Skip to main content
PermitBase

This is PermitBase’s published record for Enoch City as of 2026-07-08. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Enoch City building permits

Verified

Enoch City, Utah — as published 2026-07-08.

Verified 2026-07-08 · Source

Codes adopted

Uniform Building Code (UBC) valuation table — Enoch City's own Fee Schedule (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A) states: 'Building permit fees are set by the Uniform Building Code.' This is the same 1997 UBC Table 1-A valuation-fee structure referenced by other small Utah cities in this corpus (e.g. Provo); Enoch's own published fee-schedule language uses 'Uniform Building Code' rather than citing a specific IBC/IRC edition year.Statewide baseline per Utah Code § 15A-2-103: Utah's currently adopted statewide construction codes (2021 IBC/IRC/IPC/IMC/IECC family plus 2023 NEC, per the Utah Uniform Building Code Commission) apply to Enoch City by default absent a documented independent city-level code-adoption ordinance; Enoch City's own website does not publish a distinct 'Current Adopted Codes' page listing specific ICC edition years (unlike Cedar City's dedicated codes page), so the state baseline is reported here rather than invented city-specific edition years.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family residential construction in Enoch City. The base building permit fee is set by the Uniform Building Code valuation table plus a 1% Utah state surcharge; a separate plan-review fee (a percentage of the building permit fee, scaled by home size) is charged by the city's contracted third-party plan reviewer and cannot be waived.

Verified 2026-07-08 · Source

Requirements

  • New single-family residential construction
  • 1 set of construction plans in PDF format submitted to inspector@enochcity.org
  • Completed Building Permit Application
  • Utah Prairie Dog Clearance letter/evaluation form
  • Geotechnical Data Worksheet from a licensed engineer
  • Verification with the City Office regarding water rights for the property
  • Verification with the City Office for zoning and subdivision requirements
  • Home Energy Compliance Worksheet
  • Owner/Builder Certification, signed and notarized, if applicable
  • Dumpster and sanitary facilities on-site per Ordinance 2006-01-18-A

Required documents

  • RequiredNew Building Permit Packet (Residential)Enoch City's official packet (rev. 1-21-2025) bundling the checklist, Builder Inspection Checklist, Ordinance 2006-01-18-A, Water Meter/Connection/Deposit Info, Utah Prairie Dog Clearance materials, Home Energy Compliance Worksheet, Gas Clearance Form, Owner/Builder Certification, and Building Permit Application.
  • RequiredBuilding Permit ApplicationEnoch City's official application form capturing job address, zoning, owner/contractor information, construction type (RSF/RMF/COM/DGAR/Other), setbacks, square footage by floor, and plot plan/conditional use/elevation/endangered-species sign-offs.
  • RequiredUtah Prairie Dog Clearance Area Evaluation and AcknowledgementRequired recognition-statement form determining whether the project parcel falls within the mapped Utah prairie dog clearance area under the Range-Wide General Conservation Plan (dated April 3, 2018); submitted to the Utah Division of Wildlife Resources.
  • RequiredGeotechnical Data WorksheetPrepared by a licensed engineer, required per the city's official New Building Permit Packet.
  • RequiredHome Energy Compliance WorksheetCity-published worksheet covering thermal envelope insulation R-values/U-values, energy compliance method (RESCheck, Prescriptive, or Performance), furnace/water heater types, and vented/unvented attic and crawl space specifications.
  • OptionalOwner/Builder Certification and Agreement to Comply with the Construction Trades Licensing ActUtah DOPL form required when the owner is acting as their own general contractor; filed with the Building Department, which forwards it to DOPL (dopltech@utah.gov).

Fee schedule

Fee typeAmountNotes
Building Permit Fee (base, UBC valuation table)Set by the Uniform Building Code valuation table, plus a 1% State of Utah surcharge on the total building permit fee.Enoch City Fee Schedule, Section 4.A 'Permit' (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A): 'Building permit fees are set by the Uniform Building Code. There is a one percent (1%) State of Utah surcharge added to the total building permit fee.' No structures under 200 square feet require a permit, per the same section. The specific UBC valuation-per-square-foot table itself is not separately republished on Enoch's fee-schedule page; the city fee schedule states only that the UBC table governs, consistent with how several other small Utah cities in this corpus reference the standard valuation table rather than reprinting it.
Plan Review Fee — New homes under 2,000 sq ft30% of building permit feeEnoch City Fee Schedule, Section 4.B 'Plan Review' (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.B).
Plan Review Fee — New homes 2,000–3,000 sq ft35% of building permit feeEnoch City Fee Schedule, Section 4.B 'Plan Review'.
Plan Review Fee — New homes over 3,000 sq ft40% of building permit feeEnoch City Fee Schedule, Section 4.B 'Plan Review'.
Resubmission of expired/closed building permit50% of original building permit feeEnoch City Fee Schedule, Section 4.B 'Plan Review'.
Substantially Identical Plans (plan review)50% of the original plan review feeEnoch City Fee Schedule, Section 4.B 'Plan Review'.
Utility Deposit$250.00Collected along with the building permit and impact fees, per Enoch City's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015); refunded (or credited for owner-builders after a year of on-time payments) once the Certificate of Occupancy is issued and the utility account is closed.
Impact Fees (collected at building permit issuance)Water 1-inch meter/ERU $4,359.00 (2018); Wastewater 1.5-inch meter $9,807.15 (12-17-19); Storm Water Drainage single-family residential/ERU $1,353.91 (7-18-23); Transportation — Residential Single Family Detached, per-unit approved impact fee $2,000 (effective 4-2-24); Police Residential/ERU $738.38 (11-13-17); Park — single-family residential/ERU fee schedule maintained separately ('See Below' in the source table, tied to the Recreation IFFP/IFA update dated 10-06-2025).Enoch City Fee Schedule, Section 6.A 'Impact Fees' (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/6.A), captured via the Utah Public Notice Website archival copy at utah.gov/pmn/files/1429637.pdf. Meter-size tiers above 1-inch (1.5-inch, 2-inch, 3-inch, 4-inch, 6-inch) carry progressively higher Water/Wastewater impact fees up to $156,914.44 for a 6-inch meter — see source for the full table.

Residential Addition / Remodel / Garage Permit

Verified

Required for additions, remodels, and garage/carport construction on existing residential structures in Enoch City. Uses the same UBC-valuation base fee as new construction, but with a lower plan-review percentage tier than new home construction.

Verified 2026-07-08 · Source

Requirements

  • Additions to existing residential structures
  • Remodel work regulated by the applicable building code
  • Garage or carport construction
  • 1 set of construction plans in PDF format submitted to inspector@enochcity.org
  • Completed Building Permit Application
  • Asbestos Inspection Certification for buildings constructed before 1980
  • Geotechnical Data Worksheet from a licensed engineer
  • Home Energy Compliance Worksheet, if applicable
  • Owner/Builder Certification, signed and notarized, if applicable

Required documents

  • RequiredAdditions/Remodels/Etc. Building Permit Packet ("Other" Building Permit)Enoch City's official packet (other_bp_packet_final_8-27-2020.pdf) for additions, remodels, and similar work, bundling the checklist, Builder Inspection Checklist, and Ordinance 2006-01-18-A.
  • RequiredBuilding Permit ApplicationSame city-wide application form used for all building permit types.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (base, UBC valuation table)Set by the Uniform Building Code valuation table, plus a 1% State of Utah surcharge.Enoch City Fee Schedule, Section 4.A 'Permit' — the same base-fee mechanism applies to all building permit types; only the plan-review percentage in Section 4.B differs by project type.
Plan Review Fee — Garages and carports10% of building permit feeEnoch City Fee Schedule, Section 4.B 'Plan Review'.
Plan Review Fee — Remodeling and additions20% of building permit feeEnoch City Fee Schedule, Section 4.B 'Plan Review'.

Solar Panel (PV) Permit

Required for residential rooftop solar photovoltaic installations in Enoch City, using the city's dedicated Solar Permit packet.

Reviewed 2026-07-08 · Source

Requirements

  • Completed Solar Permit application package
  • Site plan and system specifications per the Solar Permit packet

Required documents

  • RequiredSolar Permit PacketEnoch City's official solar permit packet (solar_permit_packet_9-12-2022.pdf).

Fee schedule

Fee typeAmountNotes

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Enoch City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/iron-county/enoch-city/as-of/2026-07-08/

Snapshot date: 2026-07-08

Commit: c85f226

Reproducible from PermitBase’s version-controlled dataset, commit c85f226.