Commercial Tenant Improvement / Tenant Finish Permit — Hurricane, Utah · Requirements sheet
Reviewed 2026-08-02 · Source: https://www.cityofhurricane.com/161/Building-Department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Tenant Finish Permit in Hurricane, Utah
Required for tenant improvement and tenant finish work in existing commercial buildings in Hurricane. Hurricane does not publish a dedicated tenant-improvement checklist, application category, or TI-specific valuation method: neither the full text of Resolution 2025-39, the full Consolidated Fee Schedule (View/2678), the full 'Submitting a Building Permit' guide (View/2059), nor the Building Department page's own Forms list (17 forms, none tenant-improvement-related) contains a tenant-improvement, tenant-finish, remodel, alteration, or change-of-occupancy line item or document of any kind — a genuine gap in Hurricane's own published materials. Resolution 2025-39's operative text ('Building permit fees shall be calculated using [Table AL101.1]... within Hurricane City') is unrestricted in scope and not limited to new construction, so the general fee mechanism does apply as the only available framework — but Exhibit B is explicitly titled 'Square Foot Construction Cost' and provides a valuation method designed for whole-building new construction, with no stated method for valuing alteration/tenant-finish work on existing space (i.e., whether TI valuation uses this same per-square-foot new-construction rate applied to the finished square footage, or the contractor's actual declared project cost). That specific valuation question remains unresolved in the City's published materials.
Reviewed 2026-08-02 · Source
When you need this permit
- Commercial remodel or tenant improvement work in an existing commercial structure, regulated by the 2024 IBC and 2024 IEBC (existing building provisions)
- Application and plan submittal through the City Inspect online portal (hurricane.cityinspect.com)
- Construction plans and engineering appropriate to the scope of the tenant finish work — no dedicated Hurricane-published TI checklist was located to confirm the exact document list
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The Consolidated Fee Schedule (View/2678, 5 pages) carries no line items at all in its own 'Building Fees' section and instead states 'For current fee information please visit [the Building… Show full citationHide
The Consolidated Fee Schedule (View/2678, 5 pages) carries no line items at all in its own 'Building Fees' section and instead states 'For current fee information please visit [the Building Department page]' — Resolution 2025-39 is the sole published building-permit fee authority for every building-permit subtype in Hurricane, not just TI. Resolution 2025-39's operative clause ('Building permit fees shall be calculated using [Table AL101.1]... within Hurricane City') is unrestricted in scope, so the Table AL101.1 fee-lookup mechanism applies to TI work. What remains unsettled is the valuation INPUT: Exhibit B ('SQUARE FOOT CONSTRUCTION COST') is structured for computing whole-building new-construction valuation by occupancy type and does not publish a distinct method (e.g., percentage-of-new-construction-rate, or actual declared cost) for alteration/tenant-finish work on existing structures — unlike, e.g., Murray City's published 'Mall Tenant Finish' supplemental rate. Confirm the applicable TI valuation method with the Building Department, (435) 635-2811.Review timeline
Inspection process
- 1
Framing / Structural (if applicable)
Wall construction and any structural modifications verified before close-in, where applicable to the scope of work.
- 2
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 3
Final
All work complete before occupancy.
See the full Hurricane inspection guide — scheduling & re-inspection fees →
Tips
- Hurricane does not publish a dedicated tenant-improvement checklist or fee line distinct from new commercial construction — confirm document requirements and the applicable valuation method directly with the Building Department, (435) 635-2811, before submitting.
- Because the general commercial 'Table AL101.1 fee scale + Exhibit B occupancy valuation' mechanism is the only published fee framework for commercial work of any kind in Hurricane, it is the best available reference point for estimating a TI permit fee, but it is not confirmed as the exact TI method.
- Hurricane's published materials (Resolution 2025-39, the Consolidated Fee Schedule, the Submitting a Building Permit guide, and the Building Department page's full Forms list) leave one narrow question unanswered: how TI/alteration valuation is computed (same per-sq-ft new-construction rate vs. actual declared cost). The fee-table mechanism itself and the 21-business-day commercial review figure are both well-supported as applying generally to any commercial-category building permit, TI included.
- Hurricane City has no separate, published Change of Use or Change of Occupancy permit with its own fee. The city's own Business License Application (form PDF, DocumentCenter/View/2778) includes an office-use-only checklist with independent 'New Construction: yes/no', 'Remodel: yes/no', 'Building Permit: yes/no', and 'Certificate of Occupancy or Tenant Improvement inspection required: yes/no' fields — meaning a business license for an existing building can still trigger a CO/TI-inspection check even with no active building permit — but this is folded into the standard $75.00 Business License Application ($25.00 application + $50.00 license) rather than billed or processed as its own permit.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Applications & forms
Checklists & handouts
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hurricane building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Hurricane.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Property Access
Hurricane's permit history is searchable by address
366 permits on record for Hurricane, 1971–2022 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Hurricane
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Hurricane project checklist
Describe your project once and get every permit, document, and fee it triggers in Hurricane — in one checklist. Free, for any city and any number of projects.
Get started →