Solar Panel (PV) Permit in Farmington, Utah
Required for residential and commercial rooftop solar photovoltaic installations in Farmington City. Farmington's Building Applications and Forms page lists dedicated solar documents (Solar Building Permit Application, Solar Checklist, Commercial Solar, Residential Solar Micro Inverters, Residential Solar String or Central Inverters) separate from its general permit packets, and the Consolidated Fee Schedule carries a distinct 'Solar (Flat Rate)' line item of $378.01 — a genuinely distinct solar-specific fee and technical plan-review checklist, not folded into a generic building-permit valuation.
Verified 2026-07-19 · Source
When you need this permit
- Two complete sets of construction drawings, one-line electrical diagram(s), and a detailed site plan showing the home's service panelboard, any backfed sub-panelboard, disconnect locations, and PV module layout
- Two complete sets of manufacturer specification sheets for micro-inverters/inverters, modules (panels), disconnect switches, any new AC panelboards, and the racking/mounting system
- Module spec sheets showing STC-rated watts (Pmp), volts (Vmp), amps (Imp), open-circuit voltage (Voc), and short-circuit current (Isc); modules must be listed UL 1703
- Inverter spec sheets showing max watts/volts handled and max rated AC output amps/voltage; utility-tied inverters must be listed 'utility interactive' meeting UL 1741 with ground-fault protection
- Roof mounting-system detail including component weight, support spacing rated for local wind/snow loads, and roof rafter/truss type
- Correct checklist used for system type: separate Farmington City checklists exist for micro-inverter systems versus string/central-inverter systems, and a separate checklist for commercial PV systems 600V or less
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Verification of conduit, wire sizing, grounding/bonding, and disconnect placement per the submitted one-line diagram before the system is energized.
- 2
Final Inspection
Confirms racking/mounting attachment, roof-penetration sealing, module and inverter installation match approved plans, and required labeling is in place.
See the full Farmington inspection guide — scheduling & re-inspection fees →
Tips
- Use the checklist matching your exact system type (micro-inverter vs. string/central-inverter for residential; the separate 600V-or-less checklist for commercial) — Farmington's checklists note requirements differ by inverter topology (e.g., 'Total array power' items are explicitly waived for micro-inverter systems).
- As of 2026-07-19 two of these direct PDF links on farmingtoncity.wpengine.com (the Solar Checklist and the Solar Building Permit Application) return 404 even though Farmington's live Building Applications and Forms page still names and links them — a case of partial link rot on the city's own site. The Residential Solar Micro Inverters checklist link is still live. Content for the two dead links was confirmed via Wayback Machine archives (captured 2025-06-05) of the same file paths; call the Building Department (801-939-9214) to get current copies if any of the live links are broken by the time you check.
- The $378.01 Solar (Flat Rate) fee appears in the 'Miscellaneous Residential Building Permit Fees' table alongside items like swimming pools and storage sheds — it is a flat add-on, and the schedule's two-column PDF table can mis-align in plain-text extraction, so verify the dollar figure against the actual table image if re-checking.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Farmington
Solar Panel (PV) Permit in other cities
Compare solar panel (pv) permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Farmington project checklist
Describe your project once and get every permit, document, and fee it triggers in Farmington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →