Kaysville building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Kaysville, Utah.

Verified 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
23 E Center Street, Kaysville, UT 84037
Phone
(801) 544-1363
Office hours
Mon–Thu 8:30 AM – 5:00 PM; Fri 8:30 AM – 1:00 PM (inspections available through 12:30 PM Fridays)

Published scheduling rules

  • Kaysville is closed Friday afternoons (last inspection slot 12:30 PM) and all day Saturday/Sunday. Schedule inspections with at least 24 hours' notice by calling (801) 544-1363. (Residential Building Permit)
  • Kaysville is closed Friday afternoons after 1:00 PM (last inspection slot 12:30 PM) and all day Saturday/Sunday. Schedule inspections with at least 24 hours' notice by calling (801) 544-1363. (General)

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts, per 2024 IBC.

  2. 2

    Framing / Structural

    After framing, sheathing, and structural work — before insulation or wall cover.

  3. 3

    MEP Rough-In

    Electrical, plumbing, and mechanical rough-in inspected before walls closed.

  4. 4

    Power Meter

    Kaysville City Power meter set/connection, scheduled after permit is paid.

  5. 5

    Final

    All work complete before certificate of occupancy is issued.

Applies to: Demolition Permit

  1. 1

    Power Meter Disconnect

    Kaysville City Power meter disconnect, scheduled after permit is paid

  2. 2

    Water Meter Disconnect

    Kaysville City Water meter disconnect, scheduled after permit is paid

  3. 3

    Sewer Cap

    Sewer line capped per code

  4. 4

    Final

    Site cleared, backfilled if foundation/basement removed, erosion/water-accumulation control in place

  5. 5

    Bond Release

    Performance deposit ($200) released after passing Final inspection

Applies to: Basement Finish Permit

  1. 1

    Framing

    Wall framing, fire blocking, egress window openings

  2. 2

    MEP Rough-In (4-way)

    Electrical, plumbing, and HVAC rough-ins before walls closed

  3. 3

    Insulation

    Insulation on exterior walls, vapor barrier placement

  4. 4

    Final

    Drywall, fixtures, smoke/CO detectors, and all finishes complete

Applies to: Electrical Permit / Service Upgrade

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors

  3. 3

    Power Meter

    Kaysville City Power meter set/connection, scheduled after permit is paid

  4. 4

    Final

    All devices installed, GFCI/AFCI protection verified, panel labeled

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors, if the charger requires a service upgrade

  3. 3

    Power Meter

    Kaysville City Power meter set/connection, scheduled after permit is paid

  4. 4

    Final

    Charger connection, GFCI/breaker protection, and panel labeling verified complete

Applies to: Residential Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Framing

    After framing, sheathing, and rough-in MEP — before insulation or wall cover

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete — certificate of occupancy issued upon passing

Applies to: Accessory Building / Addition / Carport Permit

  1. 1

    Footings

    Footing depth and forms before concrete pour

  2. 2

    Framing

    Structure framing and any MEP rough-in

  3. 3

    Final

    Completed structure, setback compliance verified

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Structural (if applicable)

    Interior wall framing and structural connections verified before close-in, where the scope includes structural work.

  2. 2

    MEP Rough-In

    Electrical, plumbing, and mechanical rough-in for the tenant space, inspected before walls closed.

  3. 3

    Final

    All tenant-finish or remodel work complete before occupancy.

Applies to: Residential Pool Permit

  1. 1

    Pre-Gunite / Bonding

    Steel, plumbing, and electrical bonding before shotcrete/gunite or liner installation

  2. 2

    Barrier / Fence

    Pool barrier compliance verified before water can be introduced

  3. 3

    Final

    Equipment, bonding, and barrier complete

Applies to: Change of Use / Change of Occupancy

  1. 1

    Fire Department Business Inspection (if no construction)

    Required before a new commercial business license is issued for a space, per Kaysville's published business-licensing guidance; billed as the $100 Business Inspection fee newly adopted in the FY2027 Consolidated Fee Schedule.

  2. 2

    Building Permit inspections (if construction accompanies the change of use)

    See the Commercial Building Permit / Commercial Tenant Improvement Permit inspection sequences.

Applies to: Roofing Permit

  1. 1

    Dry-In

    After tear-off and underlayment/ice barrier installed, before final roofing material applied

  2. 2

    Final

    Completed roof — verify ice barrier, flashing, and nailing per manufacturer instructions

Applies to: Solar Panel Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final / Structural

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kaysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Kaysville building permits

Get alerts for Kaysville

We'll email you when Kaysville's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.