Fire protection and fire code enforcement in Logan is provided by the Logan City Fire Department (LCFD) Fire Prevention Bureau, not the Building Department. Automatic fire sprinkler system plan review and inspection is charged under City of Logan Resolution No. 23-14, 'A Resolution Adopting Fire Prevention Inspection Fees' (adopted by the Logan Municipal Council in 2023, in effect as of its passage date). Read directly from the resolution's own attached Fire Department Fee Schedule (fetched and read as a raw PDF on 2026-07-21, not summarized): the schedule gives only two combined project scenarios — 'New Construction/Tenant Improvements without fire sprinklers or fire alarm' ($75 general plan review + $75 final inspection = $150 total) and 'New Construction/Tenant Improvements with fire sprinklers and fire alarms' ($75 general plan review + $75 fire alarm plan review + $75 fire sprinkler plan review + $75 fire alarm rough-install inspection + $75 fire sprinkler rough-install inspection + $150 final inspection [24-hour test, 2 visits] = $525 total, rising to $675 if a kitchen hood suppression system is also involved). The schedule does not publish a stand-alone 'sprinkler only, no alarm' scenario — the itemized $75 Fire Sprinkler Plan Review and $75 Fire Sprinkler Rough-Install Inspection line items are confirmed as distinct charges within that combined schedule, and every project also incurs the shared $75 General Plan Review plus a $75-$150 Final Inspection charge regardless of which specific systems are involved. Plans for systems requiring third-party review must first go to an LCFD-approved private review firm before LCFD grants final approval, per LCFD's own Third-Party Fire Plan Review Services page (fetched directly, not the North Logan mirror).

Verified 2026-07-21 · Source

When you need this permit

  • New installation of an automatic fire sprinkler system on a property in Logan (new construction or tenant improvement)
  • Plan submittal to the Logan City Fire Department Fire Prevention Bureau (Fire Marshal Craig Humphreys, (435) 716-9515) before any work on the system begins, per LCFD's Automatic Fire Sprinkler Systems Information Packet (September 2023)
  • Plans requiring third-party review must first go to an LCFD-approved private review firm (Bureau Veritas North America Inc., RMC-F LLC, CBPE, SAFEbuilt LLC, Jensen Hughes, West Coast Code Consultants Inc., or Protection Consultants Inc.) before LCFD will grant final approval; an approved firm may not review a project developed by its own or an associated firm, per LCFD's Third-Party Fire Plan Review Services page
  • Water supply flow requirements must be verified per LCFD's linked Water Supply guidance before plan submittal
  • Hydrostatic, flush, and thrust block testing must be witnessed by an LCFD fire official before the final inspection can be scheduled

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

General Plan Review (project-wide, one per project)City of Logan Resolution No. 23-14, 'Fire Prevention Inspection Fees,' Fire Department Fee Schedule. Charged once per project regardless of which specific fire systems are involved; verified by direct read of the resolution's attached fee-schedule PDF on 2026-07-21.
$75.00
Fire Sprinkler Plan ReviewResolution No. 23-14, Fire Department Fee Schedule, 'New Construction/Tenant Improvements with fire sprinklers and fire alarms' line item — itemized separately from the Fire Alarm Plan Review fee.
$75.00
Fire Sprinkler Rough-Install InspectionResolution No. 23-14, Fire Department Fee Schedule, same combined line item.
$75.00
Final Inspection (24-hour test, 2 visits)Resolution No. 23-14, Fire Department Fee Schedule. This final-inspection charge is shared across the whole project, not billed separately per system.
$150.00 (combined project total; $75.00 if neither a sprinkler nor an alarm system is involved)
Kitchen Hood Suppression Add-On (if applicable)Resolution No. 23-14, Fire Department Fee Schedule — added only when a kitchen hood suppression system is also part of the project, bringing the combined sprinkler-and-alarm project total to $675.00.
$150.00 (1 plan review $75 + 1 final $75)

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler System Permit permit actually take in Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Hydrostatic, Flush, and Thrust Block Testing

    Must be witnessed by an LCFD fire official prior to scheduling the final inspection.

  2. 2

    Fire Sprinkler Rough-Install Inspection

    Performed after rough-in of the sprinkler system, before it is concealed.

  3. 3

    Final Inspection (24-hour test, 2 visits)

    Combined final fire-system inspection; shared with the fire alarm final inspection if both systems are present on the project.

See the full Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Logan City Fire Department (LCFD) — not the Building Department — handles fire sprinkler plan review through its Fire Prevention Bureau; contact Fire Marshal Craig Humphreys at (435) 716-9515.
  • Resolution No. 23-14's fee schedule only publishes combined totals for 'no fire systems' ($150) or 'sprinklers and alarms together' ($525, or $675 with a kitchen hood system) — it does not price a stand-alone 'sprinkler only' project, though the $75 sprinkler-specific plan review and rough-install line items are individually confirmed within that combined schedule.
  • LCFD requires certain sprinkler plans to go through a mandatory third-party peer review by an LCFD-approved firm before LCFD grants final approval — this firm's fee is separate from and in addition to LCFD's own Resolution No. 23-14 charges, and is not published by the city since each firm sets its own private rate.
  • Sprinkler hydrostatic, flush, and thrust block tests must be witnessed by an LCFD fire official before the final inspection can be scheduled — coordinate timing directly with the Fire Prevention Bureau.

Frequently asked questions

Logan requires a fire sprinkler system permit for: New installation of an automatic fire sprinkler system on a property in Logan (new construction or tenant improvement); Plan submittal to the Logan City Fire Department Fire Prevention Bureau (Fire Marshal Craig Humphreys, (435) 716-9515) before any work on the system begins, per LCFD's Automatic Fire Sprinkler Systems Information Packet (September 2023); Plans requiring third-party review must first go to an LCFD-approved private review firm (Bureau Veritas North America Inc., RMC-F LLC, CBPE, SAFEbuilt LLC, Jensen Hughes, West Coast Code Consultants Inc., or Protection Consultants Inc.) before LCFD will grant final approval; an approved firm may not review a project developed by its own or an associated firm, per LCFD's Third-Party Fire Plan Review Services page; Water supply flow requirements must be verified per LCFD's linked Water Supply guidance before plan submittal; Hydrostatic, flush, and thrust block testing must be witnessed by an LCFD fire official before the final inspection can be scheduled. If your project isn't listed, confirm with Logan City Building & Safety Division at (435) 716-9030 before starting work.

Per City of Logan Resolution No. 23-14, a project with both fire sprinklers and a fire alarm is charged $525 total ($75 general plan review + $75 fire alarm plan review + $75 fire sprinkler plan review + $75 fire alarm rough-install inspection + $75 fire sprinkler rough-install inspection + $150 final inspection). The resolution does not publish a separate 'sprinkler only' total, but the $75 Fire Sprinkler Plan Review and $75 Fire Sprinkler Rough-Install Inspection fees are individually confirmed line items. A mandatory third-party peer review (where required) is billed separately by the applicant's chosen approved firm.

Logan does not publish a plan-review timeline for this permit. Contact Logan City Building & Safety Division at (435) 716-9030 for current turnaround.

You'll need: Automatic Fire Sprinkler Systems Information Packet (September 2023); Building Permit Application (underlying project). Depending on your project, Logan may also ask for: Third-Party Fire Plan Review — Approved Firm Selection. See the required-documents checklist on this page for details on each.

Logan requires 3 inspection(s) for a fire sprinkler system permit, in order: Hydrostatic, Flush, and Thrust Block Testing, Fire Sprinkler Rough-Install Inspection, Final Inspection (24-hour test, 2 visits). Schedule each through Logan City Building & Safety Division ((435) 716-9030).

Apply through Logan City Building & Safety Division at 290 N 100 W, Logan, UT 84321. Phone: (435) 716-9030, email: loganplanreview@loganutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.loganutah.org/government/departments/community_development/building_department/index.php.

Logan, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Logan's own 'Current Building Codes & Engineering Design Requirements' document is dated 'Effective July 2023' / 'Updated: 07/2023' and still lists the 2021 IBC — it has not been updated for the 7/1/2026 code cycle.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Logan's own (stale, July 2023) codes document also lists this edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. Logan's own codes document (July 2023) lists a '2020 National Electrical Code' — this was already stale before this fix and remains so; the statewide 2023 NEC governs.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition. NOTE: no IEBC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition. NOTE: no ISPSC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2017 ICC A117.1 (Accessibility) — Logan City 'Current Building Codes & Engineering Design Requirements' (dated Effective July 2023 / Updated 07/2023); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Logan's own codes document (loganutah.org/departments/comdev/building/Current%20Building%20Codes%202023.pdf) was fetched live and confirmed stale — dated 'Effective July 2023' / 'Updated: 07/2023', listing 2021 IBC/IRC/IMC/IPC/IFGC/IECC and a '2020 National Electrical Code' (itself outdated even relative to the pre-7/1/2026 baseline); it has not been revised for either the 2023 NEC correction or the 7/1/2026 code cycle.. Local amendments apply — see the Logan overview page for the full list.

No. Fire sprinkler system plan review and inspection in Logan is handled by the Logan City Fire Department's Fire Prevention Bureau (Fire Marshal Craig Humphreys, (435) 716-9515), not the Building Department, though the fees are added to the project's building permit.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.