's own materials omit it; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously used in Farmington's design criteria (rev. 4.24.2020, not updated as of 2026-07-16); 2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment. Farmington City design criteria (rev. 4.24.2020) already correctly reflects 2023; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Farmington City's own published design-criteria packet (Residential Building Permit Application Packet, rev. 4.24.2020) and Reroof & Roof Repair Policy (eff. July 1, 2024) still reference 2021 editions for IBC/IEBC and had not been updated to reflect the 7/1/2026 transition as of this re-verification; this file now states the governing statutory code (2024 editions) as current per Utah's statewide-mandatory code regime (Utah Code § 15A-1-204), with the City's un-updated 2021 references preserved above as historical/local-document context. The Utah Code § 15A-2-103 citation in the sources array below has been updated to the current in-force version link. Local amendments apply — see the Farmington overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.