Skip to main content
PermitBase

Demolition Permit in Kaysville, Utah

Required to demolish all or part of a structure in Kaysville. Includes a Historic Preservation Commission review window, mandatory utility disconnects, and an asbestos removal report requirement. Kaysville publishes a dedicated Demolition Checklist.

Reviewed 2026-07-23 · Source

When you need this permit

  • Complete or partial demolition of any structure
  • Utility disconnects (natural gas, secondary water, power, water) completed PRIOR to demolition
  • Asbestos Removal Report from a State-approved asbestos removal company
  • Demolition notification permit from the Utah Division of Air Quality (DAQ)
  • Historic Preservation Society approval/documentation window for applicable structures

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Performance Deposit — Demolition
Neither the Building Permits page (kaysville.gov/182/Building-Permits) nor the Demo Checklist (kaysville.gov/DocumentCenter/View/5224/Demo-Checklist) currently contains the previously-quoted 'Two… Show full citationNeither the Building Permits page (kaysville.gov/182/Building-Permits) nor the Demo Checklist (kaysville.gov/DocumentCenter/View/5224/Demo-Checklist) currently contains the previously-quoted 'Two Hundred Dollars ($200.00) for each demolition of a structure or manufactured home set in a manufactured home park' text — that quote is no longer groundable on the cited page. The live Consolidated Fee Schedule (kaysville.municipalcodeonline.com/book?type=fees, current edition eff. 7/1/2026) and the FY2021 Consolidated Fee Schedule PDF (kaysville.gov/DocumentCenter/View/3057/Consolidated-Fee-FY-21-PDF) both contain only a 'Manufactured Homes Guaranty Bonds — $200.00 (refundable upon final occupancy permit)' line, which is a bond for placing a NEW manufactured home (refunded at occupancy), not a demolition deposit — it does not support the demolition-specific $200 claim either. The Demo Checklist does confirm a 'performance deposit' and 'Bond Release' inspection step exist for demolition, so SOME deposit is real, but its dollar amount is not currently grounded in any live or archived Kaysville source. Call the Building Department at (801) 544-1363 to confirm the current demolition deposit amount before relying on the $200 figure.
$200 (UNCONFIRMED as of 2026-07-23 — see note)
Demolition Permit FeeKaysville's published fee page does not list a discrete demolition permit fee line item distinct from the $200 performance deposit; call (801) 544-1363 to confirm any additional permit fee.
Not separately published as a flat fee on kaysville.gov/749/Building-Permit-Fees or the Demo Checklist

Review timeline

Plan reviewKaysville’s published plan-review target
10–30 business days

How long did your Demolition Permit permit actually take in Kaysville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Power Meter Disconnect

    Kaysville City Power meter disconnect, scheduled after permit is paid

  2. 2

    Water Meter Disconnect

    Kaysville City Water meter disconnect, scheduled after permit is paid

  3. 3

    Sewer Cap

    Sewer line capped per code

  4. 4

    Final

    Site cleared, backfilled if foundation/basement removed, erosion/water-accumulation control in place

  5. 5

    Bond Release

    Performance deposit ($200) released after passing Final inspection

See the full Kaysville inspection guide — scheduling & re-inspection fees →

Tips

  • Allow 10 business days for standard demolition permit review; for single-family dwellings, the Historic Preservation Society review can take up to 30 days. Power and water meter disconnect work orders can take 3-5 business days. (Demo Checklist, kaysville.gov/DocumentCenter/View/5224/Demo-Checklist)
  • ALL utilities (natural gas via Dominion Energy at 801-324-5111, secondary water if applicable, Kaysville City Power, Kaysville City Water) must be shut off/disconnected PRIOR to demolition work beginning.
  • An Asbestos Removal Report from a State-approved company is required, along with a demolition notification permit from the Utah Division of Air Quality (801-536-4000).
  • If the foundation or basement is not removed, the property owner is responsible for securing the site (fence or other approved method); if removed, backfill is required.
  • A performance deposit (amount unconfirmed as of 2026-07-23 — see fees section) is forfeited to the City's General Fund if work is not commenced within 180 days or is suspended/abandoned for 180 days.

Frequently asked questions

Kaysville requires a demolition permit for: Complete or partial demolition of any structure; Utility disconnects (natural gas, secondary water, power, water) completed PRIOR to demolition; Asbestos Removal Report from a State-approved asbestos removal company; Demolition notification permit from the Utah Division of Air Quality (DAQ); Historic Preservation Society approval/documentation window for applicable structures. If your project isn't listed, confirm with Kaysville City Building Department at (801) 544-1363 before starting work.

A performance deposit applies per structure demolished (refundable upon passing final inspection) — Kaysville's Demolition Checklist confirms a deposit and Bond Release step exist, but as of 2026-07-23 the $200 amount previously cited could not be re-confirmed on kaysville.gov's current Building Permits page, Demo Checklist, or Consolidated Fee Schedule. Call (801) 544-1363 to confirm the current deposit amount and any additional charges.

Kaysville's published Demolition Checklist states to allow 10 business days for standard review. For single-family dwellings, Historic Preservation Society review can take up to 30 days. Utility meter disconnect work orders (power/water) can take an additional 3-5 business days. (kaysville.gov/DocumentCenter/View/5224/Demo-Checklist)

You'll need: Demolition Application (Cityinspect); Demolition Site Plan; Asbestos Removal Report; Utah DAQ Demolition Notification Permit; Photos of Structure Being Demolished. See the required-documents checklist on this page for details on each.

Kaysville requires 5 inspection(s) for a demolition permit, in order: Power Meter Disconnect, Water Meter Disconnect, Sewer Cap, Final, Bond Release. Schedule each through Kaysville City Building Department ((801) 544-1363).

Apply through Kaysville City Building Department at 23 E Center Street, Kaysville, UT 84037. Phone: (801) 544-1363, email: mailbox@kaysville.gov. Office hours: Mon–Thu 8:30 AM – 5:00 PM; Fri 8:30 AM – 1:00 PM (inspections available through 12:30 PM Fridays). Official information: https://www.kaysville.gov/182/Building-Permits.

Kaysville, Utah has adopted: 2021 International Residential Code (IRC) — one- & two-family dwellings and townhomes; REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria (kaysville.gov/750/Design-Criteria); Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Kaysville's own Design Criteria page, added here per statute; 2024 International Building Code (IBC), including Appendices C and J — commercial construction; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Mechanical Code (IMC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Plumbing Code (IPC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Fuel Gas Code (IFGC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2021 International Fire Code (IFC) — commercial; Kaysville Design Criteria. NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (which governs Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the City, no statutory edition change applies via § 15A-2-103; 2023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria already correctly reflects 2023; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Kaysville's own Design Criteria page or elsewhere on kaysville.gov, added here per statute since the City's own materials omit it; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026, supersedes the 2021 edition (the edition previously referenced for residential pools); NOTE: Under the Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027), IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Kaysville's Design Criteria page (kaysville.gov/750/Design-Criteria) is ALREADY CORRECT — it states verbatim 'The 2021 IRC as adopted by the State of Utah Title 15A' for residential, and 'The 2024 IBC, IMC, IFC, IPC, IFGC, IECC, Etc, and the 2023 NEC as adopted by the State of Utah' for commercial (Kaysville does not separately itemize IEBC or ISPSC on this page). The Utah Code § 15A-2-103 citation in the sources below points to the current in-force version.. Local amendments apply — see the Kaysville overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kaysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Kaysville's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Kaysville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Kaysville lands. Privacy.