Commercial Building Permit — Logan, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.loganutah.org/government/departments/community_development/building_department/fees.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Logan, Utah
Required for new commercial, industrial, and multi-family building construction in Logan. Per Resolution No. 20-09, 'Commercial and Residential Building Permit fees are based on the valuation of the permit' using the same valuation table as residential — but commercial plan review, at 65% of the Building Permit Fee, is charged instead of the 0.1% residential rate, and separate utility impact/connection fees apply. Verified directly against Logan's own 'Building Permit Fee Valuation Table' and a real issued permit example for a $16,500,000 new commercial project.
Verified 2026-07-19 · Source
When you need this permit
- New commercial, industrial, or multi-family building construction on a permitted, properly zoned lot
- Digital plans only — Logan City Building Department 'will only accept DIGITAL plans (except under special circumstances)'; submit application and plans to loganplanreview@loganutah.gov
- Complete architectural and structural drawings for plan review
- Fire Department plan review where the adopted IBC/IFC requires fire suppression or alarm systems
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footings / Foundation
Before concrete pour — forms, rebar, and anchor bolts per adopted IBC
- 2
Underground / Rough-In (Plumbing, Electrical, Mechanical)
Before backfill and before closing walls or ceilings — all underground and rough-in utilities
- 3
Framing
After framing, sheathing, and rough-in MEP — before insulation or wall cover
- 4
Fire Sprinkler / Fire Alarm
Required where the adopted IBC/IFC mandates fire suppression or alarm systems
- 5
Final
All work complete — Certificate of Occupancy issued upon passing final inspection
See the full Logan inspection guide — scheduling & re-inspection fees →
Tips
- Logan's Building Department accepts DIGITAL plans only (except under special circumstances) — submit applications and plans to loganplanreview@loganutah.gov to begin plan review.
- Commercial Building Permit fees use the identical valuation table as residential (Resolution No. 20-09) — the difference is plan review (65% commercial vs. 0.1% residential) and the added utility impact/connection fees.
- Utility impact and connection fees (water, sewer, wastewater treatment, Light & Power, transportation) are billed separately from the Building Permit and can be the largest cost on a new commercial project — on the real $16,500,000 example permit reviewed, impact/hookup fees alone totaled over $167,000, versus $76,355 for the Building Permit itself.
- Logan City has its own municipal electric utility (Logan City Light & Power) — new commercial construction pays an Impact Light & Power fee based on service size/phase, separate from Rocky Mountain Power territory rules.
- Call (435) 716-9030 or email loganplanreview@loganutah.gov to confirm current impact fee rates before budgeting, since the Impact Fee Schedule (Ordinance No. 25-01) is revised independently of the Building Permit Fee Resolution.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Logan.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Logan
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Logan project checklist
Describe your project once and get every permit, document, and fee it triggers in Logan — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →