Commercial Building Permit in Kaysville, Utah

Required for new commercial building construction in Kaysville, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Kaysville's own Design Criteria page was already updated to reflect this as of live re-check 2026-07-16). The Building Permit Fee uses the same valuation-based table as residential, but commercial plan check is 55% of the permit fee (versus 25% residential, 35% multi-family), and the plan review deposit is $1,000 (versus $25 residential).

Verified 2026-07-19 · Source

When you need this permit

  • New commercial building construction on a permitted, properly zoned lot
  • Complete architectural and structural drawings
  • Commercial Plan Review Deposit ($1,000) paid at submittal
  • Roadway, Fire, and Public Safety non-residential impact fees calculated per 1,000 sq ft

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation-based (UBC 1997 table, same as residential)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees (kaysville.municipalcodeonline.com/book?type=fees), effective 7/1/2026, most recently amended by Res. 26-06-06 (6/18/2026); live browser render verified directly 2026-07-19. Valuation based on ICC Current Building Valuation Data. Same table used for both residential and commercial.
$1.00–$500: $23.50. $500.01–$2,000: $23.50 + $3.05/$100. $2,000.01–$25,000: $69.25 + $14.00/$1,000. $25,000.01–$50,000: $391.25 + $10.10/$1,000. $50,000.01–$100,000: $643.75 + $7.00/$1,000. $100,000.01–$500,000: $993.75 + $5.60/$1,000. $500,000.01–$1,000,000: $3,233.75 + $4.75/$1,000. Over $1,000,000: $5,608.75 + $3.65/$1,000.
Plan Check Fee — CommercialKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees: 'Plan Check Fee — Residential - 25% of permit fee / Multi-family - 35% of permit fee / Commercial - 55% of permit fee / 10% of permit fee (review of duplicate plans).' Live browser render verified directly 2026-07-19.
55% of permit fee
Commercial Plan Review DepositKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees: 'Commercial Plan Review Deposit (applied to total plan review charge) — $1,000.00.' Live browser render verified directly 2026-07-19 — 40x the $25.00 residential plan review deposit.
$1,000.00 (applied to total plan review charge)
State FeeKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees.
1% of permit fee
Construction Guaranty Bond — New (Commercial)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'BONDS' section: 'Construction Guaranty Bond - New — $1,500.00'; and the Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees), 'Construction Bonds' section: 'Commercial and single family dwellings are $1,500.'
$1,500.00 (refundable upon final occupancy permit)
Roadway Facilities Impact Fee — Non-Residential (per 1,000 sq ft)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'ROADWAY FACILITIES' table; live browser render verified directly 2026-07-19.
General Commercial $3,696.00; Office $1,783.00; Institutional/Church $1,152.00; Light Industrial $1,104.00
Fire Facilities Impact Fee — Non-ResidentialKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'FIRE FACILITIES' table (versus $296.00 flat for residential).
$529.00 per 1,000 sq ft
Public Safety Facilities Impact Fee — Non-ResidentialKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'PUBLIC SAFETY FACILITIES' table (versus $356.00 flat for residential).
$205.00 per 1,000 sq ft
Power Impact Fee — Commercial (examples; Single Phase and 3 Phase tables)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'POWER IMPACT FEES' table; Kaysville operates its own municipal power utility. Live browser render verified directly 2026-07-19.
Commercial Single Phase 200A: $3,817.00; Commercial 3 Phase (120/240V) 200A: $5,725.00; Commercial 3 Phase (277/480V) 200A: $13,359.00 (full table has 6+ tiers per phase configuration up to 2,000A)
Site Plan Review (Commercial)Kaysville City Consolidated Fee Schedule, Community Development > Site Development Review, 'BASE FEES' and 'ADDITIONAL AMOUNTS FROM FACTORS' tables; live browser render verified directly 2026-07-19.
$400.00 base fee, plus add-on factors (e.g., 50% surcharge if streams/creeks/ditches on-site, traffic study fee if generating >300 daily trips or corner-lot commercial, consultant/coordination hourly add-ons)

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Kaysville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts, per 2024 IBC.

  2. 2

    Framing / Structural

    After framing, sheathing, and structural work — before insulation or wall cover.

  3. 3

    MEP Rough-In

    Electrical, plumbing, and mechanical rough-in inspected before walls closed.

  4. 4

    Power Meter

    Kaysville City Power meter set/connection, scheduled after permit is paid.

  5. 5

    Final

    All work complete before certificate of occupancy is issued.

See the full Kaysville inspection guide — scheduling & re-inspection fees →

Tips

  • Kaysville's commercial Plan Check Fee (55% of permit fee) sits between its residential (25%) and reflects a genuinely tiered system that also includes a distinct multi-family rate (35%) — three separate percentages, not just a residential/commercial split.
  • The $1,000 Commercial Plan Review Deposit is 40 times the $25 residential deposit — budget for this substantially larger upfront cost before plan review even begins.
  • Kaysville operates its own municipal power utility with a detailed commercial power impact fee table split by single-phase vs. three-phase (120/240V, 120/208V, 277/480V) service configurations — the exact voltage/phase configuration significantly changes the impact fee (e.g., $5,725 vs. $13,359 for the same 200A service at different phase configurations).
  • Non-residential Roadway, Fire, and Public Safety impact fees are all charged per 1,000 sq ft rather than as a flat per-unit fee like residential — total impact fees scale directly with building size.

Frequently asked questions

Kaysville requires a commercial building permit for: New commercial building construction on a permitted, properly zoned lot; Complete architectural and structural drawings; Commercial Plan Review Deposit ($1,000) paid at submittal; Roadway, Fire, and Public Safety non-residential impact fees calculated per 1,000 sq ft. If your project isn't listed, confirm with Kaysville City Building Department at (801) 544-1363 before starting work.

The base Building Permit Fee uses the same valuation table as residential (e.g., $5,608.75 plus $3.65 per additional $1,000 over $1,000,000). Commercial plan check is 55% of that fee (vs. 25% residential), plus a $1,000 Commercial Plan Review Deposit (vs. $25 residential), a 1% state fee, and a $1,500 construction guaranty bond. Non-residential impact fees also apply: Roadway ($1,104–$3,696 per 1,000 sq ft depending on use), Fire ($529 per 1,000 sq ft), Public Safety ($205 per 1,000 sq ft), and a detailed commercial power impact fee table.

No commercial-specific turnaround is published. Kaysville's general 'approximately two weeks' estimate applies to plan-review permits broadly, but commercial submittals require a much larger $1,000 plan review deposit, suggesting more involved review. Call (801) 544-1363 for a current estimate.

You'll need: Building Permit Application (Cityinspect); Construction Plans; Commercial Plan Review Deposit ($1,000). See the required-documents checklist on this page for details on each.

Kaysville requires 5 inspection(s) for a commercial building permit, in order: Foundation / Footing, Framing / Structural, MEP Rough-In, Power Meter, Final. Schedule each through Kaysville City Building Department ((801) 544-1363).

Apply through Kaysville City Building Department at 23 E Center Street, Kaysville, UT 84037. Phone: (801) 544-1363, email: mailbox@kaysville.gov. Office hours: Mon–Thu 8:30 AM – 5:00 PM; Fri 8:30 AM – 1:00 PM (inspections available through 12:30 PM Fridays). Official information: https://www.kaysville.gov/182/Building-Permits.

Kaysville, Utah has adopted: 2021 International Residential Code (IRC) — one- & two-family dwellings and townhomes; REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria (kaysville.gov/750/Design-Criteria); Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Kaysville's own Design Criteria page, added here per statute; 2024 International Building Code (IBC), including Appendices C and J — commercial construction; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Mechanical Code (IMC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Plumbing Code (IPC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Fuel Gas Code (IFGC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-16; 2021 International Fire Code (IFC) — commercial; Kaysville Design Criteria. NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (which governs Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the City, no statutory edition change applies via § 15A-2-103; 2023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria already correctly reflects 2023; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Kaysville's own Design Criteria page or elsewhere on kaysville.gov, added here per statute since the City's own materials omit it; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026, supersedes the 2021 edition referenced in this file's Residential Pool Permit entry, which had not been updated as of 2026-07-16; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Kaysville's Design Criteria page (kaysville.gov/750/Design-Criteria) was live-checked 2026-07-16 and is ALREADY CORRECT — it states verbatim 'The 2021 IRC as adopted by the State of Utah Title 15A' for residential, and 'The 2024 IBC, IMC, IFC, IPC, IFGC, IECC, Etc, and the 2023 NEC as adopted by the State of Utah' for commercial (Kaysville does not separately itemize IEBC or ISPSC on this page). This file's earlier codesAdopted entries (rev. pre-2026-07-16) were stale relative to Kaysville's own already-updated page; both are now aligned to 2024/2021/2023 per statute. The Utah Code § 15A-2-103 citation in the sources array below has been updated to the current in-force version link. Local amendments apply — see the Kaysville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kaysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Kaysville.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.