Required for electrical work including panel upgrades, new circuits, rewiring, service changes, and new construction wiring in Logan. Governed by the 2023 NEC (adopted statewide by Utah Code § 15A-2-103(1)(g)). EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; Logan's Building Permit Fee Resolution (No. 20-09) does not publish an EV-specific line item, so it is billed as a standalone service change or as part of the 8%-of-building-permit electrical fee.

Verified 2026-07-20 · Source

When you need this permit

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit — new construction or remodel (tied to building permit)Logan City Building Permit Fees — Resolution No. 20-09. Example: $1,050 building permit → $84 electrical permit.
8% of the Building Permit Fee
Electrical Service Change Permit (Residential — standalone)Logan City Building Permit Fees — Resolution No. 20-09
$50.00
State SurchargeLogan City Building Permit Fees — Resolution No. 20-09
1% of permit fee
Re-inspection FeeLogan City Building Permit Fees — Resolution No. 20-09
$50.00 per hour

Review timeline

Plan reviewTypical estimate — confirm current times with the Logan building department
~3–10 business days

How long did your Electrical Permit permit actually take in Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors

  3. 3

    Final

    All devices installed, GFCI/AFCI protection verified, panel labeled

See the full Logan inspection guide — scheduling & re-inspection fees →

Tips

  • All electrical work in Logan must comply with the 2023 NEC, adopted statewide by Utah Code § 15A-2-103(1)(g).
  • Utah allows homeowners to perform electrical work on their own primary residence, but a permit and all required inspections are still mandatory.
  • AFCI protection is required on all 15A and 20A bedroom circuits under the 2023 NEC.
  • GFCI protection is required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
  • Standalone service changes use the $50 flat fee; electrical work tied to a new construction or remodel building permit uses 8% of the building permit fee.
  • EV charger (EVSE) installation is not a separate permit category in Logan — it is filed as a standard electrical permit (standalone service change or new-circuit work) using this same fee structure.

Frequently asked questions

Yes. Logan requires an electrical permit for any new wiring, circuits, panel upgrades, or service changes. Minor repairs such as replacing a switch or outlet in kind typically do not require a permit — confirm with Logan at (435) 716-9030.

Per Logan City Building Permit Fees (Resolution No. 20-09): a standalone residential service change is $50. For electrical work tied to a new construction or remodel, the electrical permit is 8% of the building permit fee. A 1% state surcharge applies.

Plan review for an electrical permit in Logan typically runs 3–10 business days. This is an estimate, not a published figure — confirm current review times with Logan City Building & Safety Division at (435) 716-9030.

You'll need: Electrical, Plumbing, Mechanical Permit Application. Depending on your project, Logan may also ask for: Electrical Plan / Single-Line Diagram; Contractor License. See the required-documents checklist on this page for details on each.

Logan requires 3 inspection(s) for an electrical permit, in order: Rough-In, Service / Panel, Final. Schedule each through Logan City Building & Safety Division ((435) 716-9030).

Apply through Logan City Building & Safety Division at 290 N 100 W, Logan, UT 84321. Phone: (435) 716-9030, email: loganplanreview@loganutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.loganutah.org/government/departments/community_development/building_department/index.php.

Logan, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Logan's own 'Current Building Codes & Engineering Design Requirements' document is dated 'Effective July 2023' / 'Updated: 07/2023' and still lists the 2021 IBC — it has not been updated for the 7/1/2026 code cycle.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Logan's own (stale, July 2023) codes document also lists this edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. Logan's own codes document (July 2023) lists a '2020 National Electrical Code' — this was already stale before this fix and remains so; the statewide 2023 NEC governs.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition. NOTE: no IEBC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition. NOTE: no ISPSC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2017 ICC A117.1 (Accessibility) — Logan City 'Current Building Codes & Engineering Design Requirements' (dated Effective July 2023 / Updated 07/2023); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Logan's own codes document (loganutah.org/departments/comdev/building/Current%20Building%20Codes%202023.pdf) was fetched live and confirmed stale — dated 'Effective July 2023' / 'Updated: 07/2023', listing 2021 IBC/IRC/IMC/IPC/IFGC/IECC and a '2020 National Electrical Code' (itself outdated even relative to the pre-7/1/2026 baseline); it has not been revised for either the 2023 NEC correction or the 7/1/2026 code cycle.. Local amendments apply — see the Logan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.