Sign Permit in Ephraim, Utah

Required for permanent and temporary signage in Ephraim, issued directly by Ephraim City (not routed through Sanpete County). Governed by the City's sign size regulations (Land Use Ordinance § 10.20.040, Table C) and general sign regulations (§ 10.12.050).

Verified 2026-07-19 · Source

When you need this permit

  • Complies with sign size regulations (Ephraim Land Use Ordinance § 10.20.040, Table C)
  • Complies with general sign regulations (§ 10.12.050)
  • Applicant must be the property owner or have the owner's co-signature on the application
  • Site plan showing sign location on the property, plus dimensioned plans/drawings including footings
  • Tax Parcel Map from the County Recorder

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Temporary SignEphraim City Sign Permit Application, DocumentCenter/View/121.
$15
Permanent SignEphraim City Sign Permit Application, DocumentCenter/View/121.
$25

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Ephraim?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Ephraim inspection guide — scheduling & re-inspection fees →

    Tips

    • Zoning permits, including Sign Permits, expire six months from the date issued if substantive work under the permit has not begun, per the Sign Permit Application form itself.

    Frequently asked questions

    Ephraim requires a sign permit for: Complies with sign size regulations (Ephraim Land Use Ordinance § 10.20.040, Table C); Complies with general sign regulations (§ 10.12.050); Applicant must be the property owner or have the owner's co-signature on the application; Site plan showing sign location on the property, plus dimensioned plans/drawings including footings; Tax Parcel Map from the County Recorder. If your project isn't listed, confirm with Ephraim City Community Development Department handles zoning/Land Use Permit approval, which is a mandatory prerequisite for a building permit; the actual structural building permit is issued and inspected by the Sanpete County Building Department, which serves Ephraim and every other city in Sanpete County under a countywide building-official arrangement. Per the county's own Building Department page: 'For properties located within city limits, zoning approval must be obtained from the applicable city prior to submitting a permit application.' at 435-283-4631 (Ephraim City Hall); 435-835-2113 (Sanpete County Building Department) before starting work.

    In Ephraim, the published Temporary Sign is: $15. Additional published fees: Permanent Sign — $25. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Ephraim does not publish a plan-review timeline for this permit. Contact Ephraim City Community Development Department handles zoning/Land Use Permit approval, which is a mandatory prerequisite for a building permit; the actual structural building permit is issued and inspected by the Sanpete County Building Department, which serves Ephraim and every other city in Sanpete County under a countywide building-official arrangement. Per the county's own Building Department page: 'For properties located within city limits, zoning approval must be obtained from the applicable city prior to submitting a permit application.' at 435-283-4631 (Ephraim City Hall); 435-835-2113 (Sanpete County Building Department) for current turnaround.

    You'll need: Ephraim City Sign Permit Application. See the required-documents checklist on this page for details on each.

    Apply through Ephraim City Community Development Department handles zoning/Land Use Permit approval, which is a mandatory prerequisite for a building permit; the actual structural building permit is issued and inspected by the Sanpete County Building Department, which serves Ephraim and every other city in Sanpete County under a countywide building-official arrangement. Per the county's own Building Department page: 'For properties located within city limits, zoning approval must be obtained from the applicable city prior to submitting a permit application.' at Ephraim City Community Development: 5 South Main Street, Ephraim, UT 84627. Sanpete County Building Department: 160 North Main, Suite 201, Manti, UT 84642.. Phone: 435-283-4631 (Ephraim City Hall); 435-835-2113 (Sanpete County Building Department), email: No dedicated Community Development or Building Official email is published on ephraim.gov or sanpetecountyutah.gov as of 2026-07-19; applicants are directed to the phone numbers above.. Office hours: Ephraim City Hall: Monday-Thursday 8:00 AM-5:30 PM, Friday 8:00 AM-12:00 PM (per ephraim.gov/277/Contact-Us). Sanpete County Building Department: Monday-Thursday 7:00 AM-6:00 PM, closed Fridays (per sanpetecountyutah.gov/building-dept.html).. Official information: https://www.ephraim.gov/178/Community-Development.

    Ephraim, Utah has adopted: No separately adopted local building code was found for Ephraim City or Sanpete County; both apply Utah's statewide State Construction Code under Utah Code Title 15A. Per Utah Code § 15A-2-103 (version effective 7/1/2026, current as of 2026-07-19): 2024 International Building Code (including Appendices C and J), 2021 International Residential Code (including Appendix AQ), 2024 International Plumbing Code, 2024 International Mechanical Code, 2024 International Fuel Gas Code, 2023 National Electrical Code, 2024 International Energy Conservation Code, 2024 International Existing Building Code, the HUD Code and 2005 NFPA 225 for manufactured homes, and the residential provisions of the 2024 International Swimming Pool and Spa Code.; Utah Code § 15A-2-103(2) separately authorizes a local compliance agency to adopt the 2006 Utah Wildland Urban Interface (WUI) Code by local ordinance. Sanpete County's Building Department page links a WUI page and county WUI maps and requires an onsite inspection before a WUI plan is approved (per the county's Residential Building Plans Requirement Checklist), indicating the WUI code is applied in practice, but no formal county or city WUI-adoption ordinance was located to confirm the exact edition/amendments.; DISCREPANCY FLAGGED: Sanpete County's own 'Residential Building Plans Requirement Checklist' (sanpetecountyutah.gov/DocumentCenter/View/722/Building-Plans-Checklist) still labels its general construction plan section 'GENERAL CONSTRUCTION PLAN AS PER 2009 IRC' and cites '603 IMC 2012' for duct sizing — both several code cycles behind the current statewide-adopted 2021 IRC / 2024 IMC. This checklist document itself does not carry a visible revision date. Applicants should confirm the currently enforced code edition directly with the Building Official rather than relying on the checklist's code-year references.. Local amendments apply — see the Ephraim overview page for the full list.