Skip to main content
PermitBase

Solar Panel Permit in Logan, Utah

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Logan. Logan's Building Permit Fee Resolution No. 20-09 charges residential solar based on project value and charges commercial solar a flat $200 (building division only, separate from any electrical permit).

Verified 2026-07-19 · Source

When you need this permit

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation (requires separate electrical permit for wiring)
  • Electrical service upgrade for solar interconnection

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar Permit (Residential — Building Division only)Logan City Building Permit Fee Resolution No. 20-09, 'Other and Miscellaneous Permits Fees' table: 'Solar Permit (Residential-Building Division Only) — Based on Project Value.' (Corrected 2026-07-19: this record previously had the residential and commercial figures swapped.)
Based on Project Value
Solar Permit (Commercial — Building Division only)Logan City Building Permit Fee Resolution No. 20-09, 'Other and Miscellaneous Permits Fees' table: 'Solar Permit (Commercial-Building Division Only) — $200.00.'
$200.00
State SurchargeLogan City Building Permit Fees — Resolution No. 20-09
1% of permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Logan building department
~5–14 business days

How long did your Solar Panel Permit permit actually take in Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final / Structural

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified

See the full Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Logan City has its own municipal Light & Power utility — new solar installations must be coordinated through Logan City Light & Power, not Rocky Mountain Power. See loganutah.gov/government/departments/light_and_power/solar/.
  • Residential solar permit fees in Logan are based on project value (not a flat fee) — only commercial solar is a flat $200 building-division fee. An electrical permit (8% of building permit fee) is also required for the wiring/inverter regardless of building type.
  • The 2023 NEC governs solar electrical installations; 3-foot fire department access pathways are required on the roof per IFC.
  • Solar battery storage only installations use a separate Logan form ('Solar Battery Install Only').

Frequently asked questions

Yes. Logan requires a solar permit for all rooftop and ground-mounted PV installations. Per Logan City Building Permit Fee Resolution No. 20-09, residential solar is charged based on project value while commercial solar is a flat $200 (building division only), plus an electrical permit (8% of building permit fee) and 1% state surcharge. Coordinate with Logan City Light & Power for grid interconnection.

In Logan, the published Solar Permit (Residential — Building Division only) is: Based on Project Value. Additional published fees: Solar Permit (Commercial — Building Division only) — $200.00; State Surcharge — 1% of permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a solar panel permit in Logan typically runs 5–14 business days. This is an estimate, not a published figure — confirm current review times with Logan City Building & Safety Division at (435) 716-9030.

You'll need: Solar Permit Application; Solar Site Plan / Roof Plan; Electrical Single-Line Diagram; Structural Analysis; Equipment Specifications. Depending on your project, Logan may also ask for: Interconnection Agreement. See the required-documents checklist on this page for details on each.

Logan requires 2 inspection(s) for a solar panel permit, in order: Rough Electrical, Final / Structural. Schedule each through Logan City Building & Safety Division ((435) 716-9030).

Apply through Logan City Building & Safety Division at 290 N 100 W, Logan, UT 84321. Phone: (435) 716-9030, email: loganplanreview@loganutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.loganutah.org/government/departments/community_development/building_department/index.php.

Logan, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Logan's own 'Current Building Codes & Engineering Design Requirements' document is dated 'Effective July 2023' / 'Updated: 07/2023' and still lists the 2021 IBC — it has not been updated for the 7/1/2026 code cycle.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Logan's own (stale, July 2023) codes document also lists this edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. Logan's own codes document (July 2023) lists a '2020 National Electrical Code' — this was already stale before this fix and remains so; the statewide 2023 NEC governs.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition. NOTE: no IEBC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition. NOTE: no ISPSC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2017 ICC A117.1 (Accessibility) — Logan City 'Current Building Codes & Engineering Design Requirements' (dated Effective July 2023 / Updated 07/2023); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Logan's own codes document (loganutah.org/departments/comdev/building/Current%20Building%20Codes%202023.pdf) was fetched live and confirmed stale — dated 'Effective July 2023' / 'Updated: 07/2023', listing 2021 IBC/IRC/IMC/IPC/IFGC/IECC and a '2020 National Electrical Code' (itself outdated even relative to the pre-7/1/2026 baseline); it has not been revised for either the 2023 NEC correction or the 7/1/2026 code cycle.. Local amendments apply — see the Logan overview page for the full list.

No. Logan has its own municipal electric utility — Logan City Light & Power. Solar interconnection applications go through Logan City Light & Power, not Rocky Mountain Power.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.