EV Charger / EVSE Permit in Hurricane, Utah
Hurricane City does not publish a distinct EV charger/EVSE fee line item. Resolution 2025-39 (adopted December 4, 2025, Option B, Updating Building Permit Fee Calculations) adopts the standard 2021 IRC Table AL101.1 valuation-based permit fee schedule for all building/electrical work; EV charger installation is billed under this same valuation-based Building Permit Fee as standard electrical work, with no separate line found in this resolution or the city's Submitting a Building Permit Guide.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger
- Consultation with Hurricane City Power Department recommended before submittal to determine the project's electrical service needs (contact: powermike@hurricane.utah.gov, (435) 635-5536)
- Application submitted online via the City Inspect portal (hurricane.cityinspect.com)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building, Electrical, Mechanical & Plumbing (combined trades)
Scheduled through the builder's account on City Inspect once the permit is paid and issued. Hurricane does not perform same-day inspections — next-day inspection requests must be submitted through the portal by 3:00 PM the business day before.
- 2
Power Department Sign-off
Recommended pre-submittal consultation with Hurricane City Power (contact: powermike@hurricane.utah.gov, (435) 635-5536) to determine the project's power needs and service requirements before applying.
See the full Hurricane inspection guide — scheduling & re-inspection fees →
Tips
- Hurricane City has no distinct EV charger/EVSE fee line — Resolution 2025-39 (the current building permit fee resolution) and the Submitting a Building Permit Guide were both checked directly and contain no EV-specific line item.
- Contact the Hurricane City Power Department before disconnecting or upgrading an existing electrical service — consult prior to submittal to determine load and service requirements for the new charger circuit.
- All permit applications and inspection requests are submitted through the City Inspect online portal (hurricane.cityinspect.com).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hurricane building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hurricane
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Hurricane project checklist
Describe your project once and get every permit, document, and fee it triggers in Hurricane — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →