Skip to main content
PermitBase

Version history — Enoch City, Utah

This is PermitBase’s own verified record for Enoch City, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Enoch City’s actual law was at that time.

Permanent link to today’s record

/utah/iron-county/enoch-city/as-of/2026-08-21/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-21Current record
    • Enoch City, Utah — Residential Building Permit fee record updated: Water 1-inch meter/ERU $4,359.00 (2018); Wastewater 1.5-inch meter $9,807.15 (12-17-19); Storm Water Drainage single-family residential/ERU $1,353.91 (7-18-23); Transportation — Residential Single Family Detached, per-unit approved impact fee $2,000 (effective 4-2-24); Police Residential/ERU $738.38 (11-13-17); Park — single-family residential/ERU fee schedule maintained separately ('See Below' in the source table, tied to the Recreation IFFP/IFA update dated 10-06-2025). → Water 1-inch meter/ERU $6,500.00 (effective 1-21-26); Wastewater Residential/ERU $3,196.37, Nonresidential $4,794.56 (both effective 1-21-26); Transportation — Residential Single Family Detached, per-unit approved impact fee $2,000 (effective 4-2-24); Police — Single Family residential/ERU $1,353.91 (effective 7-18-23), Multi-Family residential $1,353.91 (effective 11-18-25), Commercial $0.70 per sq ft (effective 11-18-25); Park — Single Family residential/ERU $1,250.00 (effective 5-30-23); Storm Water Drainage — set by zoning district per the schedule effective 1-14-25 (e.g., Residential 11 (R-1-11) $3,560, Rural Residential (R-R-1/R-R-5) $2,670, up to Regional Commercial (R-C) $8,010 per ERU).
  • 2026-08-20Superseded
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Enoch City, Utah — EV Charger / EVSE Permit record added
  • 2026-07-19Superseded
  • 2026-07-16Superseded
  • 2026-07-08Initial record — coverage of Enoch City began