Basement Finish Permit in Logan, Utah

Required for finishing or remodeling an unfinished basement in Logan, including framing, electrical, plumbing, and mechanical work. Logan's website has a specific Residential Basement Finish Checklist.

Verified 2026-07-01 · Source

When you need this permit

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit (valuation-based)Assessed on project valuation per Logan City's published Building Permit Fee Resolution No. 20-09 (cited fee table) — same schedule as new residential construction.
Per Logan City fee table by project valuation — see Residential Building Permit fees above
Residential Plan Check FeeLogan City Building Permit Fees — Resolution No. 20-09
0.1% of construction valuation; minimum $15.00
Electrical PermitLogan City Building Permit Fees — Resolution No. 20-09
8% of the Building Permit Fee
Plumbing Permit (if applicable)Logan City Building Permit Fees — Resolution No. 20-09
8% of the Building Permit Fee
Mechanical Permit (if applicable)Logan City Building Permit Fees — Resolution No. 20-09
8% of the Building Permit Fee
State SurchargeLogan City Building Permit Fees — Resolution No. 20-09
1% of building permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Logan building department
~7–14 business days

How long did your Basement Finish Permit permit actually take in Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing

    Wall framing, fire blocking, egress window openings verified

  2. 2

    Rough 4-Way

    Electrical, plumbing, and HVAC rough-ins before walls closed

  3. 3

    Final

    Drywall, fixtures, smoke/CO detectors, and all finishes complete

See the full Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Logan provides a specific Residential Basement Finish Checklist on the forms/documents page — download it before submitting.
  • Every basement bedroom in Logan requires an egress window — IRC minimum 5.7 sq ft opening, sill no higher than 44 inches.
  • Smoke detectors are required in every bedroom, outside sleeping areas, and on every level per the adopted IRC.
  • The furnace/water heater room needs combustion air — do not fully enclose it without an air supply.

Frequently asked questions

Yes. Logan requires a building permit for basement finishes that include framing, electrical, plumbing, or mechanical work. The fee is valuation-based per Logan City Building Permit Fees (Resolution No. 20-09). Download Logan's Residential Basement Finish Checklist from the building department forms page.

In Logan, the published Building Permit (valuation-based) is: Per Logan City fee table by project valuation — see Residential Building Permit fees above. Additional published fees: Residential Plan Check Fee — 0.1% of construction valuation; minimum $15.00; Electrical Permit — 8% of the Building Permit Fee; Plumbing Permit (if applicable) — 8% of the Building Permit Fee; Mechanical Permit (if applicable) — 8% of the Building Permit Fee; State Surcharge — 1% of building permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a basement finish permit in Logan typically runs 7–14 business days. This is an estimate, not a published figure — confirm current review times with Logan City Building & Safety Division at (435) 716-9030.

You'll need: Application for Residential Permit; Floor Plan; Electrical Plan. Depending on your project, Logan may also ask for: Plumbing Plan. See the required-documents checklist on this page for details on each.

Logan requires 3 inspection(s) for a basement finish permit, in order: Framing, Rough 4-Way, Final. Schedule each through Logan City Building & Safety Division ((435) 716-9030).

Apply through Logan City Building & Safety Division at 290 N 100 W, Logan, UT 84321. Phone: (435) 716-9030, email: loganplanreview@loganutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.loganutah.org/government/departments/community_development/building_department/index.php.

Logan, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Logan's own 'Current Building Codes & Engineering Design Requirements' document is dated 'Effective July 2023' / 'Updated: 07/2023' and still lists the 2021 IBC — it has not been updated for the 7/1/2026 code cycle.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Logan's own (stale, July 2023) codes document also lists this edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. Logan's own codes document (July 2023) lists a '2020 National Electrical Code' — this was already stale before this fix and remains so; the statewide 2023 NEC governs.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition. NOTE: no IEBC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition. NOTE: no ISPSC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2017 ICC A117.1 (Accessibility) — Logan City 'Current Building Codes & Engineering Design Requirements' (dated Effective July 2023 / Updated 07/2023); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Logan's own codes document (loganutah.org/departments/comdev/building/Current%20Building%20Codes%202023.pdf) was fetched live and confirmed stale — dated 'Effective July 2023' / 'Updated: 07/2023', listing 2021 IBC/IRC/IMC/IPC/IFGC/IECC and a '2020 National Electrical Code' (itself outdated even relative to the pre-7/1/2026 baseline); it has not been revised for either the 2023 NEC correction or the 7/1/2026 code cycle.. Local amendments apply — see the Logan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.