EV Charger / EVSE Permit in Kaysville, Utah

Kaysville does not publish a distinct EV charger/EVSE fee line item. EV charger/EVSE installation is electrical work and is billed and processed as an Electrical Service Upgrade under Kaysville's general Electrical Permit — the city's own Building Permit Fees page has no separate EV-specific fee or checklist.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger
  • Coordination with Kaysville City Power (the city's own municipal electric utility) on panel/service capacity

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Service Upgrade Permit (covers EV charger installation)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees). No distinct EV charger/EVSE line exists; a home EV charger install is processed as an Electrical Service Upgrade under this same fee.
$195 plus any impact fee difference (e.g., amperage increase)
Power Extension Fee (400-amp upgrade example)Kaysville City Building Permit Fees page — Kaysville City Power extension fee cited for a 400-amp upgrade scenario, applicable if the EV charger requires a service upgrade.
$535.60
Power Impact FeeKaysville City Building Permit Fees page.
$954–$1,908 (varies by amperage)

Review timeline

Plan reviewTypical estimate — confirm current times with the Kaysville building department
~1–7 business days

How long did your EV Charger / EVSE Permit permit actually take in Kaysville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors, if the charger requires a service upgrade

  3. 3

    Power Meter

    Kaysville City Power meter set/connection, scheduled after permit is paid

  4. 4

    Final

    Charger connection, GFCI/breaker protection, and panel labeling verified complete

See the full Kaysville inspection guide — scheduling & re-inspection fees →

Tips

  • A home EV charger (Level 2 / 240V) install is processed as an Electrical Service Upgrade in Kaysville — coordinate with Kaysville City Power on panel/service capacity; the city has not published a separate EV-charger fee or checklist.
  • Kaysville operates its own municipal electric utility (Kaysville City Power) — you connect to Kaysville City Power, not Rocky Mountain Power.

Frequently asked questions

Kaysville requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger; Coordination with Kaysville City Power (the city's own municipal electric utility) on panel/service capacity. If your project isn't listed, confirm with Kaysville City Building Department at (801) 544-1363 before starting work.

No. Kaysville bills EV charger/EVSE installation as an Electrical Service Upgrade under its general Electrical Permit — $195 plus any difference in the power impact fee if amperage increases (impact fees range $954–$1,908 by amperage tier). The city has not published a distinct EV-charger fee or checklist.

Plan review for an ev charger / evse permit in Kaysville typically runs 1–7 business days. This is an estimate, not a published figure — confirm current review times with Kaysville City Building Department at (801) 544-1363.

You'll need: Building Permit Application (Cityinspect). Depending on your project, Kaysville may also ask for: Electrical Plan / Single-Line Diagram. See the required-documents checklist on this page for details on each.

Kaysville requires 4 inspection(s) for an ev charger / evse permit, in order: Rough-In, Service / Panel, Power Meter, Final. Schedule each through Kaysville City Building Department ((801) 544-1363).

Apply through Kaysville City Building Department at 23 E Center Street, Kaysville, UT 84037. Phone: (801) 544-1363, email: mailbox@kaysville.gov. Office hours: Mon–Thu 8:30 AM – 5:00 PM; Fri 8:30 AM – 1:00 PM (inspections available through 12:30 PM Fridays). Official information: https://www.kaysville.gov/182/Building-Permits.

Kaysville, Utah has adopted: 2021 International Residential Code (IRC) — one- & two-family dwellings and townhomes; REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria (kaysville.gov/750/Design-Criteria); Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Kaysville's own Design Criteria page, added here per statute; 2024 International Building Code (IBC), including Appendices C and J — commercial construction; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Mechanical Code (IMC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Plumbing Code (IPC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Fuel Gas Code (IFGC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2021 International Fire Code (IFC) — commercial; Kaysville Design Criteria. NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (which governs Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the City, no statutory edition change applies via § 15A-2-103; 2023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria already correctly reflects 2023; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Kaysville's own Design Criteria page or elsewhere on kaysville.gov, added here per statute since the City's own materials omit it; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026, supersedes the 2021 edition referenced in this file's Residential Pool Permit entry, which had not been updated as of 2026-07-16; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Kaysville's Design Criteria page (kaysville.gov/750/Design-Criteria) was live-checked 2026-07-16 and is ALREADY CORRECT — it states verbatim 'The 2021 IRC as adopted by the State of Utah Title 15A' for residential, and 'The 2024 IBC, IMC, IFC, IPC, IFGC, IECC, Etc, and the 2023 NEC as adopted by the State of Utah' for commercial (Kaysville does not separately itemize IEBC or ISPSC on this page). This file's earlier codesAdopted entries (rev. pre-2026-07-16) were stale relative to Kaysville's own already-updated page; both are now aligned to 2024/2021/2023 per statute. The Utah Code § 15A-2-103 citation in the sources array below has been updated to the current in-force version link. Local amendments apply — see the Kaysville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kaysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.