Accessory Building Permit — Ephraim, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.ephraim.gov/288/Accessory-Building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Building Permit in Ephraim, Utah
Covers garages, carports, sheds, shipping containers, and similar accessory structures (Ephraim Land Use Ordinance § 10-08-010 definition). A written building permit is required only if the structure exceeds 200 square feet; smaller accessory buildings must still meet all setback, height, and coverage standards even though no written permit is required.
Verified 2026-07-19 · Source
When you need this permit
- Accessory building over 200 sq ft: formal building permit required from City/County. 200 sq ft or smaller: no written permit required, but all conditions below still apply.
- Located behind the front wall plane of the existing structure
- Setback 5 feet from side/rear property lines unless a fire wall is provided for the wall closest to the property line (otherwise standard 8' side / 20' rear setbacks apply)
- Max height 12' at property lines; roof may slope up away from property lines at 1'V to 1'H; buildings over 12' must step back 1 additional foot per foot of height above 12' unless neighbors approve in writing
- Max height 25' overall (ground to roof peak), residential only
- Covers less than 30% of the rear yard
- Single story only, unless authorized otherwise by conditional use permit
- Storm water runoff contained on-site; no encroachment into side/rear easements
- Meets fire and building codes for construction type, materials, and spacing/setbacks
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Ephraim inspection guide — scheduling & re-inspection fees →
Tips
- The 200-square-foot threshold is a bright line for whether a WRITTEN permit is required -- it does not exempt smaller structures from the underlying setback/height/coverage rules, which the City still enforces.
- No separate accessory-building permit fee is published; when a permit is required (over 200 sq ft), it is presumably assessed through the same county ICC-valuation-based building permit fee schedule used for other structures, but no accessory-specific dollar figure was found.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ephraim building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ephraim
Accessory Building Permit in other cities
Compare accessory building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Ephraim project checklist
Describe your project once and get every permit, document, and fee it triggers in Ephraim — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →