Accessory Building Permit — Hurricane, Utah · Requirements sheet
Verified 2026-07-08 · Source: https://www.cityofhurricane.com/161/Building-Department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Building Permit in Hurricane, Utah
Required for accessory structures in Hurricane. Structures with a floor area under 120 square feet are exempt from building plan review unless they include electrical or plumbing, but a permit is still required to verify compliance with development standards such as setbacks.
Verified 2026-07-08 · Source
When you need this permit
- Accessory structures 120 sq ft or larger require full plan review
- Accessory structures under 120 sq ft are exempt from plan review UNLESS they include electrical or plumbing (in which case plan review is required)
- A permit is required for all accessory structures regardless of size, to verify compliance with applicable development standards including setbacks
- No structures of any kind are permitted within a public utility easement, regardless of zoning designation
- Setback compliance per Hurricane's Residential Setback Standards table (varies by zone: RA-1, RA-0.5, R1-15, R1-10, R1-8, R1-6, R1-4) — Front Yard 25' (N/A for R1-4), Rear Yard 2' (10' from main building), Interior/Street Side Yard 2'–10' depending on zone
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building, Electrical, Mechanical & Plumbing (combined trades, if applicable)
Required only if the accessory structure includes electrical or plumbing work; scheduled through City Inspect. Structures without electrical/plumbing that are under 120 sq ft still require a setback/compliance verification but not a full trade inspection sequence.
See the full Hurricane inspection guide — scheduling & re-inspection fees →
Tips
- A shed or accessory structure under 120 sq ft with no electrical or plumbing skips plan review but still needs a permit for setback verification — don't assume 'small enough to skip a permit entirely.'
- Regardless of zoning district, no structure of any kind (including accessory buildings) may be placed within a public utility easement.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hurricane building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hurricane
Accessory Building Permit in other cities
Compare accessory building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Hurricane project checklist
Describe your project once and get every permit, document, and fee it triggers in Hurricane — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →