Skip to main content
PermitBase

Commercial Tenant Improvement / Tenant Finish Permit in Enoch City, Utah

Required for tenant improvement and remodel work inside an existing commercial building in Enoch City. Enoch City does not publish a dedicated tenant-improvement packet or fee line distinct from its Commercial Building Permit Packet and general 'Other' (additions/remodels) permit process — the same base UBC-valuation fee mechanism applies, and site-plan/zoning sign-off requirements are reduced or waived for interior-only work at the Building Department's discretion.

Reviewed 2026-08-02 · Source

When you need this permit

  • Tenant improvement or remodel work within an existing commercial building
  • One digital set of plans (PDF) covering the affected scope: architectural, mechanical, plumbing, and electrical as applicable
  • Signed energy code compliance documentation, if the scope affects the building's energy envelope or systems
  • Complete building permit application form

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee (base, UBC valuation table)Enoch City Fee Schedule, Section 4.A 'Permit' — the same base-fee mechanism applies to all building permit types, including commercial tenant improvement; no distinct tenant-improvement valuation table is published.
Set by the Uniform Building Code valuation table, plus a 1% State of Utah surcharge.
Plan Review Fee
Enoch City Fee Schedule, Section 4.B 'Plan Review' lists exactly seven line items — garage/carport (10%), remodel/addition (20%), new-home-by-size (30–40%), Special Inspections ($50), resubmission of… Show full citationEnoch City Fee Schedule, Section 4.B 'Plan Review' lists exactly seven line items — garage/carport (10%), remodel/addition (20%), new-home-by-size (30–40%), Special Inspections ($50), resubmission of expired permit (50%), and substantially identical plans (50%) — none labeled commercial or tenant-improvement. Chapter 4 'Building Permit' contains only Sections 4.A and 4.B (no 4.C exists). Enoch City Council Resolution No. 2024-11-20 (utah.gov/pmn/files/1197349.pdf), the legislative record that adopted the current 4.B table, reproduces the identical seven line items verbatim — the absence of a commercial/TI tier is a confirmed legislative fact. Omitted rather than assumed to match any of these residential-labeled tiers; this unresolved fee gap is why this entry's confidence remains 'partial.'
Not published for tenant improvement as a distinct percentage tier

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Enoch City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical / Plumbing / Mechanical

    Per Enoch City's general Builder Inspection Checklist, applicable line items depend on project scope.

  2. 2

    Final Inspection / Certificate of Occupancy

    Per the Builder Inspection Checklist.

See the full Enoch City inspection guide — scheduling & re-inspection fees →

Tips

  • Enoch City does not publish a dedicated tenant-improvement packet — the Commercial Building Permit Packet and 'Other' (additions/remodels) packet are the closest published references; confirm with the Building Department, (435) 586-1119, which document set and site-plan requirements apply to an interior-only commercial tenant finish.
  • No commercial or tenant-improvement-specific plan-review percentage is published in Fee Schedule Section 4.B — the base UBC-valuation Building Permit Fee plus 1% state surcharge is the only confirmed fee mechanism; confirm the applicable plan-review rate directly with the Building Department before budgeting.
  • The 'Other' Building Permit Packet (other_bp_packet_final_8-27-2020.pdf) — its checklist (Asbestos Inspection Certification, DOPL Owner/Builder Certification explicitly scoped to 'New Residential Construction' and 'Remodel or Addition by Owner,' zoning/subdivision verification) and its included Building Permit Application ('For New Residential Construction' fields: bedrooms, baths, setbacks) — is written for residential remodels/additions, not commercial tenant finish, despite that same generic application form carrying a 'COM (Commercial)' construction-type checkbox usable across all permit types. On the Applications & Forms page (enochcityut.gov/applications--forms.html), none of the ~10 posted building-permit-related PDFs is labeled tenant improvement or tenant finish. Enoch City genuinely has no distinct TI product: applicants are routed to either the full Commercial Building Permit Packet (built for new construction, including a zoning-administrator site-plan sign-off step that may be disproportionate for interior-only work) or the residential-oriented 'Other' packet, at the Building Department's case-by-case discretion — a confirmed absence. Owner-builder

Frequently asked questions

Enoch City requires a commercial tenant improvement / tenant finish permit for: Tenant improvement or remodel work within an existing commercial building; One digital set of plans (PDF) covering the affected scope: architectural, mechanical, plumbing, and electrical as applicable; Signed energy code compliance documentation, if the scope affects the building's energy envelope or systems; Complete building permit application form. If your project isn't listed, confirm with Enoch City Building Department (Community Development) at (435) 586-1119 before starting work.

In Enoch City, the published Building Permit Fee (base, UBC valuation table) is: Set by the Uniform Building Code valuation table, plus a 1% State of Utah surcharge.. Additional published fees: Plan Review Fee — Not published for tenant improvement as a distinct percentage tier. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Enoch City does not publish a plan-review timeline for this permit. Contact Enoch City Building Department (Community Development) at (435) 586-1119 for current turnaround.

You'll need: Building Permit Application; Digital Set of Plans (PDF). See the required-documents checklist on this page for details on each.

Enoch City requires 2 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Rough Electrical / Plumbing / Mechanical, Final Inspection / Certificate of Occupancy. Schedule each through Enoch City Building Department (Community Development) ((435) 586-1119).

Apply through Enoch City Building Department (Community Development) at 900 East Midvalley Road, Enoch, UT 84721. Phone: (435) 586-1119, email: inspector@enochcity.org. Office hours: Monday–Thursday 9:00 AM – 4:30 PM, Friday 9:00 AM – 1:00 PM, per enochcityut.gov footer contact block and the city's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015).. Official information: https://www.enochcityut.gov/building-department.html.

Enoch City, Utah has adopted: Uniform Building Code (UBC) valuation table — Enoch City's own Fee Schedule (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A) states: 'Building permit fees are set by the Uniform Building Code.' This is the same 1997 UBC Table 1-A valuation-fee structure referenced by other small Utah cities (e.g. Provo); Enoch's own published fee-schedule language uses 'Uniform Building Code' rather than citing a specific IBC/IRC edition year.; Statewide baseline per Utah Code § 15A-2-103: Utah's currently adopted statewide construction codes — the 2024 IBC (incl. Appendices C and J), 2024 IPC, 2024 IMC, 2024 IFGC, 2024 IECC, and 2024 IEBC (all in force since July 1, 2026, superseding the 2021 editions), alongside the unchanged 2021 IRC and 2023 NEC — apply to Enoch City by default absent a documented independent city-level code-adoption ordinance; Enoch City's own website does not publish a distinct 'Current Adopted Codes' page listing specific ICC edition years (unlike Cedar City's dedicated codes page), so the state baseline is reported here rather than invented city-specific edition years.. Local amendments apply — see the Enoch City overview page for the full list.

Enoch City does not publish a dedicated tenant-improvement packet or fee line. The base Building Permit Fee follows the same Uniform Building Code valuation table plus 1% state surcharge used for all permit types; contact the Building Department at (435) 586-1119 to confirm which site-plan and plan-review requirements apply to a specific tenant finish scope.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Enoch City.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

Enoch City's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Enoch City yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Enoch City lands. Privacy.