Inspection sequence, scheduling, and re-inspection fees for building permits in Cedar City, Utah.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
10 N Main Street, Cedar City, UT 84720
Phone
(435) 865-4519
Office hours
8:00 AM - 5:00 PM, per cedarcityut.gov/129/Building-Zoning.

Inspection sequence

Applies to: Residential Building Permit (New Construction, Single Family, Duplexes, Twin Homes, Townhomes)

  1. 1

    Footing Exterior

    Footing depth per plan; rebar chaired/secured/lapped per plan; rebar Ufer ground tied to footing bar. Per Cedar City Building Department Inspection Reference Guide.

  2. 2

    Interior Footing

    Placement of footing and rebar verified; no plumbing running parallel inside footing; pipes crossing footings protected; footing depth checked.

  3. 3

    Underground Electrical / Underground Mechanical / Underground Plumbing

    Trench depth, conduit/conductor sizing, direct-burial-listed ducts with sealed joints, pipe slope, cleanouts, backflow preventers on basements, minimum 10-foot water head test or 15-minute air test.

  4. 4

    Foundation Wall

    Rebar spacing/ties per plan, wall thickness per plan, hold-downs in proper locations, wall height matching engineering.

  5. 5

    Slab (suspended)

    Rebar size/spacing and slab thickness per plan.

  6. 6

    Temporary Power

    Panel pole secured, all circuits GFCI-protected, ground/neutral bonded.

  7. 7

    Roof

    Sheathing gap, nailing, thickness per span rating, truss condition and bracing per plan.

  8. 8

    Interior/Exterior Shear

    Sheathing type/size, nailing, hold-down hardware, anchor bolts per plan.

  9. 9

    Rough Mechanical / Rough Plumbing / Rough Electrical / Gas Piping

    Ductwork support and insulation, DWV water/air test, vent slope, outlet spacing, smoke/CO detector placement, gas line pressure test (1.5x working pressure, minimum 3 psig) with Cedar City gas clearance form on site.

  10. 10

    Framing

    All prior inspections approved; notching/boring of structural members checked; tempered glass in hazardous locations; stair construction; fire blocking; egress window sizing (max 44 in. to opening).

  11. 11

    Insulation

    Batts installed per manufacturer instructions with correct R-value; top/bottom plate holes sealed; window/door jambs sealed to meet IECC minimums.

  12. 12

    Lath / Drywall / Fire Assembly / Shower Pan

    Weather barrier and lath wire installation; Type X drywall over garages with living space above; fire-rated assembly verification; shower pan 2-inch water dam test.

  13. 13

    Permanent Power

    Rocky Mountain Power service order number provided at inspection request; grounding conductors landed; at least one GFCI outlet installed.

  14. 14

    Building Final

    Address permanently posted; all trades complete; site clean (no dumpster/porta-potty); driveway finished; grading slopes away from house; all required certificates (stucco, insulation, grading) on site; utilities hooked up and operational.

Applies to: Commercial Building Permit

  1. 1

    Footing / Foundation

    Footing depth and rebar per plan; per Cedar City Building Department Inspection Reference Guide, applicable to commercial as well as residential construction.

  2. 2

    Underground Electrical / Mechanical / Plumbing

    Trench depth, conduit/conductor sizing, pipe slope and pressure/water tests.

  3. 3

    Framing

    Structural framing verified against engineer-stamped plans; special inspections per the code analysis on file, where required.

  4. 4

    Rough Mechanical / Rough Plumbing / Rough Electrical

    Rough-in verified before insulation/drywall.

  5. 5

    Building Final

    All trades complete, site clean, utilities operational, required certificates on file.

Applies to: Electrical Permit (incl. Electric Meter)

  1. 1

    Temporary Power

    Panel pole secured, GFCI-protected circuits, ground/neutral bonded.

  2. 2

    Underground Electrical

    Trench depth and conduit/conductor sizing per code/utility standards.

  3. 3

    Rough Electrical

    Outlet spacing, conductor protection, smoke/CO detector placement, box grounding.

  4. 4

    Permanent Power

    Rocky Mountain Power service order number provided; grounding conductors landed; at least one GFCI outlet.

Applies to: Addition / Residential Remodel Permit (incl. Basement Finish)

  1. 1

    Framing

    Wall framing, fire blocking, and egress verified per Cedar City Inspection Reference Guide, applicable to structural additions.

  2. 2

    Rough Mechanical / Rough Plumbing / Rough Electrical

    Applicable to addition and remodel scope involving MEP changes.

  3. 3

    Building Final

    Address posted, trades complete, site clean, utilities operational.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Fire-Rated Assembly

    Wall construction and any fire-rated/occupancy separation assemblies verified before close-in.

  2. 2

    Rough Mechanical / Rough Plumbing / Rough Electrical

    Rough-in verified against submitted plans, where applicable to the tenant improvement scope.

  3. 3

    Building Final

    All finishes complete, exit signage and emergency lighting verified before occupancy.

Applies to: Mechanical Equipment Permit

  1. 1

    Underground Mechanical

    Direct-burial-listed ducts, sealed joints, supported in place.

  2. 2

    Rough Mechanical

    Ducts supported per manufacturer/code; unit support; duct insulation R-values (R-8 outside thermal envelope in attic, R-6 elsewhere); line-set protection; drain lines to approved location.

Applies to: Solar Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement per Cedar City Inspection Reference Guide, applicable to solar electrical scope.

  2. 2

    Permanent Power / Building Final

    Final verification including Rocky Mountain Power service order number, per Inspection Reference Guide.

Cedar City building permits

Get alerts for Cedar City

We'll email you when Cedar City's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.