Solar Panel Permit in Draper, Utah

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Draper.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Solar Permit (Residential)$150
Solar Permit (Commercial)Valuation-based per UBC Schedule
State Surcharge1% of permit fee

Review timeline

~514 business days

Typical estimate — confirm current times with the Draper building department

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final/Structural

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections

Tips

Frequently asked questions

Do I need a permit for solar panels in Draper?
Yes. Draper requires both a building permit (for structural mounting) and an electrical permit (for wiring) for solar installations. Many installers handle the permitting process.
How long does a solar permit take in Draper?
Solar permits in Draper typically take 5-14 business days for plan review. Some jurisdictions offer expedited review for residential solar under SolarAPP+ or similar programs.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Draper

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.