Farmington building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Farmington, Utah.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
160 S. Main St. / P.O. Box 160, Farmington, UT 84025-0160
Phone
(801) 451-2383
Office hours
Monday–Thursday 8:00 AM – 5:00 PM; Friday 8:00 AM – 12:00 PM (Residential Building Permit Application Packet, H. Gordon rev. 4.24.2020)

Published scheduling rules

  • Many everyday signs are fully exempt from Title 15 and do not need a sign permit: public-agency/legal-notice signs, tombstones and historical plaques, small religious symbols (≤4 sq ft), signs more than 25 feet from a public street or not intended to be viewed from one, indoor non-animated signs, vehicle logos on licensed commercial vehicles (not used as parked static displays), art without an advertising message, gas pump/vending machine/drive-in menu signage, and short-term event signs like garage-sale or lost-and-found notices (max 4 per event, up ≤24 hours before and removed immediately after) — City Code § 15-2-100. (Sign Permit)

Inspection sequence

Applies to: Residential Building Permit

  1. 1

    Footings

    Excavation complete and forms in place, before concrete pour

  2. 2

    Foundation

    Foundation walls and rebar before backfill

  3. 3

    Underground Plumbing

    Underground plumbing lines before slab pour

  4. 4

    Water and Sewer Laterals

    Water and sewer lateral connections verified against as-built drawings

  5. 5

    Temporary Power Pedestal

    If passed, the City emails clearance to Rocky Mountain Power; owner/contractor must have an account set up with the power company before power is turned on (1-888-221-7070)

  6. 6

    4-Way (Framing/Electrical/Plumbing/Mechanical Rough-In)

    Building enclosed, structural members still exposed, rough-in for heating, plumbing, and electrical work in place and visible

  7. 7

    Gas Line

    If passed, the City sends clearance to Dominion Energy

  8. 8

    Insulation

    Insulation installed, before drywall

  9. 9

    Brick Flashing

    Masonry veneer flashing inspection where applicable

  10. 10

    Permanent Power

    If passed, the City emails clearance to Rocky Mountain Power

  11. 11

    Final

    All work complete; a final inspection is required or the permit becomes non-compliant and may result in a lien against the property

  12. 12

    Final Site/Grading

    Scheduled separately with the Storm Water/Environmental Specialist, Brent White, (801) 939-9286

Applies to: Commercial Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts, per 2024 IBC.

  2. 2

    Underground Plumbing

    Underground plumbing lines before slab pour.

  3. 3

    4-Way (Framing/Electrical/Plumbing/Mechanical Rough-In)

    Building enclosed, structural members still exposed, rough-in for heating, plumbing, and electrical work in place and visible.

  4. 4

    Fire / Life Safety

    Fire sprinkler/alarm systems inspected where required by the adopted IBC/IFC.

  5. 5

    Final

    All work complete; a final inspection is required or the permit becomes non-compliant.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Structural (if applicable)

    Interior wall framing and structural connections verified before close-in, where the scope includes structural work.

  2. 2

    MEP Rough-In

    Electrical, plumbing, and mechanical rough-in for the tenant space, inspected before walls closed.

  3. 3

    Fire / Life Safety (if applicable)

    Fire sprinkler/alarm modifications inspected where required by the adopted IBC/IFC.

  4. 4

    Final

    All tenant-finish or remodel work complete before occupancy.

Applies to: Demolition Permit

  1. 1

    Pre-Demolition (Historic Preservation)

    Historic Preservation Commission review of the Remodel/Demolition Information Form, at least 10 days before demolition

  2. 2

    Pre-Demolition (Hazardous Materials)

    Davis County Environmental Health inspection for mercury thermostats/lamps, PCB ballasts/transformers, refrigerant units, and other hazardous materials

  3. 3

    Final / Site Clear

    Confirms utilities disconnected and site cleared per approved demolition plan

Applies to: Fire Sprinkler System Permit

  1. 1

    Flow

    Flow test of the sprinkler system, included in the base permit fee.

  2. 2

    Hydro

    Hydrostatic pressure test, included in the base permit fee.

  3. 3

    Final

    Final inspection and acceptance of the completed system, included in the base permit fee (3 inspections total included).

Applies to: Roofing Permit (Reroof / Roof Recover)

  1. 1

    Sheathing

    For a recover, the existing roof is inspected; ensures the roof surface is smooth with proper fastening and spacing of solid sheathing, and crickets installed if needed

  2. 2

    Ice Barrier

    Proper placement of ice barrier per 2021 IRC R905.1.2/R905.2.8.5

  3. 3

    Final

    Confirms roof was installed properly with all required vents, flashings, and drip edges

Applies to: Certificate of Occupancy (Change of Use / Occupancy)

  1. 1

    Zoning Compliance Review

    Review by the Zoning Administrator confirming the contemplated use of the land/building complies with Title 11 (Zoning), per City Code section 11-4-050.C.2.

  2. 2

    Building Official Sign-Off

    Building Official confirms the building complies with applicable building codes before the joint Certificate of Occupancy is issued, per City Code section 11-4-050.C.1.

Applies to: Solar Panel (PV) Permit

  1. 1

    Rough Electrical

    Verification of conduit, wire sizing, grounding/bonding, and disconnect placement per the submitted one-line diagram before the system is energized.

  2. 2

    Final Inspection

    Confirms racking/mounting attachment, roof-penetration sealing, module and inverter installation match approved plans, and required labeling is in place.

Final inspection only: EV Charger / EVSE Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Farmington building permits

Get alerts for Farmington

We'll email you when Farmington's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.