Sign Permit in Hurricane, Utah

Required for permanent signage in Hurricane, administered by the Planning & Zoning division. Fee differs based on whether the sign qualifies for staff-level review or requires Planning Commission review.

Verified 2026-07-22 · Source

When you need this permit

  • Signage subject to Hurricane's Zoning Ordinance sign standards
  • Staff Review track for signs meeting standard criteria
  • Planning Commission Review track for signs requiring discretionary review, billed per mailing address for public notice

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit (Staff Review)Hurricane City Consolidated Fee Schedule, current as of July 1, 2026 (Zoning Fees section): 'Sign Permit (Staff Review) ... $ 50.00.' Re-verified live 2026-07-22 by re-fetching and reading the current fee schedule PDF directly (page 5) -- corrects a prior $150.00 figure that was a stale/mis-transcribed value.
$50.00
Sign Permit (Planning Commission Review)Hurricane City Consolidated Fee Schedule, current as of July 1, 2026 (Zoning Fees section): 'Sign Permit (Planning Commission Review) $150.00.' Re-verified live 2026-07-22 -- corrects a prior figure that mistakenly used the separate 'Mailing Fee' line ($1.50/address, see below) as if it were this permit's own fee.
$150.00
Mailing FeeHurricane City Consolidated Fee Schedule, current as of July 1, 2026 (Zoning Fees section): 'Mailing Fee ... $1.50/address.' A separate, additional line item billed per address for required public-notice mailing on any application needing one (e.g. a Planning Commission-reviewed sign permit) -- not a replacement for that permit's own $150.00 fee.
$1.50 per address

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Hurricane?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Hurricane inspection guide — scheduling & re-inspection fees →

    Tips

    • Sign permits fall under the Planning & Zoning application category in City Inspect, not the Building Permits category.
    • Planning Commission Review signs carry their own $150.00 flat fee plus a separate $1.50/address Mailing Fee for the required public-notice mailing -- these are two distinct line items, not one combined per-address charge.

    Frequently asked questions

    Hurricane requires a sign permit for: Signage subject to Hurricane's Zoning Ordinance sign standards; Staff Review track for signs meeting standard criteria; Planning Commission Review track for signs requiring discretionary review, billed per mailing address for public notice. If your project isn't listed, confirm with Hurricane City Building Department at (435) 635-2811 before starting work.

    Per Hurricane's Consolidated Fee Schedule (current as of July 1, 2026), a staff-reviewed sign permit is a flat $50.00. Signs requiring Planning Commission review are $150.00, plus a separate $1.50-per-address Mailing Fee for public notice.

    Hurricane does not publish a plan-review timeline for this permit. Contact Hurricane City Building Department at (435) 635-2811 for current turnaround.

    You'll need: City Inspect Online Application (Planning and Zoning category). See the required-documents checklist on this page for details on each.

    Apply through Hurricane City Building Department at 147 N 870 W, Hurricane, UT 84737. Phone: (435) 635-2811, email: karri@hurricane.utah.gov. Official information: https://www.cityofhurricane.com/161/Building-Department.

    Hurricane, Utah has adopted: 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches Hurricane City's official Building Department page (live-checked 2026-07-16), which still displays the older 'EFFECTIVE JULY 1, 2023' banner text but lists the correct, still-current 2021 IRC.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on Hurricane's own Building Department page (live-checked 2026-07-16), added here per statute.; 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Hurricane's own Building Department page, live-checked 2026-07-16, still displays the 'EFFECTIVE JULY 1, 2023' banner listing the 2021 IBC — the city's page has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city page's lag. Note: Resolution 2025-39 Exhibit B already separately used a '2024 IBC Modified' Square Foot Construction Cost table for fee-valuation purposes (see entry below) — that fee-valuation reference now also happens to match the statute-current adopted edition, though it was adopted for valuation purposes only, not as a wholesale code-adoption statement.; 2024 International Plumbing Code (IPC) — statewide per Utah Code § 15A-2-103(1)(d), effective 7/1/2026; not itemized on Hurricane's own Building Department page (live-checked 2026-07-16, which lists only IRC/IBC/NEC), added here per statute since the city's own materials omit it entirely.; 2024 International Mechanical Code (IMC) — statewide per Utah Code § 15A-2-103(1)(e), effective 7/1/2026; not itemized on Hurricane's own Building Department page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f), effective 7/1/2026; not itemized on Hurricane's own Building Department page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Hurricane's own Building Department page lists '2020 National Electric Code' under its 'EFFECTIVE JULY 1, 2023' banner — one edition behind the statewide-mandatory floor, confirmed still unchanged via live-check 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of the city's own page.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — statewide per Utah Code § 15A-2-103(1)(h), effective 7/1/2026 (no residential/commercial split under current law); not itemized on Hurricane's own Building Department page (live-checked 2026-07-16), added here per statute. Note: the city's Building Department forms index lists a downloadable 'IRC_IECC Code Compliance (PDF)' form whose specific IECC edition was not independently verified in this pass — not asserted here.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i), effective 7/1/2026; not itemized on Hurricane's own Building Department page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n), effective 7/1/2026; not itemized on Hurricane's own Building Department page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed on Hurricane's own Building Department page, added here per statute.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Hurricane's Building Department page (cityofhurricane.com/161/Building-Department) was live-checked 2026-07-16 via real-browser navigation and confirmed still displaying its 'EFFECTIVE JULY 1, 2023' banner listing only 2021 IRC / 2021 IBC / 2020 National Electric Code — it does not itemize IPC, IMC, IFGC, IECC, IEBC, or ISPSC at all, and has not been updated for the 7/1/2026 statewide flip. The statewide statute controls over the city's un-updated page; codes the city omits entirely are added above per statute since they apply statewide regardless of local publication.. Local amendments apply — see the Hurricane overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-22.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hurricane building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.