Solar PV / Solar Energy System Permit in Alpine, Utah

Alpine City does not publish a distinct "Solar," "Solar PV," "Photovoltaic," or "Renewable Energy" permit application or fee line item — a full-text review of the Consolidated Fee Schedule (effective 11/11/2025) found no mention of any of those terms. A rooftop or ground-mount solar installation is instead filed under Alpine's general "Building Permit — Remodel, Addition, Accessory Structures, etc." application (checking the "Other" box under Intended Use, since Solar/PV is not one of the form's five listed checkboxes: Accessory Building, Remodel, Addition, Swimming Pool, Other), and is priced using the same general Building Permit Application fee tiers and valuation-based Building Permit Fee table used for any other remodel/addition project — not a dedicated solar fee.

Verified 2026-07-21 · Source

When you need this permit

  • Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property within Alpine City requires a building permit — per Alpine's official Building Department page, all structures/installations, regardless of size, require a building permit
  • Filed using Alpine's general Building Permit Application (Remodel, Addition, Accessory Structures, etc.), checking "Other" under Intended Use, since no solar-specific application form or checkbox is published
  • Compliance with the adopted 2023 National Electrical Code (NEC) for the electrical interconnection, and the applicable adopted building code editions for any structural roof-mounting or racking components
  • Contractor license number for the electrical trade (or notarized Owner/Builder Certification per Department of Commerce requirement), consistent with Alpine's other building permit applications Owner-builderContractor
  • Project Estimated Value must be declared on the application — this value drives which Building Permit Application fee tier applies and is the basis for the Appendix B valuation-based Building Permit Fee, since Alpine's Appendix A Square Foot Construction Costs table has no dedicated solar/PV valuation category

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Application Fee — 'Fee for all other Building Permit Applications'Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.c: 'Fee for all other Building Permit Applications — $25.' Applies if the solar installation's declared project value does not exceed $50,000. No distinct solar/PV fee tier is published.
$25
Building Permit Application Fee — 'Construction jobs exceeding a value of $50,000'Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.b: 'Construction jobs exceeding a value of $50,000 — $250.' Applies if the solar installation's declared project value exceeds $50,000.
$250
Building Permit Fee — valuation-based (2021 IRC Appendix AL, as amended)
Alpine City Consolidated Fee Schedule, Section I.B.2: 'Building Permit Fees will be based on the construction values in Appendix A and in accordance with-Appendix B,' applied via Appendix B's… Show full citationAlpine City Consolidated Fee Schedule, Section I.B.2: 'Building Permit Fees will be based on the construction values in Appendix A and in accordance with-Appendix B,' applied via Appendix B's graduated table (2021 IRC Appendix AL, as amended). Appendix A's 'Square Foot Construction Costs' table has no solar/PV-specific occupancy line item, so the applicant's declared 'Project Estimated Value' on the Remodel/Addition/Accessory Structures application is the basis for this fee, consistent with how Appendix A's own footnote (b) treats other non-square-footage items (e.g., finished basements/decks fall under '(U) Utility, miscellaneous' per Section I.B.2).
$1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction.
One Percent State SurchargeAlpine City Consolidated Fee Schedule, Section I.B.4: 'One percent surcharge per building permit (Utah Code): 80 percent submitted to Utah State Government, 20 percent retained by City for administration of State collection.'
1% of the building permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Solar PV / Solar Energy System Permit permit actually take in Alpine?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Inspection of the PV system's electrical interconnection (wiring, disconnect, inverter, panel/meter tie-in), scheduled via the Building Inspection Line at (801) 756-0208.

  2. 2

    Final Inspection

    Final inspection confirming the completed installation before the system is approved for use, per Alpine's standard building-permit inspection practice.

See the full Alpine inspection guide — scheduling & re-inspection fees →

Tips

  • There is no dedicated "Solar" or "PV" permit type, application form, or fee line item in Alpine City — a full-text review of the Consolidated Fee Schedule (effective 11/11/2025) found zero mentions of "solar," "photovoltaic," "PV," or "renewable energy."
  • File the general Building Permit Application (Remodel, Addition, Accessory Structures, etc.) and check "Other" under Intended Use, since Solar/PV is not one of the form's listed checkboxes (Accessory Building, Remodel, Addition, Swimming Pool, Other).
  • The Project Estimated Value you declare on the application determines both the flat application-fee tier ($25 if $50,000 or under, $250 if over) and, via Appendix B's graduated table, the valuation-based Building Permit Fee — there is no separate solar-specific valuation table.
  • Confirm directly with the Alpine City Building Department (801-756-6347) before applying, since no solar-specific guidance, checklist, or expedited/online permitting platform (e.g., SolarAPP+) is published on alpineut.gov as of the last verification.
  • The same finding is documented in the residential-building-permit entry, which reaches it from the Consolidated Fee Schedule and the Remodel/Addition/Accessory Structures application.

Frequently asked questions

Alpine requires a solar pv / solar energy system permit for: Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property within Alpine City requires a building permit — per Alpine's official Building Department page, all structures/installations, regardless of size, require a building permit; Filed using Alpine's general Building Permit Application (Remodel, Addition, Accessory Structures, etc.), checking "Other" under Intended Use, since no solar-specific application form or checkbox is published; Compliance with the adopted 2023 National Electrical Code (NEC) for the electrical interconnection, and the applicable adopted building code editions for any structural roof-mounting or racking components; Contractor license number for the electrical trade (or notarized Owner/Builder Certification per Department of Commerce requirement), consistent with Alpine's other building permit applications; Project Estimated Value must be declared on the application — this value drives which Building Permit Application fee tier applies and is the basis for the Appendix B valuation-based Building Permit Fee, since Alpine's Appendix A Square Foot Construction Costs table has no dedicated solar/PV valuation category. If your project isn't listed, confirm with Alpine City Building Department at (801) 756-6347 before starting work.

Per Alpine City's Consolidated Fee Schedule (effective November 11, 2025), a solar installation pays the general Building Permit Application fee — $25 if the declared project value is $50,000 or under, or $250 if it exceeds $50,000 — plus a valuation-based Building Permit Fee computed from the declared project value under Appendix B, plus a 1% state surcharge. No solar-specific fee exists.

Alpine does not publish a plan-review timeline for this permit. Contact Alpine City Building Department at (801) 756-6347 for current turnaround.

You'll need: Building Permit Application (Remodel, Addition, Accessory Structures, etc.); Installation/Electrical Plans. See the required-documents checklist on this page for details on each.

Alpine requires 2 inspection(s) for a solar pv / solar energy system permit, in order: Electrical Inspection, Final Inspection. Schedule each through Alpine City Building Department ((801) 756-6347).

Apply through Alpine City Building Department at 20 North Main, Alpine, UT 84004. Phone: (801) 756-6347, email: mfox@alpineUT.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.alpineut.gov/157/Building-Department.

Alpine, Utah has adopted: 2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; per Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025): 'Structural design criteria must conform to the 2021 IRC.'; 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025) still cited as of live-check 2026-07-16: 'I understand that it is my responsibility to comply with Alpine City Zoning Ordinances and the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City.'; 2021 IRC Appendix AL (Building Permit Fees) as amended by Alpine City — Alpine's Consolidated Fee Schedule (effective November 11, 2025), Appendix B, is expressly titled 'Building Permit Fees (2021 IRC Appendix AL, as amended)' and cites https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees. This is a local fee-table appendix reference, not the § 15A-2-103 construction-code edition, and is unaffected by the 7/1/2026 code-cycle update.; Utah statewide baseline construction code editions per Utah Code § 15A-2-103, effective 7/1/2026 (superseded 1/1/2027): 2024 IPC (§(1)(d)), 2024 IMC (§(1)(e)), 2024 IFGC (§(1)(f)), 2024 IECC as a single unsplit statewide edition (§(1)(h)), 2024 IEBC (§(1)(i)), and the residential provisions of the 2024 ISPSC (§(1)(n)) — none separately itemized in Alpine's own published materials (Consolidated Fee Schedule, Building Permit Instructions, Building Department page); added here per statute since Alpine's own documents omit them. The 2023 NEC (§(1)(g)) also applies statewide but is likewise not separately restated by Alpine — unchanged by the 7/1/2026 amendment.; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Alpine City's official Building Permit Instructions (New Home Form #2) — the sole cited source for Alpine's code editions — was live-checked 2026-07-16 by re-fetching the PDF directly and remains dated 'Revised 4/9/2025' with no update: it still states 'Structural design criteria must conform to the 2021 IRC' (correct, unchanged) and 'the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City' (STALE — Alpine has not published an updated form reflecting the 2024 IBC as of this date). No newer Alpine-specific building-code publication was found on alpineut.gov. The Utah Code § 15A-2-103 citation added to the sources array below points to the current in-force version link.. Local amendments apply — see the Alpine overview page for the full list.

No. Alpine City does not publish a separate solar/PV permit application or fee line item. Solar installations are filed under the general Building Permit Application (Remodel, Addition, Accessory Structures, etc.), checking "Other" under Intended Use.

Alpine's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Alpine yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Alpine lands. Privacy.