Multi-Family Development Building Permit — Ephraim, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.ephraim.gov/284/Multi-Family
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Multi-Family Development Building Permit in Ephraim, Utah
Required for apartment/multi-family residential development in Ephraim. Follows the same two-step process as single-family (Ephraim zoning approval, then Sanpete County structural building permit), with additional density, parking, and site-improvement standards reviewed against Ephraim's Land Use Ordinance.
Verified 2026-07-19 · Source
When you need this permit
- Property zoned R3 or R4 (Ephraim Land Use Ordinance § 10-4-4)
- Minimum lot size (density): 6,000 sq ft for the first unit, 2,000 sq ft for each additional unit (§ 10-4-4)
- Minimum floor area: 750 sq ft for the first unit, 650 sq ft for each additional unit (§ 10-4-4)
- Minimum landscaping: 20% of lot (§ 10-4-4)
- 6-foot sight-obscuring fence around sides and rear of property (§ 10-4-4, § 10-3-4)
- Minimum 70-foot frontage for R3/R4 zones (§ 10-5-2, Table A)
- Minimum setbacks: 20' front, 8' sides, 20' rear (§ 10-5-2, Table A)
- Maximum height: 45' to peak of roof, 3 stories (§ 10-5-2, Table A)
- Off-street parking: 1.5 paved spaces per bedroom (§ 10-3-6, § 10-5-5, Table D)
- Storm drainage detention sized for a 10-year, 24-hour storm (§ 10-3-6)
- New fire hydrant required if building exceeds 250 feet from the nearest existing hydrant
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Residential Occupancy Final Inspection
Sanpete County Building Department's Residential Occupancy Final Inspection Checklist applies, with city sign-off required before final approval per the checklist's item 32.
See the full Ephraim inspection guide — scheduling & re-inspection fees →
Tips
- Density and floor-area minimums are stated per unit (e.g., 2,000 sq ft of additional lot area and 650 sq ft of additional floor area for each unit beyond the first) -- undersizing a lot for the proposed unit count is a common reason a preliminary layout is rejected.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ephraim building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ephraim
Compare multi-family development building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Ephraim project checklist
Describe your project once and get every permit, document, and fee it triggers in Ephraim — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →