Skip to main content
PermitBase

Fire Sprinkler System Permit in Enoch City, Utah

Enoch City does not publish a standalone Fire Sprinkler permit, application, or fee. Fire protection is contracted to the Cedar City Fire Department: per Enoch City's own Fire Department page (enochcityut.gov/fire-department.html), 'Enoch City contracts with Cedar City Fire Department for fire protection and Wildland Fire Interface Management.' As re-checked live on 2026-07-21, that page publishes no fire-sprinkler-specific permit, fee, or inspection content — the only permit it describes is a free Open Burn Permit. Enoch's own city-wide Building Permit Application form (used for Residential, Commercial, and 'Other' permits alike) instead captures fire sprinkler information as a data field within the standard application rather than through a separate permit: the application's cover page asks 'Fire Sprinkler System?: Yes___ No___,' and its Code Analysis section includes a 'Sprinkler System' field alongside Building Height, Occupant Load, Fire Extinguishers, and Fire Hydrants. A full-text search of Enoch's entire Code of Revised Ordinances (all 18 chapters) for the term 'sprinkler' returned zero results, and no distinct fire-sprinkler fee line exists anywhere in the city's 9-chapter Fee Schedule (Chapters 1 through 9 reviewed in full). Cedar City's own Consolidated Fee Schedule — the fire department Enoch actually contracts with — likewise publishes no distinct fire sprinkler fee line, per this corpus's Cedar City jurisdiction entry (last verified 2026-07-21).

Verified 2026-07-21 · Source

When you need this permit

  • Fire sprinkler system installation, alteration, or extension in new or existing buildings within Enoch City
  • No standalone fire sprinkler permit exists; disclosed via the 'Fire Sprinkler System? Yes/No' field on the city-wide Building Permit Application, and via the 'Sprinkler System' field under that application's Code Analysis section
  • Submitted as part of whichever base Building Permit (Residential, Commercial, or 'Other') governs the project, not a separate application
  • Fire protection and any fire-related plan input is provided under Enoch's fire-service contract with the Cedar City Fire Department, not a distinct Enoch Fire Department
  • Statewide 2024 International Fire Code (IFC) baseline applies per Utah Code Section 15A-2-103 absent a documented independent Enoch City fire-code adoption page

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Uniform Building Code valuation table)Fire sprinkler system work is priced under the same Uniform Building Code valuation-based Building Permit Fee plus 1% State of Utah surcharge as any other building permit work (Fee Schedule Section 4.A) — no distinct fire sprinkler fee line exists. Confirmed by a full review of Fee Schedule Chapters 1 through 9 (2026-07-21) and by a zero-result full-text search of the Code of Revised Ordinances for 'sprinkler.'
Valuation-based; no static dollar figure published

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler System Permit permit actually take in Enoch City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Sprinkler Inspection

    Not separately named in Enoch City's Builder Inspection Checklist; sprinkler rough-in and testing is folded into the '4-Way (Rough Electrical, Plumbing, Mechanical, Framing, Gas)' combined rough-in inspection and/or Final Inspection documented on the Residential and Commercial Building Permit entries in this file.

See the full Enoch City inspection guide — scheduling & re-inspection fees →

Tips

  • Enoch City has no independent fire department for plan review or inspection purposes — fire protection is contracted to the Cedar City Fire Department for both fire protection and Wildland Fire Interface Management, per enochcityut.gov/fire-department.html.
  • Disclose a fire sprinkler system by checking 'Yes' on the Building Permit Application's cover page and completing the 'Sprinkler System' field under Code Analysis — there is no separate sprinkler permit form to file.
  • Confirm sprinkler-related requirements directly with the Building Department, (435) 586-1119, since neither Enoch's nor Cedar City's fee schedule publishes a distinct sprinkler fee line to budget against.

Frequently asked questions

Enoch City requires a fire sprinkler system permit for: Fire sprinkler system installation, alteration, or extension in new or existing buildings within Enoch City; No standalone fire sprinkler permit exists; disclosed via the 'Fire Sprinkler System? Yes/No' field on the city-wide Building Permit Application, and via the 'Sprinkler System' field under that application's Code Analysis section; Submitted as part of whichever base Building Permit (Residential, Commercial, or 'Other') governs the project, not a separate application; Fire protection and any fire-related plan input is provided under Enoch's fire-service contract with the Cedar City Fire Department, not a distinct Enoch Fire Department; Statewide 2024 International Fire Code (IFC) baseline applies per Utah Code Section 15A-2-103 absent a documented independent Enoch City fire-code adoption page. If your project isn't listed, confirm with Enoch City Building Department (Community Development) at (435) 586-1119 before starting work.

In Enoch City, the published Building Permit Fee (Uniform Building Code valuation table) is: Valuation-based; no static dollar figure published. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Enoch City does not publish a plan-review timeline for this permit. Contact Enoch City Building Department (Community Development) at (435) 586-1119 for current turnaround.

You'll need: Building Permit Application; Fire Sprinkler Plans/Shop Drawings. See the required-documents checklist on this page for details on each.

Enoch City requires 1 inspection(s) for a fire sprinkler system permit, in order: Fire Sprinkler Inspection. Schedule each through Enoch City Building Department (Community Development) ((435) 586-1119).

Apply through Enoch City Building Department (Community Development) at 900 East Midvalley Road, Enoch, UT 84721. Phone: (435) 586-1119, email: inspector@enochcity.org. Office hours: Monday–Thursday 9:00 AM – 4:30 PM, Friday 9:00 AM – 1:00 PM, per enochcityut.gov footer contact block and the city's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015).. Official information: https://www.enochcityut.gov/building-department.html.

Enoch City, Utah has adopted: Uniform Building Code (UBC) valuation table — Enoch City's own Fee Schedule (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A) states: 'Building permit fees are set by the Uniform Building Code.' This is the same 1997 UBC Table 1-A valuation-fee structure referenced by other small Utah cities in this corpus (e.g. Provo); Enoch's own published fee-schedule language uses 'Uniform Building Code' rather than citing a specific IBC/IRC edition year.; Statewide baseline per Utah Code § 15A-2-103: Utah's currently adopted statewide construction codes — the 2024 IBC (incl. Appendices C and J), 2024 IPC, 2024 IMC, 2024 IFGC, 2024 IECC, and 2024 IEBC (all in force since July 1, 2026, superseding the 2021 editions), alongside the unchanged 2021 IRC and 2023 NEC — apply to Enoch City by default absent a documented independent city-level code-adoption ordinance; Enoch City's own website does not publish a distinct 'Current Adopted Codes' page listing specific ICC edition years (unlike Cedar City's dedicated codes page), so the state baseline is reported here rather than invented city-specific edition years.. Local amendments apply — see the Enoch City overview page for the full list.

No. Enoch City has no standalone fire sprinkler permit, application, or fee. Fire sprinkler systems are disclosed on the city-wide Building Permit Application (a 'Fire Sprinkler System? Yes/No' field on the cover page, and a 'Sprinkler System' field under Code Analysis) and priced under the same Uniform Building Code valuation-based Building Permit Fee as the rest of the project. Fire protection itself is contracted to the Cedar City Fire Department, whose own fee schedule likewise has no distinct sprinkler fee.