Residential Building Permit — Farmington, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://farmington.utah.gov/wp-content/uploads/2025/08/Residential-Building-Permit-Application-Packet-2.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Farmington, Utah
Required for new residential construction, additions, structural alterations, conversions, and basement finishes in Farmington City, governed by the 2024 IBC / 2021 IRC design criteria (2024 IBC current per Utah Code § 15A-2-103(1)(a) effective 7/1/2026; IRC remains 2021 per § 15A-2-103(1)(b)). All permits require two engineer-stamped plan sets and three site plan copies. Farmington's Consolidated Fee Schedule (as adopted 2026-05-19) and Residential Building Permit Application Packet list electrical work as a standard component of the valuation-based building permit (the packet's submittal checklist references 'Electrical components' as part of the general plan set); no distinct EV charger/EVSE fee line item or permit category was found as of 2026-07-19.
Verified 2026-07-03 · Source
When you need this permit
- New single-family or multi-family residential construction
- Additions requiring structural work
- Conversion of non-habitable space to habitable space
- Retaining walls over four feet in height
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 9 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footings
Excavation complete and forms in place, before concrete pour
- 2
Foundation
Foundation walls and rebar before backfill
- 3
Underground Plumbing
Underground plumbing lines before slab pour
- 4
Water and Sewer Laterals
Water and sewer lateral connections verified against as-built drawings
- 5
Temporary Power Pedestal
If passed, the City emails clearance to Rocky Mountain Power; owner/contractor must have an account set up with the power company before power is turned on (1-888-221-7070)
- 6
4-Way (Framing/Electrical/Plumbing/Mechanical Rough-In)
Building enclosed, structural members still exposed, rough-in for heating, plumbing, and electrical work in place and visible
- 7
Gas Line
If passed, the City sends clearance to Dominion Energy
- 8
Insulation
Insulation installed, before drywall
- 9
Brick Flashing
Masonry veneer flashing inspection where applicable
- 10
Permanent Power
If passed, the City emails clearance to Rocky Mountain Power
- 11
Final
All work complete; a final inspection is required or the permit becomes non-compliant and may result in a lien against the property
- 12
Final Site/Grading
Scheduled separately with the Storm Water/Environmental Specialist, Brent White, (801) 939-9286
See the full Farmington inspection guide — scheduling & re-inspection fees →
Tips
- Farmington City does NOT give fee estimates on permits — fees are calculated only after a full plan review is completed (Residential Building Permit Application Packet, rev. 4.24.2020).
- Inspections require a minimum 24-hour notice via the Inspection Hotline (801) 882-8954 (hours 8:00 AM–4:00 PM Mon–Fri); the City does NOT do same-day inspections and typically books 1-2 working days out.
- Permits become null and void if authorized work has ceased, been suspended, or gone without inspection for 180 days; the Building Official may grant written extensions of up to 180 days each for justifiable cause.
- If the City cannot provide an inspection within 3 business days, state law (UCA 10-6-160) allows use of third-party inspectors: Syracuse Building Department (801) 825-1477 ext. 4, Kaysville Building Department (801) 544-1363, or West Haven Building Department (385) 389-2690.
- Architectural approval is required in addition to the building permit for homes in the Farmington Ranches and Farmington Meadows subdivisions.
- Farmington City is in Seismic Design Category D2 with 30 lb. ground snow load (40 lb. in foothill zones) and V-ult ASCE-7 Exposure B for most of the city — an engineer must evaluate site-specific exposure.
- No distinct EV charger/EVSE fee line item was found in Farmington's Consolidated Fee Schedule (farmington.utah.gov, as adopted 2026-05-19, checked 2026-07-19) — electrical work, including a home charger circuit, is priced under the same valuation-based building permit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Farmington
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →