EV Charger / EVSE Permit in Ephraim, Utah

Ephraim building permits, including electrical work, are issued and inspected by the Sanpete County Building Department under the countywide arrangement that serves every city in the county. The county's official Building Department page states that construction work involving electrical, plumbing, or mechanical systems requires a building permit, but publishes no distinct EV-charger/EVSE permit type or fee category. EV charger installation is therefore handled as standard electrical work under the countywide, ICC-valuation-based building permit fee; no EV-specific dollar figure is asserted here since none is published.

Reviewed 2026-07-20 · Source

When you need this permit

  • Ephraim City Land Use (Zoning) Permit approval obtained before submitting to Sanpete County, per the county Building Department's stated process for city-limits properties
  • Installation of a Level 2 or DC fast EV charger (EVSE), regulated as electrical work by the statewide-adopted 2023 NEC (Utah Code § 15A-2-103(1)(g))
  • Building permit application submitted to and issued by the Sanpete County Building Department

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

County structural/electrical building permit feeSame countywide, auto-updating, city-rate-tier methodology described in Sanpete County Commission Meeting Minutes, December 5, 2023 (Book U, pp. 279-280). No separate EV-charger or standalone-electrical dollar figure is published.
ICC Building Valuation Data-based; no static current dollar figure published

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Ephraim?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Field inspection by the Sanpete County Building Department, (435) 835-2113.

See the full Ephraim inspection guide — scheduling & re-inspection fees →

Tips

  • Ephraim EV charger installations go through the same two-step process as other building permits: Ephraim City Land Use (Zoning) approval first, then the Sanpete County Building Department for the actual permit and inspection.
  • The county's building-permit fee is not a fixed dollar table; it is recalculated from ICC valuation data roughly every six months, with city-limits properties like Ephraim getting the lowest of the county's three rate tiers. Get a current quote from the Building Department rather than budgeting off an old figure.
  • No official Ephraim or Sanpete County source names a distinct EV-charger or EVSE permit — treat it as a standard electrical building permit application.

Frequently asked questions

Ephraim requires an ev charger / evse permit for: Ephraim City Land Use (Zoning) Permit approval obtained before submitting to Sanpete County, per the county Building Department's stated process for city-limits properties; Installation of a Level 2 or DC fast EV charger (EVSE), regulated as electrical work by the statewide-adopted 2023 NEC (Utah Code § 15A-2-103(1)(g)); Building permit application submitted to and issued by the Sanpete County Building Department. If your project isn't listed, confirm with Ephraim City Community Development Department handles zoning/Land Use Permit approval, which is a mandatory prerequisite for a building permit; the actual structural building permit is issued and inspected by the Sanpete County Building Department, which serves Ephraim and every other city in Sanpete County under a countywide building-official arrangement. Per the county's own Building Department page: 'For properties located within city limits, zoning approval must be obtained from the applicable city prior to submitting a permit application.' at 435-283-4631 (Ephraim City Hall); 435-835-2113 (Sanpete County Building Department) before starting work.

No distinct EV-charger permit or fee is published. Ephraim's building permits, including electrical work, are issued by the Sanpete County Building Department under the same ICC-valuation-based fee structure used for all construction; get a current quote from the county Building Department, (435) 835-2113.

Ephraim does not publish a plan-review timeline for this permit. Contact Ephraim City Community Development Department handles zoning/Land Use Permit approval, which is a mandatory prerequisite for a building permit; the actual structural building permit is issued and inspected by the Sanpete County Building Department, which serves Ephraim and every other city in Sanpete County under a countywide building-official arrangement. Per the county's own Building Department page: 'For properties located within city limits, zoning approval must be obtained from the applicable city prior to submitting a permit application.' at 435-283-4631 (Ephraim City Hall); 435-835-2113 (Sanpete County Building Department) for current turnaround.

You'll need: Ephraim Land Use (Zoning) Permit; Sanpete County Building Permit Application. See the required-documents checklist on this page for details on each.

Ephraim requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Ephraim City Community Development Department handles zoning/Land Use Permit approval, which is a mandatory prerequisite for a building permit; the actual structural building permit is issued and inspected by the Sanpete County Building Department, which serves Ephraim and every other city in Sanpete County under a countywide building-official arrangement. Per the county's own Building Department page: 'For properties located within city limits, zoning approval must be obtained from the applicable city prior to submitting a permit application.' (435-283-4631 (Ephraim City Hall); 435-835-2113 (Sanpete County Building Department)).

Apply through Ephraim City Community Development Department handles zoning/Land Use Permit approval, which is a mandatory prerequisite for a building permit; the actual structural building permit is issued and inspected by the Sanpete County Building Department, which serves Ephraim and every other city in Sanpete County under a countywide building-official arrangement. Per the county's own Building Department page: 'For properties located within city limits, zoning approval must be obtained from the applicable city prior to submitting a permit application.' at Ephraim City Community Development: 5 South Main Street, Ephraim, UT 84627. Sanpete County Building Department: 160 North Main, Suite 201, Manti, UT 84642.. Phone: 435-283-4631 (Ephraim City Hall); 435-835-2113 (Sanpete County Building Department), email: No dedicated Community Development or Building Official email is published on ephraim.gov or sanpetecountyutah.gov as of 2026-07-19; applicants are directed to the phone numbers above.. Office hours: Ephraim City Hall: Monday-Thursday 8:00 AM-5:30 PM, Friday 8:00 AM-12:00 PM (per ephraim.gov/277/Contact-Us). Sanpete County Building Department: Monday-Thursday 7:00 AM-6:00 PM, closed Fridays (per sanpetecountyutah.gov/building-dept.html).. Official information: https://www.ephraim.gov/178/Community-Development.

Ephraim, Utah has adopted: No separately adopted local building code was found for Ephraim City or Sanpete County; both apply Utah's statewide State Construction Code under Utah Code Title 15A. Per Utah Code § 15A-2-103 (version effective 7/1/2026, current as of 2026-07-19): 2024 International Building Code (including Appendices C and J), 2021 International Residential Code (including Appendix AQ), 2024 International Plumbing Code, 2024 International Mechanical Code, 2024 International Fuel Gas Code, 2023 National Electrical Code, 2024 International Energy Conservation Code, 2024 International Existing Building Code, the HUD Code and 2005 NFPA 225 for manufactured homes, and the residential provisions of the 2024 International Swimming Pool and Spa Code.; Utah Code § 15A-2-103(2) separately authorizes a local compliance agency to adopt the 2006 Utah Wildland Urban Interface (WUI) Code by local ordinance. Sanpete County's Building Department page links a WUI page and county WUI maps and requires an onsite inspection before a WUI plan is approved (per the county's Residential Building Plans Requirement Checklist), indicating the WUI code is applied in practice, but no formal county or city WUI-adoption ordinance was located to confirm the exact edition/amendments.; DISCREPANCY FLAGGED: Sanpete County's own 'Residential Building Plans Requirement Checklist' (sanpetecountyutah.gov/DocumentCenter/View/722/Building-Plans-Checklist) still labels its general construction plan section 'GENERAL CONSTRUCTION PLAN AS PER 2009 IRC' and cites '603 IMC 2012' for duct sizing — both several code cycles behind the current statewide-adopted 2021 IRC / 2024 IMC. This checklist document itself does not carry a visible revision date. Applicants should confirm the currently enforced code edition directly with the Building Official rather than relying on the checklist's code-year references.. Local amendments apply — see the Ephraim overview page for the full list.