Residential Building Permit in Logan, Utah

Required for new residential construction, additions, structural alterations, and work requiring plan review under Logan Municipal Code Title 15 and the adopted 2024 IBC / 2021 IRC.

Verified 2026-06-30 · Source

When you need this permit

  • New single-family or multi-family residential construction
  • Additions or structural modifications (load-bearing wall removal, foundation work)
  • Conversion of non-habitable space to habitable space
  • Any work requiring plan review under Logan Municipal Code Title 15

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit — valuation $1.00–$500.00Logan City Building Permit Fees — Resolution No. 20-09
$50.00
Building Permit — valuation $501.00–$2,000.00Logan City Building Permit Fees — Resolution No. 20-09
$50.00 for the first $500, plus $4.00 for each additional $100 or fraction thereof, to and including $2,000
Building Permit — valuation $2,001.00–$25,000.00Logan City Building Permit Fees — Resolution No. 20-09
$110.00 for the first $2,000, plus $15.00 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit — valuation $25,001.00–$50,000.00Logan City Building Permit Fees — Resolution No. 20-09
$455.00 for the first $25,000, plus $11.00 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit — valuation $50,001.00–$100,000.00Logan City Building Permit Fees — Resolution No. 20-09
$730.00 for the first $50,000, plus $8.00 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit — valuation $100,001.00–$500,000.00Logan City Building Permit Fees — Resolution No. 20-09
$1,130.00 for the first $100,000, plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit — valuation $500,001.00–$1,000,000.00Logan City Building Permit Fees — Resolution No. 20-09
$3,730.00 for the first $500,000, plus $5.75 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit — valuation over $1,000,000.00Logan City Building Permit Fees — Resolution No. 20-09
$6,605.00 for the first $1,000,000, plus $4.50 for each additional $1,000 or fraction thereof
Residential Plan Check FeeLogan City Building Permit Fees — Resolution No. 20-09. Example: $100,000 valuation → $100.00 plan check.
0.1% of construction valuation (valuation × 0.001); minimum $15.00
Electrical Permit (new construction / remodel)Logan City Building Permit Fees — Resolution No. 20-09. Example: $1,050 building permit → $84 electrical.
8% of the Building Permit Fee
Mechanical Permit (new construction / remodel)Logan City Building Permit Fees — Resolution No. 20-09
8% of the Building Permit Fee
Plumbing Permit (new construction / remodel)Logan City Building Permit Fees — Resolution No. 20-09
8% of the Building Permit Fee
State SurchargeLogan City Building Permit Fees — Resolution No. 20-09
1% of the Building Permit Fee
Re-inspection / After-Hours InspectionLogan City Building Permit Fees — Resolution No. 20-09
$50.00 per hour; minimum 2-hour charge for after-hours

Review timeline

Plan reviewTypical estimate — confirm current times with the Logan building department
~10–21 business days

How long did your Residential Building Permit permit actually take in Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Before concrete pour — forms, rebar, and anchor bolts

  2. 2

    Foundation

    Foundation walls and waterproofing before backfill

  3. 3

    Below-Grade Plumbing / Mechanical

    Underground pipes and connections before concrete pour

  4. 4

    Shear Wall

    Shear panels and hold-downs before sheathing covered

  5. 5

    Rough 4-Way

    Interior framing, weather barrier, power-to-panel connection, mechanical rough, plumbing rough, electrical rough, and gas line pressure test — all at once before walls closed

  6. 6

    Final

    All work complete — certificate of occupancy issued upon passing

See the full Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Logan requires 24-hour notice for ALL inspections; inspection appointments are available Monday–Friday, 9:00–11:00 AM and 1:30–3:30 PM. Call (435) 716-9030.
  • Logan's 4-way rough inspection combines framing, electrical, mechanical, and plumbing — all trades must be roughed in and ready at the same time.
  • Project value must include total cost of construction, labor, and materials — this is the basis for the permit fee calculation.
  • Engineering design requirements: ground snow load 43 lbs/sq ft (elevation-adjusted; see utahsnowload.usu.edu), frost depth 30 inches residential / 36 inches commercial, wind 104 mph Exposure C, seismic zone D1.
  • Work in the Logan City Right of Way (driveway approaches, curb/gutter, sidewalk) requires a separate WROW Permit from the Public Works Department.

Frequently asked questions

Logan requires a residential building permit for: New single-family or multi-family residential construction; Additions or structural modifications (load-bearing wall removal, foundation work); Conversion of non-habitable space to habitable space; Any work requiring plan review under Logan Municipal Code Title 15. If your project isn't listed, confirm with Logan City Building & Safety Division at (435) 716-9030 before starting work.

Logan City building permit fees are valuation-based per Resolution No. 20-09: $50 minimum (up to $500 valuation); $110 + $15/thousand from $2,001–$25,000; $455 + $11/thousand from $25,001–$50,000; $730 + $8/thousand from $50,001–$100,000; $1,130 + $6.50/thousand from $100,001–$500,000; $3,730 + $5.75/thousand from $500,001–$1,000,000; $6,605 + $4.50/thousand above $1,000,000. Residential plan check is 0.1% of valuation ($15 min). Electrical, mechanical, and plumbing permits are each 8% of the building permit fee. State surcharge of 1% applies.

Logan does not publish a fixed plan-review turnaround. Residential review typically runs 2–4 weeks depending on project scope and department workload — call (435) 716-9030 to get current wait times.

You'll need: Application for Residential Permit; Construction Plans; Energy Code Compliance Documentation. Depending on your project, Logan may also ask for: Engineered Truss Plans. See the required-documents checklist on this page for details on each.

Logan requires 6 inspection(s) for a residential building permit, in order: Footings, Foundation, Below-Grade Plumbing / Mechanical, Shear Wall, Rough 4-Way, Final. Schedule each through Logan City Building & Safety Division ((435) 716-9030).

Apply through Logan City Building & Safety Division at 290 N 100 W, Logan, UT 84321. Phone: (435) 716-9030, email: loganplanreview@loganutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.loganutah.org/government/departments/community_development/building_department/index.php.

Logan, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition. NOTE (verified 2026-07-16): Logan's own 'Current Building Codes & Engineering Design Requirements' document is dated 'Effective July 2023' / 'Updated: 07/2023' and still lists the 2021 IBC — it has not been updated for the 7/1/2026 code cycle.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Logan's own (stale, July 2023) codes document also lists this edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle. Logan's own codes document (July 2023) lists a '2020 National Electrical Code' — this was already stale before this fix and remains so; the statewide 2023 NEC governs.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition. NOTE: no IEBC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition. NOTE: no ISPSC line previously existed in this file's codesAdopted entry or in Logan's own codes document; added here directly from the statute for completeness.; 2017 ICC A117.1 (Accessibility) — Logan City 'Current Building Codes & Engineering Design Requirements' (dated Effective July 2023 / Updated 07/2023); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov. Logan's own codes document (loganutah.org/departments/comdev/building/Current%20Building%20Codes%202023.pdf) was fetched live and confirmed stale — dated 'Effective July 2023' / 'Updated: 07/2023', listing 2021 IBC/IRC/IMC/IPC/IFGC/IECC and a '2020 National Electrical Code' (itself outdated even relative to the pre-7/1/2026 baseline); it has not been revised for either the 2023 NEC correction or the 7/1/2026 code cycle.. Local amendments apply — see the Logan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.