Solar Panel Permit in Draper, Utah
Required for installation of rooftop or ground-mounted solar PV systems and energy storage systems (ESS) in Draper. Listed as 'Solar/PV/ESS' in Draper's permit portal. Draper charges a flat $600 residential solar review fee per Resolution 26-29.
Verified 2026-07-13 · Source
When you need this permit
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery/energy storage system (ESS) installation
- Electrical service upgrade for solar interconnection
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified
See the full Draper inspection guide — scheduling & re-inspection fees →
Tips
- Draper charges a flat $600.00 residential solar review fee per Resolution 26-29 — this is the total permit fee for residential Solar/PV/ESS.
- Rocky Mountain Power interconnection approval is required before the system can be energized.
- Fire department access pathways are required on rooftop solar installations — maintain required clearances.
- Apply as 'Solar/PV/ESS' permit type in the Draper Online Services Portal at draper.onlama.com.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Draper
Solar Panel Permit in other cities
Compare solar panel permit fees across Utah →
Look up this fee in a different city →