Siding & Window Replacement Permit in Logan, Utah

Required for complete re-siding or window replacements that change opening sizes in Logan. Logan's fee schedule lists a specific flat fee for this permit type.

Verified 2026-06-30 · Source

When you need this permit

  • Complete re-siding of a structure or changing siding material type
  • Window or door replacement that changes the opening size (structural header change)
  • Adding new window or door openings

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Siding and/or Window Replacement PermitLogan City Building Permit Fees — Resolution No. 20-09
$50.00
State SurchargeLogan City Building Permit Fees — Resolution No. 20-09
1% of permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Logan building department
~3–7 business days

How long did your Siding & Window Replacement Permit permit actually take in Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Weather Barrier / Framing

    House wrap and any modified framing verified before siding installed

  2. 2

    Final

    Siding and windows complete, flashing and weatherproofing verified

See the full Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Like-for-like window replacements in the same rough opening typically do not require a permit in Logan — confirm with Logan at (435) 716-9030.
  • Changing from one siding material to another or changing window opening sizes requires the $50 permit.
  • Replacement windows must meet Utah energy code U-factor and SHGC requirements per the adopted IECC.

Frequently asked questions

Logan requires a siding & window replacement permit for: Complete re-siding of a structure or changing siding material type; Window or door replacement that changes the opening size (structural header change); Adding new window or door openings. If your project isn't listed, confirm with Logan City Building & Safety Division at (435) 716-9030 before starting work.

The siding and/or window replacement permit is a flat $50 per Logan City Building Permit Fees (Resolution No. 20-09), plus a 1% state surcharge.

Plan review for a siding & window replacement permit in Logan typically runs 3–7 business days. This is an estimate, not a published figure — confirm current review times with Logan City Building & Safety Division at (435) 716-9030.

You'll need: Residential Permit Application. Depending on your project, Logan may also ask for: Contractor License. See the required-documents checklist on this page for details on each.

Logan requires 2 inspection(s) for a siding & window replacement permit, in order: Weather Barrier / Framing, Final. Schedule each through Logan City Building & Safety Division ((435) 716-9030).

Apply through Logan City Building & Safety Division at 290 N 100 W, Logan, UT 84321. Phone: (435) 716-9030, email: loganplanreview@loganutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.loganutah.org/government/departments/community_development/building_department/index.php.

Logan, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Logan's own 'Current Building Codes & Engineering Design Requirements' document is dated 'Effective July 2023' / 'Updated: 07/2023' and still lists the 2021 IBC — it has not been updated for the 7/1/2026 code cycle.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Logan's own (stale, July 2023) codes document also lists this edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. Logan's own codes document (July 2023) lists a '2020 National Electrical Code' — this was already stale before this fix and remains so; the statewide 2023 NEC governs.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition. NOTE: no IEBC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition. NOTE: no ISPSC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2017 ICC A117.1 (Accessibility) — Logan City 'Current Building Codes & Engineering Design Requirements' (dated Effective July 2023 / Updated 07/2023); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Logan's own codes document (loganutah.org/departments/comdev/building/Current%20Building%20Codes%202023.pdf) was fetched live and confirmed stale — dated 'Effective July 2023' / 'Updated: 07/2023', listing 2021 IBC/IRC/IMC/IPC/IFGC/IECC and a '2020 National Electrical Code' (itself outdated even relative to the pre-7/1/2026 baseline); it has not been revised for either the 2023 NEC correction or the 7/1/2026 code cycle.. Local amendments apply — see the Logan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.