Accessory Building / Addition / Carport Permit in Kaysville, Utah

Required for detached garages, sheds, carports, and covered patios over 200 sq ft, or any accessory structure with electrical/plumbing regardless of size, in Kaysville.

Verified 2026-07-23 · Source

When you need this permit

  • Accessory structures 200 sq ft or larger
  • Any accessory structure (regardless of size) with added electrical and/or plumbing
  • Cannot be placed in front yards or required side yards
  • Structures 200+ sq ft must be at least 1 foot from property lines
  • Total accessory building area capped at the lesser of 10% of lot area or 3,000 sq ft (absent conditional use approval)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees) — accessory buildings are charged under the same valuation-based building-permit fee structure as additions
Valuation-based per ICC Current Valuation Data, plus 1% state education fee and 25% plan check fee
Construction Bond — Additions/Detached Garages/Accessory BuildingsKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
$500 (refundable upon final inspection approval)

Review timeline

Plan reviewTypical estimate — confirm current times with the Kaysville building department
~10–14 business days

How long did your Accessory Building / Addition / Carport Permit permit actually take in Kaysville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Footing depth and forms before concrete pour

  2. 2

    Framing

    Structure framing and any MEP rough-in

  3. 3

    Final

    Completed structure, setback compliance verified

See the full Kaysville inspection guide — scheduling & re-inspection fees →

Tips

  • Accessory buildings under 200 sq ft do not require a permit UNLESS electrical or plumbing is being added — in that case a permit is required for that portion of the work. (kaysville.gov/207/Accessory-Buildings)
  • Accessory structures cannot be placed in front yards or required side yards.
  • Total accessory building area is capped at the lesser of 10% of lot area or 3,000 sq ft; larger structures require conditional use approval.
  • A $500 refundable construction bond applies in addition to the valuation-based permit fee.

Frequently asked questions

Only if the shed is 200 sq ft or larger, or if you are adding electrical/plumbing to a smaller shed. (kaysville.gov/207/Accessory-Buildings)

In Kaysville, the published Building Permit Fee is: Valuation-based per ICC Current Valuation Data, plus 1% state education fee and 25% plan check fee. Additional published fees: Construction Bond — Additions/Detached Garages/Accessory Buildings — $500 (refundable upon final inspection approval). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an accessory building / addition / carport permit in Kaysville typically runs 10–14 business days. This is an estimate, not a published figure — confirm current review times with Kaysville City Building Department at (801) 544-1363.

You'll need: Building Permit Application (Cityinspect); Accessory Building/Addition/Carport Checklist; Site Plan. See the required-documents checklist on this page for details on each.

Kaysville requires 3 inspection(s) for an accessory building / addition / carport permit, in order: Footings, Framing, Final. Schedule each through Kaysville City Building Department ((801) 544-1363).

Apply through Kaysville City Building Department at 23 E Center Street, Kaysville, UT 84037. Phone: (801) 544-1363, email: mailbox@kaysville.gov. Office hours: Mon–Thu 8:30 AM – 5:00 PM; Fri 8:30 AM – 1:00 PM (inspections available through 12:30 PM Fridays). Official information: https://www.kaysville.gov/182/Building-Permits.

Kaysville, Utah has adopted: 2021 International Residential Code (IRC) — one- & two-family dwellings and townhomes; REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria (kaysville.gov/750/Design-Criteria); Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Kaysville's own Design Criteria page, added here per statute; 2024 International Building Code (IBC), including Appendices C and J — commercial construction; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Mechanical Code (IMC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Plumbing Code (IPC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Fuel Gas Code (IFGC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2021 International Fire Code (IFC) — commercial; Kaysville Design Criteria. NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (which governs Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the City, no statutory edition change applies via § 15A-2-103; 2023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria already correctly reflects 2023; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Kaysville's own Design Criteria page or elsewhere on kaysville.gov, added here per statute since the City's own materials omit it; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026, supersedes the 2021 edition referenced in this file's Residential Pool Permit entry, which had not been updated as of 2026-07-16; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Kaysville's Design Criteria page (kaysville.gov/750/Design-Criteria) was live-checked 2026-07-16 and is ALREADY CORRECT — it states verbatim 'The 2021 IRC as adopted by the State of Utah Title 15A' for residential, and 'The 2024 IBC, IMC, IFC, IPC, IFGC, IECC, Etc, and the 2023 NEC as adopted by the State of Utah' for commercial (Kaysville does not separately itemize IEBC or ISPSC on this page). This file's earlier codesAdopted entries (rev. pre-2026-07-16) were stale relative to Kaysville's own already-updated page; both are now aligned to 2024/2021/2023 per statute. The Utah Code § 15A-2-103 citation in the sources array below has been updated to the current in-force version link. Local amendments apply — see the Kaysville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kaysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.