Department contacts, adopted codes, permit types, fees, and gotchas for Enoch City, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
900 East Midvalley Road, Enoch, UT 84721
Phone
(435) 586-1119
Office hours
Monday–Thursday 9:00 AM – 4:30 PM, Friday 9:00 AM – 1:00 PM, per enochcityut.gov footer contact block and the city's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015).

Inspection guide

See how inspections work in Enoch City — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • Uniform Building Code (UBC) valuation table — Enoch City's own Fee Schedule (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A) states: 'Building permit fees are set by the Uniform Building Code.' This is the same 1997 UBC Table 1-A valuation-fee structure referenced by other small Utah cities in this corpus (e.g. Provo); Enoch's own published fee-schedule language uses 'Uniform Building Code' rather than citing a specific IBC/IRC edition year.
  • Statewide baseline per Utah Code § 15A-2-103: Utah's currently adopted statewide construction codes — the 2024 IBC (incl. Appendices C and J), 2024 IPC, 2024 IMC, 2024 IFGC, 2024 IECC, and 2024 IEBC (all in force since July 1, 2026, superseding the 2021 editions), alongside the unchanged 2021 IRC and 2023 NEC — apply to Enoch City by default absent a documented independent city-level code-adoption ordinance; Enoch City's own website does not publish a distinct 'Current Adopted Codes' page listing specific ICC edition years (unlike Cedar City's dedicated codes page), so the state baseline is reported here rather than invented city-specific edition years.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
10units

10 buildings · $2.8M valuation

Trailing 12 months
137units

12 of 12 months reported · #45 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
58units

55 buildings · $13.7M valuation

5 month(s) reported to Census

Full year 2025
135units

135 buildings · $34.7M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Enoch City is a genuinely independent municipal jurisdiction, separate from both Cedar City and unincorporated Iron County — it has its own Building Department (900 East Midvalley Road, Enoch, UT 84721; (435) 586-1119; inspector@enochcity.org), its own CiviclinQ-hosted fee schedule and ordinances, and its own CityInspect permit portal instance (enoch.cityinspect.com), though builders can also use a shared Iron County-wide CityInspect registration link (utah.cityinspect.com).
  • Enoch's Building Department office hours are Monday–Thursday 9:00 AM–4:30 PM and Friday 9:00 AM–1:00 PM.
  • Enoch's base building permit fee follows the Uniform Building Code valuation table plus a 1% Utah state surcharge (Fee Schedule § 4.A); the actual per-square-foot UBC valuation table itself is not separately republished on the city's own fee-schedule page.
  • Plan review is billed separately from the base building permit fee and is contracted to a third-party reviewer; per December 2023 City Council minutes, this fee cannot be waived by the city even when the underlying building permit fee is waived. Plan review is tiered by project type: garages/carports 10%, remodels/additions 20%, new homes under 2,000 sq ft 30%, 2,000–3,000 sq ft 35%, over 3,000 sq ft 40% — all as a percentage of the building permit fee (Fee Schedule § 4.B).
  • Structures under 200 square feet do not require a building permit in Enoch City (Fee Schedule § 4.A).
  • Enoch City requires a Utah Prairie Dog Clearance evaluation for new construction, the same Iron County-wide regional requirement documented for Cedar City in this corpus, since Enoch sits within mapped Utah prairie dog habitat.
  • A $250 utility deposit is collected alongside building permit and impact fees; it converts to a credit (owner-builder) or is refunded once a Certificate of Occupancy issues and the account is closed.
  • Impact fees are substantial and scale sharply with water-meter size: a 1-inch residential meter/ERU is $4,359.00 versus $156,914.44 for a 6-inch meter (Fee Schedule § 6.A, effective dates ranging 2017–2025); the Transportation impact fee for a new single-family detached home is a flat $2,000 per unit effective April 2024.
  • No jurisdiction-published plan-review turnaround time (in business/calendar days) was located anywhere in Enoch City's official sources as of 2026-07-08 (fee schedule, building department page, permit packets, or FY2025-26 tentative budget). The residential-building-permit entry applies the Utah Code § 10-20-909 statutory floor (17 business days total: 3-day completeness screening + 14-day plan review) since that statute is scoped specifically to one- and two-family dwelling/townhome construction; all other permit types (additions/remodels, solar) remain honestly null with a note rather than estimated, since the statute does not extend to them.

Comparable nearby cities

Cedar City
Both in Iron County10 shared permit types~6 mi away
Compare fees →
Unincorporated Iron County
Both in Iron County7 shared permit types
Compare fees →
La Verkin
9 shared permit types~39 mi away
Compare fees →